Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-AOC | ₹18.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.1 LRejected-AOC | ₹19.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/s. S P N Construction L1 | R.Vasu L2 |
|---|---|---|---|---|---|
| 1.00Construction of Culvert (3.00m span) - @ Periyeripatti Eri in Supply Channel H/O Periyeripatti | |||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. | 164.83 | Cum | 262 ₹43,185.46 | 270 ₹44,504.10 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 33.73 | Cum | 5,539 ₹1.9 L | 5,600 ₹1.9 L |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc.. | 52.02 | Sqm | 547 ₹28,454.94 | 550 ₹28,611 |
| 5.00 | Deck Slab | 185.23 | Sqm | 1,095 ₹2.0 L | 1,120 ₹2.1 L |
| 6.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 150.37 | Cum | 6,290 ₹9.5 L | 6,400 ₹9.6 L |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 3.9 | Cum | 6,830 ₹26,637 | 7,000 ₹27,300 |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works..etc…, | 0.88 | MT | 91,850 ₹80,828 | 93,000 ₹81,840 |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 8.1 | Cum | 9,260 ₹75,006 | 9,500 ₹76,950 |
| 10.00 | Gravel filling between body wall inclding cost and convenyance of Gravel labour for filling watering and compacting etc.,complete complying with standard specification and as directed by the deportmental officer. | 12 | Cum | 280 ₹3,360 | 300 ₹3,600 |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
3 Feb 2026, 3:00 pmClosed
BDO(BP)
BDO Office, Omalur
Salem District - Omalur Block - Construction of Culvert (3.00m span) - at Periyeripatti Eri in Supply Channel H/O Periyeripatti Panchayat - MLACDS -2025-2026
2026_RDTN_646790_1
Roc.No.2634/2025/A5
Open Tender
Civil Works
90 days
BDO Office, Omalur
As per tender document
3 documents required · 3 mandatory
₹0
₹19,000
17 Feb 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
Construction of Culvert (3.00m span) - @ Periyeripatti Eri in Supply Channel H/O Periyeripatti
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc..
Deck Slab
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works..etc…,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Gravel filling between body wall inclding cost and convenyance of Gravel labour for filling watering and compacting etc.,complete complying with standard specification and as directed by the deportmental officer.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
01.pdf
Tender Documents • 1.29 MB
BOQ_775309.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid