| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Document incomplete |
| 3 | Rejected-Technical | - | - | Rejected-Technical Document incomplete |
| Sl No | Description | Qty | Unit | ANUSKA ASSOCIATE L1 |
|---|---|---|---|---|
| 0.00The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | ||||
| 1.00 | E/W excavation in foundation of MKR mixed soil including initial lead and lift etc. for proper completion of work. But excluding GST. | 1,236.48 | cum | 112 ₹1,38,485.76 Lowest |
| 2.00 | Supplying and laying sand in inverted filter including cost of material, labour T&P etc with all leads and lifts for proper completion of work. But excluding GST. | 30.81 | cum | 1,726.2 ₹53,184.22 Lowest |
| 3.00 | Laying P.C.C. 1:3:6 in foundation with all cost of sand cement and stone ballast T&P etc reguard for completion of work. But excluding GST. | 30.81 | cum | 3,972.75 ₹1,22,400.43 Lowest |
| 4.00 | Supplying and fixing 150 mm hume pipe including cost of material, labour T&P etc with all leads and lifts for proper completion of work. But excluding GST. | 442.5 | RM | 477.89 ₹2,11,466.33 Lowest |
| 5.00 | Ist Class brick work in 1:4 cm with approved courase sand including cost of material labour T&P etc with all leads and lifts for proper completion of Job. But excluding GST. | 45.63 | cum | 5,576.2 ₹2,54,442.01 Lowest |
| 6.00 | Laying C.C. in 1:2:4 in over plinth with 10 mm stone grit and approved courase sand including cost of material, labour T&P etc with all leads and lifts for proper completion of work. But excluding GST. | 11.94 | cum | 4,774.5 ₹57,007.53 Lowest |
| 7.00 | 12.50 mm thick plaster in 1:4 cm over B/W including cost of material, labour, T&P and proper completion of work.But excluding GST. | 519.48 | sqm | 176.39 ₹91,631.08 Lowest |
| 8.00 | Center and shuttering for C.C. work including all cost of material labour, T&P and proper completion of work. But excluding GST. | 275.67 | sqm | 765.94 ₹2,11,146.68 Lowest |
| 9.00 | Earth Work in back filling with all cost of labour T&P etc all complete But excluding GST. | 989.22 | cum | 50.71 ₹50,163.35 Lowest |
Tender Value
₹12.7 L
EMD Value
₹25,500
Closing Date
25 Sept 2025, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Construction of outlets at bank side and service road side in Ghatkana, Khair, Marauli, Gusiyari, Ichauli minor II, Atghar minor I, Athar minor II, Tikri minor offtaking from Kabrai main canal.
2025_UPIDC_1072977_12
03/EE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Distt Mahoba
AS PER NIT
2 documents required · 2 mandatory
₹840
₹25,500
23 Dec 2025
11 Sept 2025
25 Sept 2025
11 Sept 2025
25 Sept 2025
11 Sept 2025
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/W excavation in foundation of MKR mixed soil including initial lead and lift etc. for proper completion of work. But excluding GST.
Supplying and laying sand in inverted filter including cost of material, labour T&P etc with all leads and lifts for proper completion of work. But excluding GST.
Laying P.C.C. 1:3:6 in foundation with all cost of sand cement and stone ballast T&P etc reguard for completion of work. But excluding GST.
Supplying and fixing 150 mm hume pipe including cost of material, labour T&P etc with all leads and lifts for proper completion of work. But excluding GST.
Ist Class brick work in 1:4 cm with approved courase sand including cost of material labour T&P etc with all leads and lifts for proper completion of Job. But excluding GST.
Laying C.C. in 1:2:4 in over plinth with 10 mm stone grit and approved courase sand including cost of material, labour T&P etc with all leads and lifts for proper completion of work. But excluding GST.
12.50 mm thick plaster in 1:4 cm over B/W including cost of material, labour, T&P and proper completion of work.But excluding GST.
Center and shuttering for C.C. work including all cost of material labour, T&P and proper completion of work. But excluding GST.
Earth Work in back filling with all cost of labour T&P etc all complete But excluding GST.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .