| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC | ₹23.0 L | L1 | Accepted-AOC WORK ORDER |
| 2 | L2₹24.3 L+₹1.3 L (5.78%)Rejected-Finance | ₹24.3 L+₹1.3 L (5.78%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Sugan K L2 | S.RAVI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.0004) Providing Cement Concrete Drainage From Drama Stage to PUE School H/ O Konur ESTIMATE COST : 23.30 Lakhs | |||||
| 2.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 418.2 | Cum | 280 ₹1,17,096 | 263 ₹1,09,986.6 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 41.82 | Cum | 5,700 ₹2,38,374 | 5,411 ₹2,26,288.02 Lowest |
| 4.00 | Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete. | 979.29 | Sqm | 580 ₹5,67,988.2 | 547 ₹5,35,671.63 Lowest |
| 5.00 | RCC 1:1:5:3 mix using 20mm ISS HBG metal including all cost, conveyance of all materials to site and all labour charges etc., complete. | 17.48 | nos | 9,700 ₹1,69,556 | 9,150 ₹1,59,942 Lowest |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1.05 | nos | 97,500 ₹1,02,375 | 91,930 ₹96,526.5 Lowest |
| 7.00 | Cement concrete 1:3;6 mix using 40mm ISS HBG metal including all cost, conveyance of all materials to site and all labour charges etc., complete. | 132.84 | Cum | 6,000 ₹7,97,040 | 5,685 ₹7,55,195.4 Lowest |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 221.4 | Sqm | 300 ₹66,420 | 283 ₹62,656.2 Lowest |
| 9.00 | Provision for Name board charges | 1 | nos | 1,050 ₹1,050 | 1,000 ₹1,000 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} | 1 | GST Amount | 3,70,781.86 ₹3,70,781.86 | 3,50,507.94 ₹3,50,507.94 Lowest |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
13 Feb 2026, 3:00 pmClosed
The Project Director DRDA Dindigul
The Project Director DRDA Dindigul
Capital Grant Fund Savings and Interest Scheme 2025- 2026 Providing new cement concrete Drainage at Drama stage to PUE school - Konur in Reddiyarchatram block of Dindigul District Package No. TN05-124
2026_RDTN_652271_1
DIPR-542-Tender 2026
Open Tender
Civil Works
Item Wise
120 days
DRDA DINDIGUL
Capital Grant Fund Savings and Interest Scheme 2025- 2026 Providing new cement concrete Drainage at Drama stage to PUE school - Konur in Reddiyarchatram block of Dindigul District Package No. TN05-124
2 documents required · 2 mandatory
₹0
₹24,000
DRDA DINDIGUL
6 Apr 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
11 Feb 2026
04) Providing Cement Concrete Drainage From Drama Stage to PUE School H/ O Konur ESTIMATE COST : 23.30 Lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
RCC 1:1:5:3 mix using 20mm ISS HBG metal including all cost, conveyance of all materials to site and all labour charges etc., complete.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement concrete 1:3;6 mix using 40mm ISS HBG metal including all cost, conveyance of all materials to site and all labour charges etc., complete.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_782128.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .