Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.6 L+₹25,466.87 (19.4%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.6 L+₹27,425.86 (20.9%)Admitted-Fee/PreQual/Technical/Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.7 L+₹35,261.82 (26.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹1.8 L+₹48,974.75 (37.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
12 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,WRD
O/o, The Executive Engineer, WRD., Periyar Main Canal Division, Melur.
Special repairs to LS 1550m - 2950m of 3rd Disributary in 12th BC of Periyar Main canal in Sennagarampatti village of Melur Taluk in Madurai District.
2026_WRD_717011_1
02 2026-2027 JDO2 F.105 DATED.22.10.2026
Open Tender
Civil Works
Percentage
90 days
Sennagarampatti
4 documents required · 4 mandatory
₹0
₹2,000
Yes
13 Nov 2026
24 Oct 2026
13 Nov 2026
24 Oct 2026
12 Nov 2026
24 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fabricating, Supplying and erection of Screw gearing steel shutters of size above upto 1.00 m width consist shutters of skin plate made out of 8mm thick mild steel plate and horizontally stiffened with 65x65x6mm mild steel Angle at an interval not more than 0.50m and vertical stiffeners made out of same section at an interval not more than 0.60m and provided with 8mm mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipment. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipment. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipment required conveying the dismantled materials to the section stores, cost of petty civil works, trialoperation of shutter and warranty for 5 years etc.,complete. | 1.12 | Square Metre | 57,527 | ₹64,430.24 |
| 2 | Fabrication, Supplying and Fixing of 50mm dia Screw Rod made up of Mild Steel duly machined and fully threaded to suit the Head set Assembly and provided with required holes. Conveying and leading the screw rod to the worksite. Fixing the screw rod to the shutter gusset plate with required bolt and nut in proper alignment to the head set including dismantling the existing damaged screw rod,conveying and stacking at section store. The Serew rod should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours, charges for all fabricating and hoisting equipments, conveyance charges for labours and materials and warranty for 5 years ete., complete Screw Rod 50mm Dia | 1.5 | Running Meter | 12,280 | ₹18,420 |
| 3 | Supplying and fixing of Head Set Assembly medium duty with hexagonal nut (Approximate 70 Kg) made up of cast iron including moulding, machining and the hexagonal nut threaded to suit the Screw Rod provided with thrust bearings for smooth operation. Conveying and leading the head set assembly to the work site. Fixing the head set assembly to the top beam by using required rust fre bolts and nuts in proper alignment including dismantling the existing damaged Head set assembly, conveying and stacking at sectio store. The Head set assembly supplied with operating key and the both should be painted with two coats of AC black paint over one coat of red oxide primer. The rate including cost of materials, labours charges for wooden pattern, moulding and charges for labours and materials and warranty for 5 years etc., complete. | 1 | Number | 55,459 | ₹55,459 |
| 4 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) | 3.12 | Cubic Meter | 147.02 | ₹458.7 |
| 5 | Random Rubble masonry (new) in Cement mortar 1:4 ( One cement and four sand by volume mixed mechanically in approved mixer) using Hard granite stones and bond stones from approved sources including simultaneous pointing of the exposed surface with same mortar and all incidental charges such as bailing out water, watering, curing, finishing etc, complete as directed by the Engineer in charge of works and as per the technical specifications | 1.64 | Cubic Meter | 6,006.08 | ₹9,849.97 |
| 6 | Pointing with Cement Mortar 1:3 ( one cement and three sand ) using 20 mm deep including curing and finishing etc complete complying with standard specification | 6.58 | Square Metre | 321.65 | ₹2,116.46 |
| 7 | Lining with insitu plain cement concrete of grade M15 design mix, 20mm size HBGS stone jelly 7.50cm thick for bed and sides of the canal, as specified by the departmental officer finishing the top surface of concrete with extra cement content at 1.50kg/m2 curing etc. complete as derected by the departmental officers. For 10m2 | 2 | Square Metre | 725.19 | ₹1,450.38 |
| 8 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth (SS20B) | 157 | Cubic Meter | 88.1 | ₹13,831.7 |
| 9 | Gst 18% | 1 | No | 1 | ₹1 |
| 10 | Sub Total | 1 | No | 1 | ₹1 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
pmcdocument66.pdf
Tender Documents • 0.64 MB
BOQ_861254.xls
BOQ • 0.35 MB
2ndextensionnotice.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .