Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC NOT SPECIFIED | ₹1.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.3 CrRejected-AOC NULL | ₹1.3 Cr | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | B.B.C. CONSTRUCTIONS L2 | SOKHAL CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 498.3 | Cum | 86 ₹42,853.80 | 81 ₹40,362.30 |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 860.7 | Cum | 121 ₹1.0 L | 114 ₹98,119.80 |
| 3.00 | Dressing of New Earthwork | 6,862.95 | Sqm | 1 ₹6,862.95 | 1 ₹6,862.95 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 54.36 | Cum | 151 ₹8,208.36 | 147 ₹7,990.92 |
| 5.00 | Re-handling of earthwork recently executed | 498.3 | Cum | 68 ₹33,884.40 | 64 ₹31,891.20 |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 14.86 | KM | 848 ₹12,601.28 | 848 ₹12,601.28 |
| 7.00Dismantling Brick Work in Cement | |||||
| 8.00 | Dressing of Bed and Preparation of Sub-grade for Lining | 7,274.49 | Sqm | 11 ₹80,019.39 | 11 ₹80,019.39 |
| 9.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls | 1,696.48 | Cum | 6,656 ₹1.1 Cr | 6,392 ₹1.1 Cr |
| 10.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 4,938.73 | Sqm | 190 ₹9.4 L | 181 ₹8.9 L |
Updated dates
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
3 Nov 2025, 10:00 amClosed
Xen Fazilka Canal And Ground Water Division CC FZR
Xen Fazilka Canal And Ground Water Division CC FZR
Estimate for Lining of Watercourse of Outlet RD 1780/R of Hauz disty by Brick Masonry of Village Paliwala Distt Fazilka
2025_WR_151209_22
012/FazilkaCanal/2025-26 dated 30/09/2025
Open Tender
Civil Works - Canal
45 days
Xen Fazilka Canal And Ground Water Division CC FZR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹2.4 L
Yes
8 Jan 2026
1 Oct 2025
3 Nov 2025
1 Oct 2025
3 Nov 2025
1 Oct 2025
Amount
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.
Dressing of New Earthwork
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed.
Re-handling of earthwork recently executed
Dag belling single kassi stroke minimum 7.5 cm depth.
Dismantling Brick Work in Cement
Dressing of Bed and Preparation of Sub-grade for Lining
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls
10 mm thick Cement Plaster 1:4 on Side Walls
10 mm thick Cement Plaster 1:4 on Floors
Providing & Laying Dry Brick Bats
Providing & Laying Brick Ballast
Supplying of RCC Shutter with One Extra Frame for Nakka and Branch Offtakes
Fixing of Shutter and Frames for Nakka and Branch Offtakes
Providing & laying Cement Concrete 1:6:12
Providing,lowering,jointing & cutting of RCC pipes 600mm dia into trenches & laying same to correct alignment
Any Other Item
B.B.C. CONSTRUCTIONS (BID ID -693878)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_306286.xls
BOQ • 0.26 MB
SBD02_merged.pdf
Tender Documents • 15.99 MB
Download all tender documents and submit your bid