Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74,452.52Accepted-Finance | L1 | Accepted-Finance ALL DOX OK | |
| 2 | L2₹74,851.80+₹399.28 (0.54%)Accepted-Finance | L2 | Accepted-Finance ALL DOX OK | |
| 3 | L3₹76,999.98+₹2,547.46 (3.42%)Accepted-Finance R O DODA TEHSILD AND DISTT DODA | L3 | Accepted-Finance ALL DOX OK | |
| 4 | L4₹84,493.40+₹10,040.88 (13.5%)Accepted-Finance | L4 | Accepted-Finance ALL DOX OK | |
| 5 | L5₹86,515.90+₹12,063.38 (16.2%)Accepted-Finance | L5 | Accepted-Finance ALL DOX OK |
Tender Value
₹98,000
Closing Date
29 Jul 2021, 9:00 amClosed
Seed Development Division Janipur, Jammu
Seed Development Division Janipur, Jammu
construction of Motor Room at Sidhra Nursery III
2021_FD_129688_1
e-NIT No.02 of 2021-22
Open Tender
Civil Works
Item Rate
45 days
Sidhra FRI Nursery
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Seed Development Division Janipur, Jammu
Exempted
30 Jul 2021
6 Jul 2021
30 Jul 2021
6 Jul 2021
29 Jul 2021
7 Jul 2021
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) including all leads lift and carriage complete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% boulder. including all leads lift and carriage complete
Dumping of stones incl supply of boulders including all leads lift and carriage complete
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand)including all leads lift and carriage complete
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
Centring and shuttering including strutting, propping, etc.and removal of form for :Foundations: footings, bases of columns etc. for mass concrete.
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)including all leads lift and carriage complete
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)including all leads lift and carriage complete
15mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)including all leads lift and carriage complete
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.25mm thick with 12.5 mm nominal size stone aggregate. including all leads lift and carriage complete
Colour washing such as green blue or buff to give an even shade New work (two or more coats) with a basecoat of white washing with lime
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (Frame with Shutter) including sheet with Painting
SOHAIL MALIK
ZAFFAR ALTAF PATIGAROO
SHASHI KUMAR ATRI
Zaffer Iqbal Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .