Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
25 Aug 2023, 4:00 pmClosed
Superintending Engineer O and MC II BTPS Anpara
Office of Superintending Engineer O and MC II BTPS Anpara
Routine preventive and breakdown maintenance of sky climber of main boiler and all Mech parts of Monorail Electric Hoist of different capacity installed at different elevations of boiler APH ESP etc of Unit No 4 and 5 2X500MW BTPS and Unit No 6and
2023_RVUNL_823664_1
T-15/BMD-I/BTPS/2023-24
Open Tender
Miscellaneous Works
Fixed-rate
730 days
Anpara Thermal Power Plant Anpara
As per PQC of the tender
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA and BO BTPS Anpara
₹45,000
23 Sept 2023
24 Jul 2023
28 Aug 2023
24 Jul 2023
25 Aug 2023
24 Jul 2023
24 Jul 2023 - 24 Aug 2023
Amount
Part - A Routine maintenance For Anpara BTPS Routine and Preventive Maintenance of Sky Climber of main Boiler and electric Hoist of APH, ESP, Economizer Maintenance Platform/Yard Boiler Unit No. 4&5, 2x500 MW, BTPS Anpara. 1. Cleaning and UP keeping of Mono Rail, wheels & complete body of Electrical Hoist for Safe, smooth &trouble free movement. 2. Daily checking and top-up of Lubricants/grease in all gear boxes of Electric hoists of ESP, APH, Main Boiler and Economizer maintenance platform. 3. Regular checking for jamming of rotating parts. 4. Firm has to engage one skilled technician to be with the sky climber during up & down movement of the sky climber in the furnace of the Boiler to attend the problem / faults of sky climber during operation. 5. Shifting of two no. exhaust fan from zero meter and erection & connection of the same in the pent house of Boiler during breakdown and overhauling period and vice versa after completion of the work.
For Anpara DTPS “Daily up keeping and preventive maintenance of all mech. parts of Mono Rail Electric Hoist (01-10 Ton Capacity) of APH,ESP, SCAPH,CCP & ECO/LTSH Maintenance Platform/Yard and sky climber of unit no. 6&7, 2x500 MW, DTPS, Anpara.”
Part - B Breakdown maintenance For Anpara BTPS Breakdown maintenance/Servicing of traverse motor gear box assy. of hoist of ESP of unit # 4&5.
Breakdown maintenance/Servicing of traverse motor gear box assy. of hoist 01 Ton of main boiler of unit # 4&5.
Breakdown maintenance/Servicing of traverse motor gear box assy. of hoist 10 Ton of Eco. Maintenance Platform of unit # 4&5.
Breakdown maintenance/Servicing of traverse motion Chain pulley system of hoist of APH of unit # 4&5.
Breakdown maintenance/Servicing of rotary motor gear box assy. of ESP of unit # 4&5.
Breakdown maintenance/Servicing of rotary motor gear box assy. of hoist of 01 Ton of main boiler of unit # 4&5.
Breakdown maintenance/Servicing of rotary motor gear box assy. of hoist 10 Ton of Eco. Maintenance Platform of unit # 4&5.
Breakdown maintenance/Servicing of rotary motor gear box assy. of hoist of APH of unit # 4&5.
Servicing of Hooks, Rope Pulley, Break shoe of hoist of ESP of unit # 4&5.
Servicing of Hooks, Rope Pulley, Break shoe of hoist of 01 Ton capacity of main boiler of unit # 4&5 of unit # 4&5.
Servicing of Hooks, Rope Pulley, Break shoe of hoist of 10 Ton capacity of Eco. Maintenance Platform of unit # 4&5.
Servicing of Hooks, Rope Pulley, Break shoe of hoist of APH of unit # 4&5.
Rectification/Replacement of wire rope of ESP of unit # 4&5.
Rectification/Replacement of wire rope of hoist of 01 Ton capacity of main boiler of unit # 4&5 of unit # 4&5.
Rectification/Replacement of wire rope of hoist of 10 Ton capacity of Eco. Maintenance Platform of unit # 4&5.
Rectification/Replacement of wire rope of hoist of APH of unit # 4&5.
Smoothening of Swirling/Twisted rope of hoist of ESP of unit # 4&5.
Smothering of Swirling/Twisted rope of hoist of 01 Ton capacity of main boiler of unit # 4&5.
Smoothening of Swirling/Twisted rope of hoist of 10 Ton capacity of Eco. Maintenance Platform of unit # 4&5.
Smothering of Swirling/Twisted rope of hoist of APH of unit # 4&5.
Attending faults after Lowering and Lifting the hoist of 01 Ton capacity of main boiler in position from monorail/traveling beam of unit # 4&5.
Attending faults after Lowering and Lifting the hoist in position from monorail/traveling beam of ESP of unit # 4&5.
Attending faults after Lowering and Lifting the hoist of 10 Ton capacity of Eco. Maintenance Platform in position from monorail/traveling Beam of unit # 4&5.
Attending faults after Lowering and Lifting the hoist in position from monorail/traveling beam of APH of unit # 4&5.
Complete servicing of control panel box of sky climber (Motorized Rope Climbing Machine) of main boiler of unit # 4&5.
Complete servicing of gear box, break assembly, internal drums and rollers of sky climber motor assembly of main boiler of unit # 4&5.
For Anpara DTPS Alignment and surface preparation of mono rail & electric hoist of APH of unit # 6 & 7 , Cap- 2 Ton
Alignment and surface preparation of mono rail & electric hoist of ESP of unit # 6 & 7 , Cap- 3 Ton
Alignment and surface preparation of mono rail & electric hoist of CC Pump of unit # 6 & 7 , Cap- 5 Ton
Alignment and surface preparation of mono rail & electric hoist of ECO/ LTSH of unit # 6 & 7 , Cap- 6 Ton
Alignment and surface preparation of mono rail & electric hoist of SCAPH of unit # 6 & 7 , Cap- 7.5 Ton
Breakdown maintenance /Servicing of Traverse motor gearbox assy. of APH of unit # 6 & 7 , Cap- 2 Ton
Breakdown maintenance / Servicing of Traverse motor gearbox assy. Of ESP of unit # 6 & 7 , Cap- 3 Ton
Breakdown maintenance / Servicing of Traverse motor gearbox assy. Of CC Pump of unit # 6 & 7 , Cap- 5 Ton
Breakdown maintenance / Servicing of Traverse motor gearbox assy. Of ECO/ LTSH of unit # 6 & 7 , Capacity- 6 Ton
Breakdown maintenance / Servicing of Traverse motor gearbox assy. Of SCAPH of unit # 6 & 7 , Capacity- 7.5 Ton
Breakdown maintenance / Servicing of Rotary motor gearbox assy. of hoist of APH of unit # 6 & 7 , Capacity- 2 Ton
Breakdown maintenance / Servicing of Rotary motor gearbox assy. of hoist of ESP of unit # 6 & 7 , Capacity- 3 Ton
Breakdown maintenance / Servicing of Rotary motor gearbox assy. of hoist of CC Pump of unit # 6 & 7 , Capacity- 5 Ton
Breakdown maintenance / Servicing of Rotary motor gearbox assy. of hoist of ECO/ LTSH of unit # 6 & 7 , Capacity- 6 Ton
Breakdown maintenance / Servicing of Rotary motor gearbox assy. of hoist of SCAPH of unit # 6 & 7 , Capacity- 7.5 Ton
Servicing of Hooks, Rope Pulley, Break shoe of hoist of APH of unit # 6 & 7 , Capacity- 2 Ton
Servicing of Hooks, Rope Pulley, Break shoe of hoist of ESP of unit # 6 & 7 , Capacity- 3 Ton
Servicing of Hooks, Rope Pulley, Break shoe of hoist of CC Pump of unit # 6 & 7 , Capacity- 5 Ton
Servicing of Hooks, Rope Pulley, Break shoe of hoist of ECO/ LTSH of unit # 6 & 7 , Capacity- 6 Ton
Servicing of Hooks, Rope Pulley, Break shoe of hoist of SCAPH of unit # 6 & 7 , Capacity- 7.5 Ton
Rectification / Replacement of wire rope and break shoe of hoist of APH of unit # 6 & 7 , Capacity- 2 Ton
Rectification / Replacement of wire rope and break shoe of hoist of ESP of unit # 6 & 7 , Capacity- 3 Ton
Rectification / Replacement of wire rope and break shoe of hoist of CC Pump of unit # 6 & 7 , Cap- 5 Ton
Rectification / Replacement of wire rope and break shoe of hoist of ECO/ LTSH of unit # 6 & 7 , Cap- 6 Ton
Rectification / Replacement of wire rope and break shoe of hoist of SCAPH of unit # 6 & 7 , Cap- 7.5 Ton
Smoothening of Swirling / Twisted Rope of hoist of hoist of APH of unit # 6 & 7 , Capacity- 2 Ton
Smoothening of Swirling / Twisted Rope of hoist of hoist of ESP of unit # 6 & 7 , Capacity- 3 Ton
Smoothening of Swirling / Twisted Rope of hoist of hoist of CC Pump of unit # 6 & 7 , Capacity- 5 Ton
Smoothening of Swirling / Twisted Rope of hoist of hoist of ECO/ LTSH of unit # 6 & 7 , Capacity- 6 Ton
Smoothening of Swirling / Twisted Rope of hoist of hoist of SCAPH of unit # 6 & 7 , Capacity- 7.5 Ton
Attending faults after Lowering and Lifting the hoist in Position from monorail/ traveling Beam of APH of unit # 6 & 7 , Capacity- 2 Ton
Attending faults after Lowering and Lifting the hoist in Position from monorail/ traveling Beam of ESP of unit # 6 & 7 , Capacity- 3 Ton
Attending faults after Lowering and Lifting the hoist in Position from monorail/ traveling Beam of CC Pump of unit # 6 & 7 , Capacity- 5 Ton
Attending faults after Lowering and Lifting the hoist in Position from monorail/ traveling Beam of ECO/ LTSH of unit # 6 & 7 , Capacity- 6 Ton
Attending faults after Lowering and Lifting the hoist in Position from monorail/ traveling Beam of SCAPH of unit # 6 & 7 , Capacity- 7.5 Ton
Complete Servicing of Control Panel Box of Sky Climber (Motorized Rope Climbing Machine) of Main Boiler of U 6 &7.
Complete Servicing of Gear box, Break Assembly, Internal Drums and Rollers of Sky Climber motor assy of Main Boiler of Unit # 6 & 7.
M/S SHYAM ERECTORS
M/S R L ENGINEERING
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .