Loading…
Loading…
Tender Value
₹120.1 Cr
EMD Value
₹50 L
Closing Date
19 Jun 2026, 6:00 pm
Chief Engineer
CE PWD REWA ZONE REWA
Construction of Sihawal (Bichi) Khairpur to Bichi, Bagdara, Gopla, Padri Gate length of CC road 56,600 meters (MDR 12-01) Under Sub-division Chitrangi (M.P.)
2026_PWDRB_509893_1
03/Gen./2026-27 Dt. 25-05-2026
Open Tender
Civil Works - Roads
730 days
Singrauli
Please refer tender document
4 documents required · 4 mandatory
₹50,000
₹50 L
29 May 2026
29 May 2026
22 Jun 2026
29 May 2026
19 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees having girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
A In area of light jungle | - | Hect | 29,409 | - | 2.2 |
| 2 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification. | 1 | cum | 79 | ₹78.92 | 3.3 |
| 3 | Excavation in Hard Rock with disposal upto 1000 metres Excavation for roadway in hard rock with rock breakers i/c breaking rock or by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with all lifts and leads upto 1000 metres and as per relevent clauses of section-300 of specification. | - | Cum | 297 | - | 3.5 |
| 4 | Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials having CBR>7 deposited at site from roadway cutting and excavation from drain or foundation of structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300. | 1 | cum | 60 | ₹59.94 | 3.14 |
| 5 | Embankment/ Sub Grade Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300. | 0.29 | cum | 298 | ₹86.42 | 3.13 |
| 6 | Crusher Run Macadam Sub Base/Base Course Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller as per clause 410 to form a layer of sub-base/Base in accordance to Table No. 400-14, 400-15 and as per clause of section 407 of specifications.
(ii) For 37.5 mm maximum size | - | cum | 1,198 | - | 4.2 |
| 7 | Providing and laying reinforced cement concrete pipe NP-4 for service ducts below concrete pavement.
a) 300 mm Dia | - | Rm | 850 | - | 6.15 |
| 8 | Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope & camber of 4% and compacting on OMC using vibratory roller of 80 to 100 kN static weight. Field compaction shall be done in corresponding layers of carriage way thickness and meet the requirements of MDD to achieve compaction (98% -100%) as per relevant clause of 408.
(A) Hard Shoulders (CBR value >12) | - | cum | 398 | - | 4.16 (A) |
| 9 | Kilo Metre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (i) 5th kilometre stone (precast) | 11 | each | 3,686 | ₹40,546 | 8.36 (i) |
| 10 | Ordinary Kilometer stone (Precast) | 56 | each | 2,131 | ₹1,19,336 | 8.36 (ii) |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 23.09 MB
Tendernotice_2.pdf
PDF • 0.69 MB
BOQ_615769.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid