Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ATTACH |
| 2 | Accepted-Technical | Accepted-Technical ATTACH |
| 3 | Accepted-Technical | Accepted-Technical ATTACH |
| 4 | Accepted-Technical | Accepted-Technical ATTACH |
| 5 | Accepted-Technical | Accepted-Technical ATTACH |
Tender Value
₹60.8 L
EMD Value
₹5.0 L
Closing Date
6 Jan 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MI BANDA
EE MI BANDA
Construction of Chekdam Cum Rapta Bahadurpur Kalinjar Block Naraini Lot-01
2025_UPMID_1102642_1
1266/MI/JET/2025-26 Dt 22-12-2025
Open Tender
Civil Works
Percentage
60 days
BANDA
Construction of Chekdam Cum Rapta Bahadurpur Kalinjar Block Naraini Lot-01
2 documents required · 2 mandatory
₹3,300
EE MI BANDA
₹5.0 L
Yes
EE MI BANDA
9 Jan 2026
31 Dec 2025
7 Jan 2026
31 Dec 2025
6 Jan 2026
31 Dec 2025
31 Dec 2025 - 6 Jan 2026
31 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Making approach road by E/W Cutting or embankment in bc soil. | 113.75 | m³ | 95.2 | ₹10,829 |
| 2 | Earthwork excavation in mar kabar, rankar and kankar mixed hard soil including lead 30 m and lift 1.5m 40% of E/W | 241.81 | m³ | 95.2 | ₹23,020.31 |
| 3 | As above Earthwork but ift 1.5m to bed level is 60% of E/W | 362.72 | m³ | 101.5 | ₹36,816.08 |
| 4 | Earth Work in excavation in Mar, Kabar Rankar and Kankar mixed saturated soil . With 5 lifts & 30 m lead | 314.89 | m³ | 115.6 | ₹36,401.28 |
| 5 | Removal of slush from bed of Nala before excavation of saturated soil. | 85.87 | m³ | 258.3 | ₹22,180.22 |
| 6 | C.C.in 1:3:6 Cement, Sand and 20 to 40 mm Granit Stone Grit including the cost of materials labours and etc. required for proper completion of work. | 344.56 | m³ | 4,775.4 | ₹16,45,411.82 |
| 7 | R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. | 189.97 | m³ | 5,435.9 | ₹10,32,657.92 |
| 8 | R.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. | 439.99 | m³ | 4,373.6 | ₹19,24,340.26 |
| 9 | S/Laying 600mm Dia NP3 Hume Pipe | 90 | Rm | 6,476 | ₹5,82,840 |
| 10 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm Granit Stone grit including the cost of materials labours and etc.to required for proper completion of work. | 93.69 | m³ | 5,680.3 | ₹5,32,187.31 |
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_2033127.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .