Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | Admitted-Finance |
| 2 | Admitted-Finance CORE 3 SCOPE COMPLEX 7 INSTITUTIONAL AREA LODHI ROAD CENTRAL DELHI DELHI 110003 | NEW DELHI | DELHI | 110003 | Admitted-Finance |
| 3 | Admitted-Finance 16A 1 EARLE STREET FLAT N 1 FIRST FLOOR KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | Admitted-Finance |
| 4 | Admitted-Finance 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
5 Apr 2021, 6:00 pmClosed
AGM Engg. (C)
O/o Executive Director, Engg.-NER, AAI Operational Offices, Rangpuri, New Delhi-110037
Construction of New Greenfield Airport at Holongi, Itanagar, Arunachal Pradesh. Phase-II Construction of Complete city side and balance air side Infrastructure. (3rd Call)
2021_AAI_69026_1
AAI/CHQ/ED(NER)Holongi/2021
Open Tender
Civil Works - Buildings
EPC Contract
455 days
Holongi Airport Itanagar Arunachal Pradesh
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
Exempted
18 Jun 2021
19 Feb 2021
7 Apr 2021
20 Feb 2021
5 Apr 2021
17 Mar 2021
20 Feb 2021 - 2 Mar 2021
Amount
Detailed Designing, Engineering, Procurement and Construction of Terminal Building, Fire Station, ATC Tower cum Technical Block, Residential Complex, E&M workshop, Medical Centre, DVOR Building, Pump house Building, Sub Station, Car Park, etc i/c all Civil works, Electrical, Mechanical, Plumbing, Fire Fighting, HVAC, Airport System, IT , Furniture and Furnishing, landscape, Roads/ Pavements, drainage, STP and Ancillary works i/c Civil repair, maintenance and maintenance of Airport system and IT system complete for the period of 07 years including Defect Liability Period and warranty period; Operation & maintenance of Electrical Installations during Defect Liability Period (DLP) & after DLP for the period as specified in Special Conditions of Contract for E&M works for New Greenfield Airport, Holongi, Itanagar, Arunachal Pradesh as per Master plan, Specifications, Codes & Practices contained in the Tender Document. The design of facilities shall confirm to standard specified by FAA,ICAO, DGCA, AAI, MORTH, IRC, NBC,CPWD,IS etc. wherever required and in conformity with ATM/CNS/IMD/BCAS regulations regarding permissible heights, locations requirements etc. i/c all other works covered under Scope of work and meeting all relevant statutory requirements complete as required.
Civil works as above i/c Civil repair and maintenance for the period of 7 years including the 2 year DLP. (Rates are inclusive of civil repair & Maintenance. No Extra Payment shall be made on account of civil repair and maintenance activities for the period of 7 years. However, 5.5 % of the quoted amount in this cost head will be withheld by withholding 5.5% in all running bills and the same shall be released over 5 years period of Civil repair and maintenance after DLP as per the breakup details given in Appendix XVII). Refer Clause 16 of Special Conditions of Contract( SCC).
Electrical & Mechanical (E&M) Installations. Refer Appendix-A of Special Conditions of Contract for E&M Works
Airport system which includes CCTV, FIDS,EPABX etc. with maintenance of four years after completion of 3 years warranty period. (Rates are inclusive of AS CAMC for four years after 3 years warranty period. No Extra Payment shall be made on account of AS CAMC for four years after 3 years warranty period. However, 19 % of the quoted amount in this cost head will be withheld by withholding 19% in all running bills and the same shall be released over 4 years period of CAMC after 3 years of warranty period as per the breakup details given in Appendix XVII)
IT networking, etc. with maintenance for 7 years including DLP. (Rates are inclusive of IT Operation & Maintenance. No Extra Payment shall be made on account of IT Operation and maintenance activities for the period of 7 years i/c DLP. However, 21.75 % of the quoted amount in this cost head will be withheld by withholding 21.75% in all running bills and the same shall be released over 7 years period of IT operation and maintenance as per the breakup details given in Appendix XVII).
PREVENTIVE MAINTENANCE OF COMPLETE ELECTRICAL SYSTEM (ONE SHIFT) Periodical Preventive Maintenance of Electrical & Mechanical Installations as provided under the main contract and specified in the Special conditions of the contract involving repairs & maintenance & attending to complaints / faults/ breakdowns and taking rectification action, ensuring serviceability / satisfactory working condition of the systems, preventive maintenance, maintenance of records / documentations etc., as per the detailed specifications, terms & conditions covered under this contract.
First year of Defect Liability Period (DLP)
Second year of Defect Liability Period (DLP)
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
OPERATION AND ROUTINE MAINTENANCE OF COMPLETE ELECTRICAL SYSTEM (ROUND THE CLOCK) Operation and routine Maintenance of Electrical & Mechanical Installations as provided under the main contract and specified in the Special conditions of the contract involving repairs & maintenance & attending to complaints / faults/ breakdowns and taking rectification action, ensuring serviceability / satisfactory working condition of the systems, preventive maintenance, maintenance of records / documentations etc., as per the detailed specifications, terms & conditions covered under this contract.
First year of Defect Liability Period (DLP)
Second year of Defect Liability Period (DLP)
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Internal & External Installations, i/c LPS, Beacon, Water coolers, Hand driers & Signages, etc. as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Power Supply (Sub Station Equipment) & UPS System as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Passenger Elevator as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of HVAC System VRF System & Complete Air-Conditioning System as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Fire Protection system as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Addressable Fire Alarm & aspiration system as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant (STP) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Water Supply System as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Grid Connected Solar System as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours).
First year after DLP
Second year after DLP
KMV Projects Limited
KCL-SCC (JV)
Dineshchandra R Agrawal Infracon Pvt. Ltd.
VASCON ENGINEERS LTD
KEC International Ltd
ISGEC Heavy Engineering Ltd
Gannon Dunkerley and Co., Ltd
Engineering Projects (India) Ltd.
Renaatus Projects Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .