Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | -37.10% | ₹4.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.4 L+₹10,460.85 (2.45%)Admitted-Fee/PreQual/Technical/Finance | -35.56% | ₹4.4 L+₹10,460.85 (2.45%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.5 L+₹27,171.04 (6.36%)Admitted-Fee/PreQual/Technical/Finance | -33.10% | ₹4.5 L+₹27,171.04 (6.36%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.8 L+₹47,888.97 (11.2%)Admitted-Fee/PreQual/Technical/Finance | -30.05% | ₹4.8 L+₹47,888.97 (11.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹5.0 L+₹68,606.89 (16.1%)Admitted-Fee/PreQual/Technical/Finance | -27.00% | ₹5.0 L+₹68,606.89 (16.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.8 L
EMD Value
₹13,580
Closing Date
18 Sept 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_324431_9
e-NIT No. 179 REW UDHAMPUR of 2026-27 Dated 12-09-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹13,580
21 Sept 2026
12 Sept 2026
19 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of CIB | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of Soils. | 35.68 | cum | 479.3 | ₹17,101.42 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 7.39 | cum | 4,826.5 | ₹35,667.84 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 30.65 | cum | 5,733.6 | ₹1,75,734.84 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 13.73 | cum | 937.9 | ₹12,877.37 |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 46 | cum | 2,793.8 | ₹1,28,514.8 |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. | 44.98 | Sqm | 562.15 | ₹25,285.51 |
| 8 | Centering and shuttering including stru tting, propping etc. and removal of form work for: Foundations | 62.55 | sqm | 286.35 | ₹17,911.19 |
| 9 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 40.89 | Sqm | 266.2 | ₹10,884.92 |
| 10 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. | 406 | KG | 127.3 | ₹51,683.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1094317.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .