Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.4 LAWARDED | AWARDED |
Tender Value
₹5.8 L
EMD Value
₹7,200
Closing Date
29 Nov 2025, 10:00 pmClosed
Public Works Department
Culvert Repair work in BC to AP Border road (PAK road) at Ch 12.05 Km in Srinivasapura taluk (Reserved For Category II(A))
PWD/2025-26/BR/WORK_INDENT29456
PWD/2025-26/BR/WORK_INDENT29456
Reserved
Bridges/Culverts
Electronic Documents, First(One Cover)
PWD Division Office Kolar
₹500
₹7,200
21 Nov 2025
21 Nov 2025
27 Nov 2025
Culvert Repair work in BC to AP Border road (PAK road) at Ch 12.05 Km in Srinivasapura taluk
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all leads and lifts cost and conveyance of al...
Granular Sub-Base - By Mix in Place Method - Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared sur...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Pavement Quality M30 grade Concrete (RMC) with OPC & GGPS laid using Paver - Construction of un-reinforced, dowel jointed M30 grade Pavement Quality Concrete Pavement over a prepared sub base...
Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lin- ing, including cost of materials, labour, curing as...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dus...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .