Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 L+₹12,949.06 (2.66%)Rejected-Finance BHATJANGLA NADIA | NADIA | WEST BENGAL | ₹5.0 L+₹12,949.06 (2.66%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.1 L+₹26,384.93 (5.42%)Rejected-Finance | ₹5.1 L+₹26,384.93 (5.42%) | L3 | Rejected-Finance L3 |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
13 Jan 2026, 1:00 pmClosed
Executive Engineer, MGPS AND WPS (W/S), KMC
2, Garden Reach Road, Kolkata - 700023
REPLACEMENT OF MOSTLY DAMAGED WOODEN PLANKS AT RIVERSIDE OF THE WOODEN JETTY AT WATGUNGE PUMPING STATION
2025_KMC_972836_1
KMC/WS/WPS/10/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Watgunge Pumping Station
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,800
7 Aug 2026
26 Dec 2025
15 Jan 2026
26 Dec 2025
13 Jan 2026
26 Dec 2025
BUILDING WORKS (G) WOOD AND PVC WORKS C. MISCELLANEOUS WOODWORK 8. Rough dressed timber planks fitted and fixed with nut bolts excluding framework complete : In ground floor (iii) 50mm thick planks (a) Sal Malayasian (For upper floors refer to item H(4) also)
BUILDING WORKS (G) WOOD AND PVC WORKS H..ADDITIONAL RATE 1. Labour for wood work in sawing from old timber to sizes as required for making(Payment to be made on quantity of finished work):(e) Post, post plates, rafters, battens, truss members, purlins etc. (excluding cost of bolts only but including cost of nails, screws etc. as directed.
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. II) For Structural Works in Roof Trusses etc. using joists, channels and angles of specified section weighing less than 22.5 kg/ m
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(4)Removing thick layers of paint from heavily cracked and blistered painted surface of timber by careful burning with blow lamp including smoothening exposed surface of timber with pumice stone or glass and preparing the same for fresh treatment.N.B.:(Payment against item (1, 2, 3, 4) of subhead B will be made only when done at specific direction of the Engineerin- charge. Cost of taking out shutter etc.for this item and rehanging the same or changing glass panes cracked or broken in the operation will be deemed to be covered by the rate of this item and no seperate payment therefore shall be made.)
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(3)Removing old paint from blistered painted surface of steel or other metal by chipping including scraping and cleaning and exposing the original surface.N.B.:(Payment against item (1, 2, 3, 4) of subhead B will be made only when done at specific direction of the Engineer- in-charge. Cost of taking out shutter etc.for this item and rehanging the same or changing glass panes cracked or broken in the operation will be deemed to be covered by the rate of this item and no seperate payment therefore shall be made.)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(9)Painting with ready mixed red lead paint of approved make and brand : (a) One coat.
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
Sub Total
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
tech.pdf
Tender Documents • 1.10 MB
BOQ_2367534.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .