Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.0 Cr+₹1.8 L (1.76%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.1 Cr+₹6.0 L (5.86%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹1.1 Cr+₹6.0 L (5.89%)Rejected-AOC DHIRRA SERAIYA JAUNPUR | JAUNPUR | UTTAR PRADESH | 212401 | L4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical GRAM AND POST LAKHUN TEHSIL DHAURHARA LAKHIMPUR KHERI | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | M S DHERENDRA KUMAR PANDEY L1 | J.P.ENTERPRISES L3 | MAN CONSTRUCTION L4 | M/S RAM NATH SHUKLA L2 |
|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge | 2,759 | M³ | 65.75 ₹1,81,404.25 | 65 ₹1,79,335 Lowest | 65.75 ₹1,81,404.25 | 65 ₹1,79,335 Lowest |
| 1.02 | Dismentaling of old brick work including stacking of material within a distance of 60M as per direction of Engineer in charge. | 163.69 | M³ | 200 ₹32,738 Lowest | 294 ₹48,124.86 | 294 ₹48,124.86 | 294 ₹48,124.86 |
| 1.03 | Dismentaling of RCC work including stacking of material within a distance of 60M as per direction of Engineer in charge. | 57.53 | M³ | 500 ₹28,765 Lowest | 624 ₹35,898.72 | 624 ₹35,898.72 | 624 ₹35,898.72 |
| 1.04 | Dismentaling of PCC work including stacking of material within a distance of 60M as per direction of Engineer in charge. | 59.64 | M³ | 400 ₹23,856 Lowest | 428 ₹25,525.92 | 428 ₹25,525.92 | 428 ₹25,525.92 |
| 1.05 | Running of 05 H.P generator set pump for dewatering including arangements of pump suction and delivery pipes and other accessories at site including cost of all material labour and T & P etc for complete work as directed by engineer in charge as per ID specification. | 120 | Hour | 100 ₹12,000 Lowest | 176 ₹21,120 | 176 ₹21,120 | 176 ₹21,120 |
| 1.06 | E/W in foundation in all kind of soil with all lead and lift and including back filling, watering, ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by Engineer-in-charge within a distance of 30M from the foundation trenches. | 737.87 | M³ | 100 ₹73,787 Lowest | 100 ₹73,787 Lowest | 100 ₹73,787 Lowest | 100 ₹73,787 Lowest |
| 1.07 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge | 1,229.7 | M² | 600 ₹7,37,820 Lowest | 878 ₹10,79,676.6 | 878.4 ₹10,80,168.48 | 600 ₹7,37,820 Lowest |
| 1.08 | Laying of C.C in (1:3:6) with stone ballast (20mm to 40mm) size and coarse sand FM not less than 2.5 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. | 89.23 | M³ | 6,849.69 ₹6,11,197.84 | 6,849 ₹6,11,136.27 Lowest | 6,849.69 ₹6,11,197.84 | 6,849 ₹6,11,136.27 Lowest |
| 1.09 | Bending, binding, cutting, placing in position steel reinforcement including materials with cost of binding wire and tack welding for proper completion of work. As per direction of Engineer in Charge. | 29.16 | Mt | 95,000 ₹27,70,200 Lowest | 1,00,778 ₹29,38,686.48 | 1,00,778.39 ₹29,38,697.85 | 1,00,000 ₹29,16,000 |
| 1.10 | Reinforced cement concrete (1:1.5:3) in all RCC work with Coarse sand having F.M. Not less than 2, Crushed Stone Aggregate of size (10 mm to 20 mm) Mechanically mixed and properly compacted by Vibrator including cost of all materials labours T&P etc. as per direction of Engineer in charge. | 454.43 | M³ | 9,984.22 ₹45,37,129.09 | 9,984 ₹45,37,029.12 Lowest | 9,984.22 ₹45,37,129.09 | 9,984 ₹45,37,029.12 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
19 May 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Construction work of box culvert
2026_UPIDC_1147663_5
02/S.E./2026-27
Open Tender
Civil Works
Item Rate
180 days
Jaunpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹2.2 L
Yes
Azamgarh
3 Nov 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
14 May 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge | 2,759 | M³ | - | - |
| 1.02 | Dismentaling of old brick work including stacking of material within a distance of 60M as per direction of Engineer in charge. | 163.69 | M³ | - | - |
| 1.03 | Dismentaling of RCC work including stacking of material within a distance of 60M as per direction of Engineer in charge. | 57.53 | M³ | - | - |
| 1.04 | Dismentaling of PCC work including stacking of material within a distance of 60M as per direction of Engineer in charge. | 59.64 | M³ | - | - |
| 1.05 | Running of 05 H.P generator set pump for dewatering including arangements of pump suction and delivery pipes and other accessories at site including cost of all material labour and T & P etc for complete work as directed by engineer in charge as per ID specification. | 120 | Hour | - | - |
| 1.06 | E/W in foundation in all kind of soil with all lead and lift and including back filling, watering, ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by Engineer-in-charge within a distance of 30M from the foundation trenches. | 737.87 | M³ | - | - |
| 1.07 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge | 1,229.7 | M² | - | - |
| 1.08 | Laying of C.C in (1:3:6) with stone ballast (20mm to 40mm) size and coarse sand FM not less than 2.5 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. | 89.23 | M³ | - | - |
| 1.09 | Bending, binding, cutting, placing in position steel reinforcement including materials with cost of binding wire and tack welding for proper completion of work. As per direction of Engineer in Charge. | 29.16 | Mt | - | - |
| 1.1 | Reinforced cement concrete (1:1.5:3) in all RCC work with Coarse sand having F.M. Not less than 2, Crushed Stone Aggregate of size (10 mm to 20 mm) Mechanically mixed and properly compacted by Vibrator including cost of all materials labours T&P etc. as per direction of Engineer in charge. | 454.43 | M³ | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.55 MB
BOQ_2147744.xls
BOQ • 0.24 MB
Biddocument5.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .