| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 140 NEAR DAKBANGLO DHARAM GOOL RAMBAN UDHAMPUR J K | RAMBAN | JAMMU AND KASHMIR | 182144 | Not Admitted-Fee/PreQual/Technical Others-insufficient cdr |
Tender Value
₹1.5 L
EMD Value
₹2,910
Closing Date
6 Sept 2022, 4:30 pmClosed
ER GIAN SINGH
OFFICE OF THE EXECUTIVE ENGINEER REW RAMBAN MAITRA
AS PER THE NIT ATTACHED
2022_RDPR_184922_42
NIT NO 28 OF REW RAMBAN (BDC) 2022-23
Open Limited
Civil Works
Item Rate
30 days
RAMBAN
AS PER THE NIT ATTACHED
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW RAMBAN
₹2,910
20 Sept 2022
23 Aug 2022
7 Sept 2022
23 Aug 2022
6 Sept 2022
23 Aug 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains,(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. A). All kinds of soils
Providing and laying dry Stone Pitching on horizontal surface.
Providing and laying in position cement concrete (1:3:6)mix in foundation &plinth using 20mm Nallah stone aggregate with 30%boulders excluding shuterring including all carriages with leads and lifts complete job
RANDOM RUBBLE MASONRY Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing including all carriages complete job
Extra for Random Rubble masonry above plinth level in superstructure upto floor five level.
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm N. size)
Reinforcement for RCC work including straightening,cutting bending, placing in position and binding all complete upto plinth level Thermo Mechanical Treated bars including all carriges
Centring and shuttering including strutting propping etc. and removal of form for :-Foundations, footings, bases of columns etc for mass concrete
Suspended floors, roofs, landings, balconies and access platforms.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Edges (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 6 ( 1 cement : 6 fine sand)
12mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand)
Structural Steel in Built up sections ISA 40X40X6 MM doors and ventilator frames
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete.40mm thick with 20 mm nominal size stone aggregate.
Add Provision for paint/colorwash, door/ventilator shutters, electrification and Sanitory items complete job.
Provision for sign board and photographs (Paid as per actual)
Abdul Majid
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .