| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.9 LAccepted-AOC | L-1 | Accepted-AOC Party in the race | |
| 2 | L-1₹12.8 LAccepted-AOC | L-1 | Accepted-AOC Party in the race | |
| 3 | Rejected-Technical | - | Rejected-Technical Experience not continuous for last four years |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
31 May 2022, 10:00 amClosed
General Manager
The Gurdaspur Co-op. Sugar Mills Ltd., Gurdaspur
Fabrication And Erection Jobs of Nakodar CSM
2022_Coop_85967_1
Fabrication And Erection Jobs of Nakodar CSM
Open Tender
Job Works
Item Rate
90 days
The Nakodar Co-op. Sugar Mills Ltd., Nakodar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹50,000
17 Jun 2022
21 May 2022
31 May 2022
21 May 2022
31 May 2022
21 May 2022
Amount
Nakodar CSM
Replacement of worn out M.S. vertical supporting channels & side plate of final molasses storage tank No. 2 with M.S Plate and channels.
Strengthening of pans shell with angle and channels in round shape with MS angle 75x75mm and Dia 4.34 mtr. ( Two rounds)
Strengthening of Evaporator shell with angle and channels in round shape with MS angle 75x75mm and Dia 2.80 mtr. ( Two rounds)
Dismantling, Fabrication, Erection of top cone below save all of evaporators.
Dismantling, Fabrication, Erection of Complete Save all (existing design) of 2nd Body evaporators including top plate, inner and outer shell.
Dismantling, Fabrication, Erection of Save all (existing design) Inner plate of 2nd Body evaporators
Dismantling, Fabrication, Erection of umbrella of save all Evaporator 4th body as per existing design including all supporting.
Dismantling, Fabrication and erection of Quad condensate tank including all connection. Size Dia 509mm x length 1800mm
Dismantling, Fabrication, Erection of Hot water receiving tank of water weighing scale. The Erection work for this job will also include all connections which are dismantled during dismantling.
Dismantling, fabrication & Erection of juice feed boxes of juice heater double bead valve. The Erection work for this job will also include all connections which are dismantled during dismantling.
Dismantling, fabrication & Erection of absorption tower of Syrup Sulphiter. The Erection work for this job will also include all connections which are dismantled during dismantling
Dismantling, Fabrication & Erection of worn out Stainer of juice Sulphiter Pump.
Dismantling, Fabrication & Erection of worn out portion of Bottom Cone of juice Sulphiter
Dismantling, fabrication and Erection of Melter of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc.
Dismantling, fabrication and Erection of Scrubber of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc .
Dismantling, Fabrication & Erection of Dorr coils (Nipple/Flange/ reducer rates as per general fabrication, Erection Rates )
Dismantling, Fabrication & Erection of Dorr compartment shell with MS plate channel angles. The Erection work for this job will also include all connections which are dismantled during dismantling.
Dismantling, Fabrication & Erection of Dorr compartment/Chamber Roof with MS plate channel angles supports. The Erection work for this job will also include all connections which are dismantled during dismantling.
Dismantling fabrication and Erection of Base plate of mud boot of Dorr to make it leak proof.
Replacement of Sealing Ring of Dorr Mud boot
Dismantling, fabrication and Erection of Mud tank below RVF including all connections.
Dismantling, fabrication and Erection of clear juice feed box along its telescopic valve of Dorr.
Dismantling, fabrication and Erection of worn out Heavy / Light Vacuum tank of RVF including all connections.
Dismantling, fabrication and Erection of base plate of Dorr compartment with their supporting angle/ channel etc
Dismantling, fabrication & Erection of filter Juice Sealing Bottles of receiving pit for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling.
Dismantling Fabrication and Erection of MS barometric condenser of RVF. This job will include all connections which are dismantled during dismantling.
Dismantling fabrication and Erection of Bagacillo pipeline from MS plate 3mm
Dismantling, Fabrication & Erection of Bagacillo Cyclone.
Dismantling, Fabrication & Erection of Bagacillo Chute.
Dismantling, Fabrication & Erection of Bottom trough of Mud Mixer for RVF
Dismantling, Fabrication & Erection of screw conveyor of Mud Mixer
Dismantling, fabrication and Erection of MS vapour pipe of different sizes. 1) Dia- 1050mm
1) Dia - 900mm ,
2) Dia - 720mm
3) Dia – 620mm
4) Dia – 520mm
Dia – 420mm
Dismantling, Fabrication & Erection Vapour/Exhaust pipe bend 900mm Dia
Dismantling, fabrication and Erection of distance piece of MS vapour pipe length up to 1.5 mtr. 1) Dia- 1050mm
1) Dia - 900mm ,
2) Dia - 720mm
3) Dia – 620mm
4) Dia – 520mm
Dia – 420mm
Dismantling of MS/CI condenser cone of Pans
Fabrication of MS condenser cone of Pans
Erection of MS/CI condenser cone of Pans
Dismantling, Fabrication, Erection of umbrellas of pan save all as per existing design including all supporting.
Replacement of worn out portion of bottom, side plate & supporting angle/channel of syrup and molasses tank at Pan station
Replacement of M.S Plate Gutter of Crystallizer station and other factory units.
Replacement of worn out portion of pan soucer
Dismantling, fabrication and Erection of downtake of Pan from 10/12mm plate
Replacement of Feed box of Pans including all connections
Dismantling, fabrication and Erection Distributor of pans
Dismantling, Fabrication & Erection of Worn out portion of molasses conditioner. This work includes dismantling and Erection of all connection pipes and their drive unit.
Dismantling, fabrication and Erection of worn out bottom portion of crystallizer
Fabrication and Erection of catcher for C-Vacuum Crystallizer.
Replacement of crystallizer arms along with supports from 75x75mm M.S angle. (a)Dismantling
(b) Fabrication
(c) Erection
Dismantling, fabrication & Erection of cooling coils of Crystallizer including all connections.
Dismantling and Erection of branch pipes of spray pond. This work include all connections of clusters,
Dismantling of CI/MS main pipeline spray pond
Dismantling fabrication & Erection of suction pipes of injection pumps with stainer.
Dismantling fabrication & Erection of suction pipes of Spray pumps with stainer.
Dismantling ,Fabrication Erection of worn out Bottom half portion of B magma mixture including all connections.
Dismantling, Fabrication and Erection of worn out Bottom half portion of A pug mill including all connections.
Dismantling, Fabrication and Erection of worn out portion of Sugar Hopper along with its alignment. Size 4’ wide x 2 mtr Length
Dismantling, Fabrication and Erection of Sugar Melter Pump stainer Including all connections
Fabrication and Erection of Bed for pump and motor of Magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc.
Modification of Bagacillo screen for easy operation with fitting of ball bearings, wheels & Guides in all respects.
Dismantling, fabrication and Erection of bottom discharge chute of continuous centrifugal machine
Fabrication and Erection of new syrup tank at pan station including all connections.
Dismantling, Fabrication and Erection of ammonia coils of pans from MS pipe Dia 3” including all connection
Dismantling and Erection of tube plate (Top and Bottom) 2nd evaporator Body including fabrication & erection of downtake including all connections
Dismantling and Erection of Calendria with Tube plate (Top and Bottom) of Pan No. 4 including all connections alongwith fabrication & erection of downtake and dismantling & erection of distributor.
Fabrication and erection of Beds for Pump and Motor etc.
Dismantling and Erection of Crystallizer shaft including arms and all connections, Fittings.
Dismantling, Fabrication and Erection of internal plates of catcher for Semi kestner
Dismantling and Erection of fabricated globe valve 30 “ in exhaust line of vapour cell.
Dismantling, fabrication and erection of quad body outer shell Including all connections.
Dismantling, Fabrication and Erection Cane cutter hoods from 8-10mm thick plate with MS Angles etc.
Dismantling and Erection of Expansion joint of power turbine exhaust line.
Replacement of side plates of cane carrier chain/ RBC and trough of RBC /Bagasse elevator.
Replacement of channel and I-Beam of RBC/ Cane Carrier/ Bagasse Elevator/ Cross RBC Runner
Dismantling, fabrication erection of juice tray of mill No. 2 from MS plate
Fabrication of screw conveyor of Mill House
Dismantling, fabrication erection of ash hopper of boiler (pyjamas) cone with chute bottom portion( cone tapper portion size 15” approximate)
Dismantling, Fabrication of trough of screw conveyor, assembly of screw conveyor with trough & its erection.
Repair of rotary bagasse feeders of boilers A) Body
b) Rotor
Replacement of side plate 3mm/old ms plate of boiler (with MS plate & supporting angle/ flat)
Dismantling, fabrication & erection of worn out ducting of boiler & APCD including angle, channel, Flats & flanges
Dismantling, Fabrication & Erection damper of boiler ducting
Dismantling fabrication & erection of Expansion joint of boiler ducting (3.360 mtr x 1.260 mtr)
Replacement of MS gutter of APCD plant from wet scrubber to Ash Pits
Dismantling fabrication & erection of Damper of rotary Bagasse Feeder
Dismantling, fabrication & erection of worn out portion of ID and APCD fan casing
Replacement of sieve plates of APCD scrubber. This job also includes 10/12mm holes (324 holes per square ft.) drilling in plates
Baffle plates (MS flat 65 x 6mm) of demister in Wet Scrubber
Repair/ replacement of wornout portion of wet scrubber of Boiler No. 1 & 2
Dismantling fabrication and erection of receiving tank/ Sum Tank/ Sealing tank of Wet scrubber.
Replacement of G.I Sheet Gutter of factory building
Replacement of worn-out of M.S. Runner of inter carrier, elevator, RBC , cross carrier & cane carrier chains
Juice heater/V.L.J.H. tubes a) Dismantling
b) Fitting
Semi kestner tubes a) Dismantling
b) Fitting
Quad bodies SS tubes 1st to 4th a) Dismantling
b) Fitting
Pans tubes SS 1st to 5th a) Dismantling
b) Fitting
Welding joints of water , juice , vapor and exhaust pipe line of Exhaust Pipe Lines of all Sizes.
MS Pipe line 1/2" to 12” dia a) Dismantling
b) Erection
SS Pipe line 1/2" to 12” dia a) Dismantling
b) Fabrication
c) Erection
CI Pipe line 1/2" to 12” dia a) Dismantling
b) Erection
MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad) a) Dismantling
b) Fabrication
c) Erection
A) MS Bend upto 12” dia a) Dismantling
b) Fabrication
c) Erection
B) MS Bend above 12” dia from MS plate (other than V.P. pans & quad) a) Dismantling
b) Fabrication
c) Erection
CI Bends sizes 1” to 6” a)Dismantling
b) Erection
Dismantling, Fabrication& Erection of M.S (all sizes) a) Tee,
b) Nipples,
c) Crosses
d) Reducers
e) Elbow
Dismantling, Fabrication& Erection of S.S (all sizes) a) Tee,
b) Nipples,
c) Crosses
d) Reducers
e) Flange
f) Elbow
g) Bend
Replacement of wornout MS Cone (all sizes)
MS Flanges (all sizes) a) Dismantling
b) Fabrication
c) Erection
Dismantling , fabrication and erection of ManHoles (all sizes)
a) Dismantling of platform plate
b) Fabrication & Erection of platform plate
M.S. Tank having round & conical & rectangular bottoms a) Dismantling
b) Fabrication
c) Erection
M.S Structure Trusses, Perlins, Columns & Beams (Factory Building) a) Dismantling
b) Fabrication
c) Erection
Platform railing from old pipe & angle a) Dismantling
b) Erection
Patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter
Dismantling of sluice valve/ angle valve/ N.R.V.
Erection of sluice valve/ angle valve/ N.R.V. ,Butterfly Valve
Replacement of Rail line of cane unloader with 50mm square bar
Mohd Wahid Industries
ILMA ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .