| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance 78 2 23 B ROY RD WES T CAL 61 700061 | KOLKATA | KOLKATA | WEST BENGAL | 700061 | +0.00% | ₹3.6 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 LAdmitted-Finance 126 2 BECHARAM CHATT ERJEE ROAD KOLKATA 700034 | KOLKATA | KOLKATA | WEST BENGAL | 700034 | +3.19% | ₹3.7 L | L2 | Admitted-Finance |
| 3 | L3₹3.7 LAdmitted-Finance | +5.00% | ₹3.7 L | L3 | Admitted-Finance |
Tender Value
₹3.6 L
EMD Value
₹7,500
Closing Date
20 Feb 2026, 12:00 pmClosed
S.O(ROADS)
THE SPECIAL OFICER (Roads), KOLKATA MUNICIPAL CORPORATION, CHAPLIN BHAVAN, 2ND FLOOR, 5/2, CHOWRINGHEE PLACE, KOLKATA-700013
DEVELOPMENT OF ROAD SURFACE BY LOWERING AND ALLIED WORKS FROM 46M TO 46/11 B.C RD WITH BLACKTOP SURFACE IN WARD NO-130, BR-XIV UNDER ROADS MECHANICAL DEPARTMENT.
2026_KMC_998825_1
KMC/ASPH/GG/MH-10/2025-26
Open Tender
CIVIL WORKS
15 days
BECHARAM CHATTERJEE ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,500
28 Feb 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
20 Feb 2026
11 Feb 2026
Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (a) By manual means : (iii) Above 100 mm thick. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.02 Page No.331)
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303])
Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303])
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10)
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e))
Raising manhole cover and frame with CBW (1:4), 375 mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR
Lowering manhole cover and frame with CBW (1:4), 375 mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR,
Raising gully pit cover and frame with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster with neat cement after dismantiling the existing setting and taking out and refixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR,
Supplying, fitting and fixing in positing reinforced cement polymer concrete manhole /gully pit cover with matching frame as per I.S. 12592 (m.D.)x) 5 mT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover : 470 mm. X 420 mm. X 80 mm. Frame : 590 mm. X 550 mm. X 170 mm. Opening : 380 mm. X 305 mm. Weight : 100 Kg. (approx.)
(b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No. 200)
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : (ii) Two coats (white in shade) ( Ref :PWD (Bldg.)-2017, It. No. 2, Page No. 200)
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : (iv) Two coats (with any shade except white)
LABOUR FOR PREPARATION OF SURFACE BY SCRAPING, CLEANING & BRUSHING SPREADING HOT MIX INCLUDING LABOUR FOR LAYING TACK COAT (EMULSION BITUMEN WILL BE SUPPLIED BY DEPTT.) AND ALSO COMPACTION OF HOT MIX.
Supplying, fitting and fixing in positing reinforced cement polymer concrete manhole /gully pit cover with matching frame as per I.S. 12592 (m.D.) ii) 25 mT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover : 680 mm. X 90 mm. Frame : 800 mm. X 165 mm. Opening : 500 mm. Weight : 196 Kg. (approx.)
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm)
Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
SUB TOTAL
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_2445902.xls
BOQ • 0.31 MB
form10.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid