| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.4 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹7.6 L+₹9,124 (1.22%)Rejected-AOC AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | 2 | Rejected-AOC L2 | |
| 3 | 3₹7.6 L+₹17,540 (2.35%)Rejected-AOC 78 PARASI NEAR PRIMARY SCHOOL PARASI RENUSAGAR RENUSAGAR RENUSAGAR SONBHADRA UTTAR PRADESH 231218 | SONBHADRA | UTTAR PRADESH | 231218 | 3 | Rejected-AOC L3 |
Tender Value
₹7.5 L
EMD Value
₹10,000
Closing Date
6 May 2023, 1:00 pmClosed
Superintending Engineer
OFFICE OF THE SUPERINTENDING ENGINEER, OandMC-II, DTPS, ANPARA PIN-231225
Overhauling of high pressure valves, safety valves and DRUM of Boiler of unit 6, DTPS, Anpara
2023_RVUNL_790980_1
T09/BMD-1/OH /U6/DTPP /2023-24
Open Tender
Power/Energy Projects/Products
Fixed-rate
35 days
Anpara Thermal Power Station
TENDER COST, EARNEST MONEY and VALIDITY AGREEMENT
2 documents required · 2 mandatory
₹590
Dy. CAO, CFAandBO, DTPS
₹10,000
4 Nov 2023
29 Mar 2023
8 May 2023
29 Mar 2023
6 May 2023
29 Mar 2023
Amount
Servicing / Revisioning of Boiler Circulation Pump Elbow down stop check valve, Nb – 350/300 mm, Design Pr. – 213.8 Kg/sq.cm
Servicing /Revisioning of manually operated Main steam stop Valve (MSV-1&2). Nb - 500 mm, Design Pr. - 191.5 Kg/ sq.cm.
Servicing/ Revisioning of Economizer Inlet Isolating gate Valve. Nb - 450 mm, Design Pr. - 320 Kg/ sq.cm.
Servicing/ Revisioning of Economizer non return flap Valve. Nb - 450 mm, Design Pr. - 320 Kg/ sq. cm.
Servicing/ Revisioning of SH Spray outlet Isolating valves. Nb -125 mm, Np - 356 Kg/ sq.cm.
Servicing/ Revisioning of pneumatically operated block Valve & Control Valve of Super heater attemparation line. Nb – 100 to 150 mm, Design Pr. –356 Kg/ sq.cm.
Servicing/ Revisioning of pneumatically operated block Valve & Control Valve of Reheater attemparation line. Nb – 65 to 100 mm, Design Pr. – 176 Kg/ sq.cm.
Servicing/ Revisioning of RH Spray outlet Isolating valves. Nb -65 mm, Np - 176 Kg/ sq.cm.
Servicing/ Revisioning of Soot blowing PRV and other similar valve . Nb 50 to 100 mm, Np – 198.9 Kg/ sq.cm
Servicing/ Revisioning of High Pressure Hand operated Valves and NRVs . Nb – 10 to 200 mm.
Servicing/ Revisioning of Motor operated High Pressure valves. Nb -20 to 200 mm.
Servicing/ Revisioning of blow down valve Motor operated Valves .Nb – 40 mm , Design Pr.-210.8 kg/cm2.
Blanking of Hot reheat and cold reheat isolating device ( Dia. 660 mm) by blanking device and normalising the same.
Servicing/ Revisioning of Boiler Drum Safety valves. Nb – 3”/6”, Design Pr. - 209 to 216 Kg/ sq. cm.
Servicing/ Revisioning of MS line Safety valves. Nb – 3”/6”, Np - 185.5 Kg/ sq. cm.
Servicing/ Revisioning of MS line Electromagnetic relief valves. Nb – 2.5”/4”, Np – 185 to 187 Kg/ sq. cm. Temp. - 540 deg. C
Servicing/ Revisioning of Hot Re-heat & Cold Re-heat Safety valves. (a) CRH - Nb -6”/10”, Design Pr – 52.4 to 54 Kg/ sq. cm. (b) HRH – Nb -6”/8”, Design Pr – 49 to 50.5 Kg/ sq. cm.
Servicing/ Revisioning of Hot Re-heat Electromagnetic relief valves. Nb – 6”/8”, Np – 48 to 48.5 Kg/ sq. cm. Temp. - 540 deg. C
Servicing/ Revisioning of Soot blower PRV outlet Safety valves. Nb – 2.5”/4”, Np - 40 Kg/sq. cm.
Servicing/ Revisioning of Heavy & Light Oil valves (pneumatic operated ) as HOTV, LOTV,HOCV,LOCV,HORTV,LORTV Nb –40-100 mm, Working Pr. -15/ 22 Kg/sq. cm.
Replacement of gaskets of flanges and bonnets of valves.
Replacement of gland packing of High pressure valves.
Attending leakage of pipelines and headers etc. of Main Boiler
Cleaning of Oil Strainer of Fuel Oil Station on firing floor.
Replacement of High pressure valve (motor operated/Hand operated) of critical piping of Boiler of size 15 - 25 mm.
Replacement of High pressure valve (motor operated/Hand operated) of critical piping of Boiler of size 40 - 50 mm.
Replacement of High pressure valve (motor operated) hand operated) of critical piping such as Main Steam, Final Super Heater, Primary Super Heater, CBD etc. of size 65 - 150
INTERNAL INSPECTION OF BOILER DRUM & RECTIFICATION OF DEFECT IF ANY
REPAIRING/REPLACEMENT OF BAFFLE PLATES OF CBD TANK IF FOUND DAMAGED, BY FABRICATING BAFFLE PLATES OUT OF MS PLATES
REPAIRING/REPLACEMENT OF BAFFLE PLATES OF IBD TANK IF FOUND DAMAGED, BY FABRICATING BAFFLE PLATES OUT OF MS PLATES
REPAIRING OF OBSERVATION DOOR OF BOILER
REPAIRING OF BOILER FIRST PASS 52 MTR & 9.5 METER MANHOLE DOOR/ PENTHOUSE DOOR
SHAKSHI ENGINEERING CO.
M/S BIHAR CONSTRUCTION CO.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .