Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.2 L+₹67,903.62 (26.9%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.3 L+₹77,192.32 (30.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.3 L+₹77,512.62 (30.7%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹3.2 L
EMD Value
₹6,400
Closing Date
10 Sept 2026, 6:00 pmClosed
FAYAZ AHMED SHEIKH
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_322806_14
NIT NO42 OF REW RAMBAN 2026 27 BLOCK RAMBAN AND BATOTE UNDER HEAD CDF AND TRIBAL
Open Tender
Civil Works
Percentage
30 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹6,400
24 Sept 2026
31 Aug 2026
11 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work by manual means over areas (exceeding 30cm and upto1.5m depth,1.5m in width as well as 10sq.m on plan) in all kinds of soils. | 1 | cum | 592.9 | ₹592.31 |
| 2 | Providing and laying stone soiling on horizontal bed. | 1 | cum | 1,203 | ₹1,201.8 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 1 | cum | 5,733.5 | ₹5,727.77 |
| 4 | 30% Boulders in Item no 1. | - | cum | 751.55 | - |
| 5 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer allcomplete. Welded. | - | kgs | 127.3 | - |
| 6 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in charge. 16.25.1 Made of G.I. wire of dia 4 mm. | 1 | sqm | 809.9 | ₹809.09 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundations ,footings bases of column. | - | sqm | 286.35 | - |
| 8 | Carriage of Cement from source to site by mechanical transport or animal transport or by head load. | 1 | cum | 449 | ₹448.55 |
| 9 | Carriage of Steelt from source to site by mechanical transport or animal transport or by head load. | - | Ton | 449 | - |
| 10 | Carriage of Sand from source to site by mechanical transport or animal transport or by head load. | - | cum | 1,955.02 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
BOQ_1084285.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .