Loading…
Loading…
Tender Value
₹64,700
EMD Value
₹3,235
Closing Date
28 Sept 2026, 6:55 pmDue tomorrow
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Construction of Protection Bund Both Sides foot Bridge at Brail
2026_RDPR_325175_11
NIT_75_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
WATERHAIL
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer REW Budgam
₹3,235
19 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including backfilling of soil & disposal of excavated earth to be levelled and neatly dresses within 10 m lead or as directed by eingeer in charge | 2.12 | Cum | 479.3 | ₹1,016.12 |
| 2 | P/L of Stone soling / Nallah boulders, hand Packed | 1.81 | Cum | 1,266.21 | ₹2,291.84 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 5.1 | Cum | 5,733.6 | ₹29,241.36 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 27.88 | Sqm | 286.35 | ₹7,983.44 |
| 5 | P/A 12mm thick cement plaster 1:6 (1cement:6fine sand) | 13.94 | Sqm | 266.2 | ₹3,710.83 |
| 6 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods,
watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: | 24.77 | Cum | 467.3 | ₹11,575.02 |
| 7 | Carriage of earth av lead 2 kms | 24.77 | Cum | 184.3 | ₹4,565.11 |
| 8 | Carraige of coarse aggregate, 20 mm from Source to Site. | 5.54 | Cum | 344.49 | ₹1,908.47 |
| 9 | Carraige of Fine aggregate from Source to Site. | 2.29 | Cum | 344.49 | ₹788.88 |
| 10 | Add provisions for signboard, Photographes and other unforseen items. | 1 | job | 1,600 | ₹1,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_1098133.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .