| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.4 LAdmitted-Finance | ₹7.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ASADULLA B M L1 | Renvolt Energy Solutions Private Limited L2 |
|---|---|---|---|---|---|
| 1.00Providing New Service connections by using Over Head line: Fixing Suitable cutout fuse, Fixing Energy Meter, Providing service line, providing line connections, etc. Over head Service lines should be clipped to the stay wire using proper cable tie. Service wire with stay wire tied at proper height and tight. (The distance between post and consumer meter point is up to 30 Mtrs length/ Above 30 Mtrs length). | |||||
| 1.10 | Single Phase Connection (Up to 30 Mtrs distance) | 60 | Nos. | 50 ₹3,000 | 250 ₹15,000 |
| 1.20 | Three Phase Connection (Up to 30 Mtrs distance) | 30 | Nos. | 50 ₹1,500 | 450 ₹13,500 |
| 1.30 | Single Phase Connection (Above 30 Mtrs distance) | 40 | Nos. | 50 ₹2,000 | 250 ₹10,000 |
| 1.40 | Three Phase Connection (Above 30 Mtrs distance) | 25 | Nos. | 50 ₹1,250 | 450 ₹11,250 |
| 2.00Providing New Service connections (UG Cables): Fixing and clipping the UG cable to the wall with proper cable clip, Fixing Suitable cutout fuse, Fixing Energy Meter, Providing line connections, etc (Excluding cable laying works) | |||||
| 2.10 | Single Phase Connection | 40 | Nos. | 100 ₹4,000 | 400 ₹16,000 |
| 2.20 | Three Phase Connection | 15 | Nos. | 100 ₹1,500 | 400 ₹6,000 |
| 3.00UG Cable Joining LT, lines: Cutting cables, Removing insulations, semi conductors, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour. | |||||
| 3.10 | HT Cable 95 Sq mm (Straight) | 12 | Nos. | 900 ₹10,800 | 800 ₹9,600 |
Tender Value
₹8.2 L
EMD Value
₹16,458
Closing Date
13 Jan 2026, 3:00 pmClosed
UP Janathbi
Assistant Engineer Electricity sub division Kadmat
Various type of Electrical works in Distribution Lines (LT) and Consumer related Under Electricity Department
2025_UTL_3172_1
2/1/2025-ELE(KDT)/977 Dated.16.12.2025
Open Tender
Electrical Works
150 days
Assistant Engineer Electricity sub division Kadmat
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹16,458
Yes
19 Feb 2026
22 Dec 2025
14 Jan 2026
22 Dec 2025
13 Jan 2026
22 Dec 2025
Providing New Service connections by using Over Head line: Fixing Suitable cutout fuse, Fixing Energy Meter, Providing service line, providing line connections, etc. Over head Service lines should be clipped to the stay wire using proper cable tie. Service wire with stay wire tied at proper height and tight. (The distance between post and consumer meter point is up to 30 Mtrs length/ Above 30 Mtrs length).
Single Phase Connection (Up to 30 Mtrs distance)
Three Phase Connection (Up to 30 Mtrs distance)
Single Phase Connection (Above 30 Mtrs distance)
Three Phase Connection (Above 30 Mtrs distance)
Providing New Service connections (UG Cables): Fixing and clipping the UG cable to the wall with proper cable clip, Fixing Suitable cutout fuse, Fixing Energy Meter, Providing line connections, etc (Excluding cable laying works)
Single Phase Connection
Three Phase Connection
UG Cable Joining LT, lines: Cutting cables, Removing insulations, semi conductors, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour.
HT Cable 95 Sq mm (Straight)
HT Cable 95 Sq mm (End Termination)
UG Cable Joining LT 440V lines: Cutting cables, Removing insulations, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour.
LT Cables 3 Phase (95, 120 & 160 Sq mm)
LT Cables 3 Phase ( 70, 50 Sqmm)
LT Cable 3 Phase( 10, 16,25 & 35 Sqmm)
LT Single phase Cables
LT End Termination works through break out
Maintenances of Electrical Service connections-
Refurbishment of service connections on the Post/Boxes/Consumer end, etc
Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post within 30 Mtrs length)
Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post above 30 Mtrs length)
Replacing cut out fuse units with new one
Replacing defective Energy Meter with new one
Sealing Energy Meter with proper Polycarbon / suitable seal
Replacing HRC fuse unit (including base) necessary cutting,drilling,taiting with Bolt and nuts,socket and Cable tying (100 A to 400A)
Replacing Forcelain fuse unit (including base) necessary cutting,drilling,taiting with Bolt and nuts,socket and Cable tying (100 A to 400A)
Installation/Replacement of Street light sets including transportation, connection, etc
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 37.09 MB
BOQ_3601.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid