Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.5 LAccepted-Finance | ₹34.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹35.4 L+₹89,205 (2.59%)Rejected-Finance GRAM SANTA HARISINGH KA PURA POST UMMEDGAH BANSI MORENA MP 476001 | MORENA | MORENA | MADHYA PRADESH | 476001 | ₹35.4 L+₹89,205 (2.59%) | L2 | Rejected-Finance L2 |
| 3 | L3₹35.7 L+₹1.2 L (3.51%)Rejected-Finance 60 FOOT ROAD GANGA VIHAR COLONY GWALIOR | GWALIOR | GWALIOR | MADHYA PRADESH | ₹35.7 L+₹1.2 L (3.51%) | L3 | Rejected-Finance L3 |
| 4 | L4₹36.0 L+₹1.5 L (4.41%)Rejected-Finance WARD NO 04 256 K NEAR YAGYASHALA MANDIR MAIN ROAD TEMPLE PATHARIA DISTT DAMOH MP 470666 | PATHARIA | DAMOH | MADHYA PRADESH | 470666 | ₹36.0 L+₹1.5 L (4.41%) | L4 | Rejected-Finance L4 |
| 5 | L5₹36.1 L+₹1.6 L (4.56%)Rejected-Finance | ₹36.1 L+₹1.6 L (4.56%) | L5 | Rejected-Finance L5 |
Tender Value
₹47.0 L
EMD Value
₹50,000
Closing Date
19 Aug 2026, 6:00 pmClosed
Executive Engineer PHE Division Khurai
Executive Engineer PHE Division Khurai
Revised and Balance work of Survey, Investigation and Necessary Construction works required for Execution of Under Jal Jeevan Mission of Isharwara and Parashari Kala of Block Rahatgarh Distt. Sagar
2026_PHED_528633_1
NIT No. 10 /EE/PHED/2026-27/Khurai Dt 11.08.2026
Open Tender
Civil Works - Water Works
Percentage
120 days
RAHATGARH
AS PER NIT
4 documents required · 4 mandatory
₹10,000
₹50,000
3 Sept 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Revised and Balance work of Survey, Investigation and Necessary Construction works required for Execution of Under Jal Jeevan Mission of Isharwara and Parashari Kala of Block Rahatgarh Distt. Sagar based on Tubewells including installation of Electric submersible motor pump sets , construciton of sumpwells cum pump houses with openwell submersible motor pump sets, laying and jointing of Rising and Distribution pipe line system , House hold tap connections (As per BOQ) including cost of all material and labour with 90 Days Successful Trial Run of the scheme
AS PER BOQ | - | Job | 0.39 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
528633.pdf
Tender Documents • 2.33 MB
BOQ_636303.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .