Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C REVATHI L1 | R V CONSTRUCTIONS AND INFRA DEVELOPERS L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe | 150 | Rm | 304 ₹45,600 | 304 ₹45,600 |
| 2.00 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. | 150 | Rm | 190 ₹28,500 | 194 ₹29,100 |
| 3.00 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm | 150 | Rm | 18 ₹2,700 | 18 ₹2,700 |
| 4.00 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification | 150 | Rm | 30 ₹4,500 | 30 ₹4,500 |
| 5.00 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. | 150 | Rm | 22 ₹3,300 | 26 ₹3,900 |
| 6.00 | Plain Cement Concrete 1:5:10 (One Part of Cement, Five Part of Crushed Stone sand (M- Sand) and Ten part of Coarse Aggregates) Using 40mm Size ISS HBG Metal including Cost and Conveyance of all materials to site and including for the mixing, laying and all incidential Charges such as water Providing etc.. complete as per standard Specification | 14 | Cu.m | 5,211 ₹72,954 | 5,211 ₹72,954 |
| 7.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend | 3 | Nos | 1,200 ₹3,600 | 1,200 ₹3,600 |
| 7.01 | 90 mm HDPE Elbow | 3 | Nos | 343 ₹1,029 | 343 ₹1,029 |
| 7.02 | 90 mm HDPE Flange set | 3 | Nos | 1,100 ₹3,300 | 1,100 ₹3,300 |
| 7.03 | 110 mm HDPE Tee | 3 | Nos | 816 ₹2,448 | 816 ₹2,448 |
Tender Value
₹2.1 L
EMD Value
₹2,100
Closing Date
21 Apr 2025, 3:00 pmClosed
The Commissioner
Hosur City Municipal Corporation Bagalur Road hosur
Laying pipe line work at Ward No.30, Therpettai in Hosur City Municipal Corporation
2025_MAWS_535742_15
00027/2025/E2/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works - Water Works
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,100
29 Apr 2026
4 Apr 2025
21 Apr 2025
4 Apr 2025
21 Apr 2025
4 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_637927.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.55 MB
BOQ_637927.xls
BOQ • 0.40 MB
BIDDOCUMENT.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid