Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.1 LAccepted-Finance NA | L1 | Accepted-Finance Accepted | |
| 2 | L2₹29.3 L+₹1.2 L (4.16%)Accepted-Finance BABU RAM THAKUR NIWAS BELOW UTTAM GAS AJANCY DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Accepted-Finance Rejected | |
| 3 | L3₹29.5 L+₹1.4 L (4.94%)Accepted-Finance HOUSE NO 214 WARD NO 2 TEHSIL SUJANPUR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | L3 | Accepted-Finance Rejected |
| Sl No | Description | Qty | Unit | RAJNEESH THAKUR L3 | Sushil Chauhan L1 | Babu Ram L2 |
|---|---|---|---|---|---|---|
| 1.00 | Deployed 4Nos Pump Operotars to Operation of various lift water supply in full satisfactions of the departmental and as per the direction of Engineer in Charge. (4x365 = 1460 Days). | 1,460 | days | 1,000 ₹14,60,000 | 950 ₹13,87,000 Lowest | 980 ₹14,30,800 |
| 2.00 | Deployed of 4Nos of water guards to remove the blockeg in various water supply pipe line, conectivity of broken pipe line cleaning of various storage tank/intake chamber addition of bleaching powder in the storage tank in full satisfaction of the departmental and as per the direction of Engineer in Charge. (4x365 = 1460 Days). | 1,460 | days | 1,020 ₹14,89,200 | 975 ₹14,23,500 Lowest | 1,025 ₹14,96,500 |
Tender Value
₹19.0 L
EMD Value
₹37,931
Closing Date
16 Feb 2026, 11:00 amClosed
Executive Engineer
JSV Division Rohru
SH R M Deployed 4Nos Pump Operotator and 4Nos Water Guard Through outsourcing For One Year.
2026_HPIPH_128002_1
No.JSV-RD-AB-Tnd/2025- 7399-7440 dt 09.02.2026
Open Tender
Civil Works
Item Rate
365 days
Tikkar
Tender Document
8 documents required · 8 mandatory
₹500
EE Rohru
₹37,931
13 Mar 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Deployed 4Nos Pump Operotars to Operation of various lift water supply in full satisfactions of the departmental and as per the direction of Engineer in Charge. (4x365 = 1460 Days).
Deployed of 4Nos of water guards to remove the blockeg in various water supply pipe line, conectivity of broken pipe line cleaning of various storage tank/intake chamber addition of bleaching powder in the storage tank in full satisfaction of the departmental and as per the direction of Engineer in Charge. (4x365 = 1460 Days).
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_189063.xls
BOQ • 0.29 MB
F7and8.pdf
Tender Documents • 2.82 MB
termandcondition.pdf
Tender Documents • 0.18 MB
F6.pdf
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .