Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 504 5TH FLOOR MARU TOWER KANKE ROAD LOCALITY KATHARGONDA RANCHI JHARKHAND 834008 INDIA | RANCHI | JHARKHAND | 834008 | Admitted-Fee/PreQual/Technical |
Tender Value
₹6.6 L
EMD Value
₹13,284
Closing Date
24 Jun 2026, 5:00 pmClosed
Sr. Manager (CMM WORKS GROUP)
Vikram Sarabhai Bhavan Mumbai 400094
Demarcation and Fixing of boundary by erecting concrete posts for CMPAPP plant site using DGPS and Total Station at village Chutka, District Mandla.
2026_NPCIL_278771_1
NPCIL/HQ/CMM-WG/91/2026/PT/277
Open Tender
Civil Works - Others
Item Rate
180 days
Chutka Madhya Pradesh Atomic Power Project Site
As per NIT
7 documents required · 7 mandatory
₹0
₹13,284
Chutka Madhya Pradesh Atomic Power Project
20 Jun 2026
29 May 2026
25 Jun 2026
29 May 2026
24 Jun 2026
12 Jun 2026
29 May 2026 - 5 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Conducting revenue survey of CMPAPP Plant area of approximately 641 Hectares with reference to revenue/forest records, demarcation and fixing of external boundary points on ground at 50 meter interval or less if required using DGPS and Total Station and also carry out the erection of concrete posts at all demarcated points including establishing and construction of Permanent Benchmarks etc. as directed by Engineer in charge
Note:
1) The quoted rate shall be Inclusive of supply of 3 Sets of A0 size drawings in Dwg/ UTM format representing the lat/long Coordinates of each and every points and bends if comes within 50 metres.
2) Coordination with Revenue Department/forest department for collecting the relevant documents, records in connection with Boundary demarcation shall be in scope of Contractor. Vetting of the identified boundaries with Revenue department/forest department is also in the scope of Contractor.
3) The payment of item shall be paid in stages 30% after carrying out Revenue Boundary Survey, Identification & Recording of Encroachment and Demarcation of the boundary i.e pegging on the ground, 30% after Fixing of Boundary Posts in concrete/ Soil all along the boundary, 5% on the Submission of Geo – referenced AUTOCAD Drawings Plotted on Revenue map, 35% after the submission of the 3 Sets of Hard Copies & Soft Copies of drawing superimposed on Google Earth and survey report prepared by carrying out DGPS survey of erected posts.
4) The concrete posts erected shall be paid under relevant item. | 15 | kms | 22,700 | ₹3,40,500 |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 300 | SqM | 8 | ₹2,400 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means)
All kinds of soil. | 13 | Cum | 301 | ₹3,913 |
| 4 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work upto plinth level : M-15 – Grade concrete. | 13 | Cum | 5,817 | ₹75,621 |
| 5 | Supplying at site: R.C.C. Standards post/ struts/rails/ poles of mix 1:1.5:3 (1 cement : 1.5 sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge including fixing (cost of earth works in excavation, concrete works in foundation to be paid separately). | 3 | Cum | 12,100 | ₹36,300 |
| 6 | Structural steel work using M.S. flats, angles, channels I-section, H-section etc. riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 480 | Kg | 125 | ₹60,000 |
| 7Providing services to accomplishing the tasks as assigned and directed by Engineer-in-charge by supplying of various categories of labours on task basis. Note : A task would mean 8 hours of duty including half an hour of lunch time. | |||||
| 7.01 | Un-Skilled Labour | 100 | Task | 1,025 | ₹1,02,500 |
| 7.02 | Skilled Labour | 30 | Task | 1,432 | ₹42,960 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.51 MB
GCC.pdf
Tender Documents • 7.73 MB
Tender277.pdf
Tender Documents • 2.50 MB
TechnocommercialBidFormats.xls
Other Document • 0.20 MB
BOQ_325449.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .