Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 CrAccepted-AOC | ₹9.3 Cr | 1 | Accepted-AOC Lowest bidder |
| 2 | 2₹9.6 CrRejected-Finance NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | ₹9.6 Cr | 2 | Rejected-Finance Quoted amount is High |
| 3 | Not Admitted-Fee/PreQual/Technical 25A KALIYAPPANGOUNDER STREET MATHIKONPALAYAM DHARMAPURI DISTRICT 636 701 | DHARMAPURI | TAMIL NADU | 636701 | - | - | Not Admitted-Fee/PreQual/Technical Others- Work Site Inspection Certificate and Working Condition of the Plants and Machineries Certificate was not furnished. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Pre Qualification not satisfied |
Tender Value
₹9.3 Cr
EMD Value
₹4.8 L
Closing Date
2 Mar 2026, 11:00 amClosed
SE (H) C and M Chennai Circle
O/o the SE (H) C and M Chennai Chennai Teynampet Chennai-06
Subwork Widening from Two lane to Four lane and Strengthening in Kundrathur Urban Limit at km 11.730 _ 13.0 SH 113 of Kodambakkam _Sriperumbudur road
2026_HWAY_660498_1
TN.65/Sl.No.01/KPM /Upgradation of Core Road Networks in around Chennai City under CRIDP 2017-18
Open Tender
Civil Works - Highways
210 days
Kancheepuram
Please Refer Tender Documents
24 documents required · 24 mandatory
₹0
₹4.8 L
13 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
2 Mar 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers | |||||
| 1.1 | Road Work | 11,552 | Square Metre | 111.83 | ₹12,91,860.16 |
| 2Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Boxing including conveyance of cut earth away from the site with average lead | |||||
| 2.1 | Road Work | 6,696 | Cubic Metre. | 131.89 | ₹8,83,135.44 |
| 3Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (Grade - V Material ) | |||||
| 3.1 | Road Work | 2,102 | Cubic Metre. | 2,450.26 | ₹51,50,446.52 |
| 4Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (Grade - III Material ) | |||||
| 4.1 | Road Work | 1,042 | Cubic Metre. | 2,723.3 | ₹28,37,678.6 |
| 5Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | |||||
| 5.1 | Road Work | 2,627 | Cubic Metre. | 2,933.73 | ₹77,06,908.71 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_792471.xls
BOQ • 0.40 MB
Pricebid_KS_Road.pdf
Tender Documents • 0.55 MB
PQ_KS_Road.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid