| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.3 LAdmitted-Finance | -8.00% | ₹19.3 L | L1 | Admitted-Finance |
| 2 | L2₹21.0 LAdmitted-Finance | -0.10% | ₹21.0 L | L2 | Admitted-Finance |
| 3 | L3₹21.2 LAdmitted-Finance | +1.00% | ₹21.2 L | L3 | Admitted-Finance |
Tender Value
₹21.0 L
EMD Value
₹21,030
Closing Date
8 Apr 2026, 5:00 pmClosed
BDO DEOGAON
PANCHAYAT SAMITI OFFICE DEOGAON
REPAIR AND RENOVATION OF KASTURBA GANDHI BALIKA VIDYALAYA GIRLS HOSTEL BUILDING AT PONNY SUGAR MILL UPS UNDER DEOGAON BLOCK Civil El Composite Tender.
2026_PRBDO_127479_6
04/2025-26/DGN
Open Tender
Civil Works - Buildings
180 days
DEOGAON
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹21,030
Yes
18 Apr 2026
23 Mar 2026
9 Apr 2026
23 Mar 2026
8 Apr 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material nd stacking the serviceable material with all lifts and lead of 1000 metres | - | Cum | 623.45 | - |
| 2 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead. | - | Cum | 1,643.97 | - |
| 3 | Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead. A)Ground Floor | - | Sqm | 58.85 | - |
| 4 | B)First Floor | - | Sqm | 63.82 | - |
| 5 | Earth work in excavation of foundation trenches in ordinary soil except sheet rock and boulders (requiring blasting) including dressing and leveling the bed upto the required depth and depositing the excavated materials away form the site with all leads and lifts. T & P shoring and shuttering if required etc. complete as directed by engineer- in charge. | - | Cum | 282.43 | - |
| 6 | Supplying and filling in foundation and ditches with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance, loading and unloading , royalties and taxes of all materials and cost of all labour, sundries. T & P required for the work etc complete in all respect as per direction of Engineer incharge. | - | Cum | 885.58 | - |
| 7 | Providing & laying plain cement concrete 1:4:8 ( 1 cement 4 coarse and 8 graded stone aggregate fo 40 mm nominal size) in foundation and pinth including cost of hoisting, lowering laying concrete, ramming , watering and curing etc. complete to required levels laid in layers not exceeding 15cm thick including cost. Conveyance, loading and unloading, royalties and taxes all materials and cost of all labours, sundnes, T & P required for the work complete including dewatering if required as epr instruciton of Engineer-in- charge. | - | Cum | 5,795.36 | - |
| 8 | Providing, lifting, hoisting laying Reinforced cement concrete of M20grade in column footings s per approved designs and drawings having a minimum compressive strength ( in work test) 250 kg/Square cm. in 15 cm cubes at 28 days afterr mixing and tests conducted in accordance with I.S. 416 using 12 mm to 20 mm size black hard crusher broken grantie stone chips of approved quality from approved quarry washed and cleaned (20 mm size not to exceeds 25%) to be mixed in concrete mixure with ordinary portland cement (OPC) includin ghosting, lowering, lying and compacting concrete by using vibrators, watering andcuring for 28 days centering and shuttering and finishing the xposed surface mooth providing grooves of beads wherever necessary including cost. conveyance, loading and unloading , royaliies and teaxes of all materials and cost of all labours , sundries , T &P, required for the work etc. complete in all respect including centering & shuttering.complete as directed by engineer- in charge. A)Base/Footing | - | Cum | 5,733.12 | - |
| 9 | B) Column upto plinth | - | Cum | 17,340.73 | - |
| 10 | C) Plinth Beam | - | Cum | 6,487.72 | - |
stage.html
html • 0.03 MB
techsummary_585786.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
DTCNPonnysugar.pdf
Tender Documents • 1.70 MB
BOQ_585786.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid