Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-Finance PILLA PATULI STATION BAZAR PURBA BARDHAMAN | PATULI | PURBA BARDHAMAN | WEST BENGAL | 713512 | 1 | Accepted-Finance L1 | |
| 2 | 2₹3.2 L+₹33,068.17 (11.4%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹3.2 L+₹33,294.62 (11.5%)Accepted-Finance | 3 | Accepted-Finance L3 | |
| 4 | 4₹3.2 L+₹33,326.97 (11.5%)Accepted-Finance | 4 | Accepted-Finance L4 |
Tender Value
₹3.2 L
EMD Value
₹6,500
Closing Date
21 Jul 2026, 5:00 pmClosed
PRODHAN
BISWARAMBHA, PURBA BARDHAMAN
Construction of concrete drain with cover from Tapas Mahato house to STKK road at Kalekhantala.
2026_ZPHD_1032157_3
K-I/257/2026
Open Tender
CIVIL WORKS
Percentage
60 days
KALEKHANTALA
Please refer Tender documents.
2 documents required · 2 mandatory
₹750
₹6,500
27 Aug 2026
14 Jul 2026
23 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation for foundation trenches or drains in all shorts of soil dressing and ramming the bottom boiling out water as required depth upto 1.5m including trimming complete. | 1 | Cum | 1 | ₹1 |
| 1.02 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 1 | Cum | - | - |
| 1.03 | Single layer Brick Flat Soling with picked jhama brick. | - | Sqm | - | - |
| 1.04 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | - | Cum | - | - |
| 1.05 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | - | Cum | - | - |
| 1.06 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. II. Other than SAIL/ TATA/RINL | - | MT | - | - |
| 1.07 | Hire and labour charges for shuttering and centering with necessary staging upto 4m using approved spouts props completion of work (upto roof of ground floor.) (a) 25mm to 30mm thick wooden shuttering as per. In Ground floor,With out staging | - | Sqm | - | - |
| 1.08 | Leach Pit | - | No | - | - |
| 1.09 | Display Board | - | Cum | - | - |
| 1.1 | P-327, It- 17.06 TEST OF MATERIAL: A. Blast Furnace Slag, Cinder, Stone, Jhama, Laterite, etc. (i):- Grading by Sieve Analysis as per IS: 2386 (Part – I) | - | Sample | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 1.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.44 MB
BOQ_2535338.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .