Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
27 Nov 2026, 11:00 amDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer,WRD
O/o, The Executive Engineer, WRD., Periyar Main Canal Division, Melur.
Special repairs to 40th sluice in 12th BC of Periyar Main canal in Uranganpatti village of Melur Taluk in Madurai District.
2026_WRD_721569_1
10 2026-2027 JDO2 F.105 DATED.04.11.2026
Open Tender
Civil Works
Percentage
90 days
Uranganpatti
4 documents required · 4 mandatory
₹0
₹2,000
5 Nov 2026
5 Nov 2026
27 Nov 2026
5 Nov 2026
27 Nov 2026
5 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness of brick or stone masonry in Lime Mortar walls under 3 (Three) meters high etc, complete as directed by the Engineer in charge of works and as per the technical specifications. | 2 | Cubic Meter | 520.23 | ₹1,040.46 |
| 2 | Earthwork excavation for foundation Earth work Excavaction for foundation in hard stiff clay,stiff black cotton soil, Hard red earth, shales, murrams, gravel, stoney earth and earth mixed small size blouders and hard grvelly soil depositing on bank including shoring strutting and bailing out water wherever necessary, well rammed consolidated and deposting the surplus earth in places as shown by the depar tmental offices with an initial lead of 10metres and initial left of 2 metres and clearing, levelling the site etc., complying with standard specification and as directed by the departmental officers. | 19.41 | Cubic Meter | 147.02 | ₹2,853.66 |
| 3 | Suppling and filling with M.sand for filling in layers of not more than 15cm thick well rammed with water complying with standard specification and as directed by the departmental officers. | 6.64 | Cubic Meter | 2,035.54 | ₹13,515.99 |
| 4 | P.C.C. - M15 - 20mm
Providing and placing Plain Cement oncrete M 15 grade using crusher broken hard coarse aggregate (well graded) of nominal maximum size of 20mm and downgraded to I.S specified grading (To achieve the specified characteristic strength of 15N/mm2 in 28 days) and mixing the ingredients in approved mixer including dewatering of the placement site by baling / pumping and diverting wherever necessary, placing concrete in layers and water curing, finishing the surface with all leads and lifts etc., complete as directed by the Engineer in charge of works and as per the technical specifications. | 9.12 | Cubic Meter | 6,789.2 | ₹61,917.5 |
| 5 | Fabricating, Supplying and erection of Screw gearing steel shutters of size above upto 1.00 m width consist shutters of skin plate made out of 8mm thick mild steel plate and horizontally stiffened with 65x65x6mm mild steel Angle at an interval not more than 0.50m and vertical stiffeners made out of same section at an interval not more than 0.60m and provided with 8mm mild steel gusset plate of required size on both sides fastened with rust free bolts and nuts etc. Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipment. Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipment. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipment required conveying the dismantled materials to the section stores, cost of petty civil works, trialoperation of shutter and warranty for 5 years etc.,complete. | 0.21 | Square Meter | 57,527 | ₹12,080.67 |
| 6 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods sectioning, including watering and consolidation by power roller rolling with lead of 2KMCT including watering and consolidation by power roller ect, complete as directed by the engineer in charge of works and as per technical specifications. | 574.2 | Cubic Meter | 127.82 | ₹73,394.24 |
| 7 | Gst 18% | 1 | No | 1 | ₹1 |
| 8 | Sub Total | 1 | No | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_866457.xls
BOQ • 0.34 MB
document94.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .