| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -13.91% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹3,466.32 (0.02%)Admitted-Finance | -13.89% | ₹1.5 Cr+₹3,466.32 (0.02%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹71,059.52 (0.48%)Admitted-Finance | -13.50% | ₹1.5 Cr+₹71,059.52 (0.48%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹5.3 L (3.52%)Admitted-Finance | -10.88% | ₹1.5 Cr+₹5.3 L (3.52%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 Cr+₹7.3 L (4.88%)Admitted-Finance | -9.71% | ₹1.6 Cr+₹7.3 L (4.88%) | L5 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
9 Jun 2026, 6:00 pmClosed
Executive Engineer
PWD Division Rajgarh
Construction of Atal Pragati path at Reni ( MDR-151)
2026_CEPWD_562344_1
NIT NO. 04/ 2026-27 PWD DIVISION RAJGARH
Open Tender
Civil Works
Percentage
120 days
Alwar
Please Refer Tender Documents
4 documents required · 4 mandatory
₹2,000
EE PWD Dn-Rajgarh and MD, RISL, Jaipur
₹3.5 L
Yes
15 Jun 2026
25 May 2026
10 Jun 2026
25 May 2026
9 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART - A : C.C. PAVEMENT | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | - | Hect. | 10,374 | - |
| 3 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | - | Cum | 515 | - |
| 4 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | - | Cum | 25 | - |
| 5 | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300-1 and 300-2 for subgrade construction as per MoRTH Specification Clause 305.3.4 | - | Cum | 28 | - |
| 6 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | - | Cum | 44 | - |
| 7 | CARRIAGE OF MATERIALS Earth, Sand, Lime, Morrum manure or sludge | - | Cum | 66 | - |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading I Material | - | Cum | 461 | - |
| 9 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,complete as per MoRTH Specification Clause 401.For Grading III Material | - | Cum | 407 | - |
| 10 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | - | Cum | 2,418 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.65 MB
Tendernotice_2.pdf
PDF • 0.46 MB
Rateanalysismdr151.xlsx
Tender Documents • 0.13 MB
Tenderdetails.pdf
Tender Documents • 1.77 MB
BOQ_1000679.xls
BOQ • 0.30 MB
Specialcondition.pdf
Tender Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .