Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAdmitted-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | ₹22.9 L | L1 | Admitted-Finance |
| 2 | L2₹23.2 LAdmitted-Finance | ₹23.2 L | L2 | Admitted-Finance |
| 3 | L3₹23.3 LAdmitted-Finance | ₹23.3 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K R ENTERPRISE L3 | N.K. ENTERPRISE L2 | F.R. ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Part A: Installation of 40D complete belt conveyor for a length of 120 metre from 40D/-2L to 40D/+2L | ||||||
| 1.01 | Transportation of one 6.6kV, DOL HT Starter from surface to 39-40Dip/-1L after loading it on MUV then unloading and placing manually on platform | 1 | WORK | 11,490.37 ₹11,490.37 | 11,433.2 ₹11,433.20 | 11,320 ₹11,320 |
| 1.02 | Transportation of 650 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to 49Dip/1L with the help of MUV and laying and hanging it from 49Dip/1L to 40Dip/-1L | 1 | WORK | 66,810.59 ₹66,810.59 | 66,478.2 ₹66,478.20 | 65,820 ₹65,820 |
| 1.03 | Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. from surface to 40Dip/-2L with the help of MUV | 1 | WORK | 4,23,748.86 ₹4.2 L | 4,21,640.66 ₹4.2 L | 4,17,466 ₹4.2 L |
| 1.04 | Transportation from surface and installation of Loop Take-up Unit Complete with fencing at 40 dip in between -1L & 0L with the help of MUV | 1 | WORK | 1,51,161.25 ₹1.5 L | 1,50,409.2 ₹1.5 L | 1,48,920 ₹1.5 L |
| 1.05 | Transportation from surface and installation of Tail-end Unit Complete at 40Dip/+2L after loading it on MUV with the help of MUV | 1 | WORK | 18,626.17 ₹18,626.17 | 18,533.5 ₹18,533.50 | 18,350 ₹18,350 |
| 1.06 | Transportation and installation of 120 mtr. of belt structure, after loading it on MUV from surface (weight of 1200mm structures is 0.085 Te/mtr.) | 1 | WORK | 46,184.78 ₹46,184.78 | 45,955 ₹45,955 | 45,500 ₹45,500 |
| 1.07 | Transporting, laying, lapping & jointing of 260 mtr. of belting (20 mtr. belt in loop) | 1 | WORK | 59,380.43 ₹59,380.43 | 59,085 ₹59,085 | 58,500 ₹58,500 |
| 1.08 | Supply of G.I. wire 8 SWG (for signalling system) | 24.72 | KG | 91.35 ₹2,258.28 | 90.9 ₹2,247.05 | 90 ₹2,224.80 |
| 1.09 | Supply of Bobin insulator (for signalling system) | 27 | NOS | 20.3 ₹548.13 | 20.2 ₹545.40 | 20 ₹540 |
Tender Value
₹22.9 L
EMD Value
₹28,700
Closing Date
3 Feb 2026, 11:00 amClosed
Area Engineer EnM
Office of the General Manager, Jhanjra Area, ECL
Transportation, Installation, commissioning an trial run including necessary fabrication jobs (including civil works) of one 1200mm width ,2x150KW,6.6KV PVC Belt Conveyor for a length of 120mtr and installation of belt structure for 504mtr length(12
2026_ECL_351682_1
ECL/GM/JNR/EnM/A2/25-26/114 dated 16.01.2026
Open Tender
Miscellaneous Works
60 days
Jhanjra UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹28,700
16 Feb 2026
22 Jan 2026
4 Feb 2026
22 Jan 2026
3 Feb 2026
23 Jan 2026
22 Jan 2026 - 29 Jan 2026
Part A: Installation of 40D complete belt conveyor for a length of 120 metre from 40D/-2L to 40D/+2L
Transportation of one 6.6kV, DOL HT Starter from surface to 39-40Dip/-1L after loading it on MUV then unloading and placing manually on platform
Transportation of 650 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to 49Dip/1L with the help of MUV and laying and hanging it from 49Dip/1L to 40Dip/-1L
Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. from surface to 40Dip/-2L with the help of MUV
Transportation from surface and installation of Loop Take-up Unit Complete with fencing at 40 dip in between -1L & 0L with the help of MUV
Transportation from surface and installation of Tail-end Unit Complete at 40Dip/+2L after loading it on MUV with the help of MUV
Transportation and installation of 120 mtr. of belt structure, after loading it on MUV from surface (weight of 1200mm structures is 0.085 Te/mtr.)
Transporting, laying, lapping & jointing of 260 mtr. of belting (20 mtr. belt in loop)
Supply of G.I. wire 8 SWG (for signalling system)
Supply of Bobin insulator (for signalling system)
Supply of M.S. Nut & Bolt 3/8''x 3" with washer
Supply of Oxygen cylinder (7.1 cu.m./cylinder)
Supply of DA cylinder (6.2 cu.m / cylinder)
Civil foundation work for drive head, discharge, loop takeup and platform at 39-40R/1L R-V seam in SHCM-1
Part B. Fabrication of Loop-take up structure for 1200mm belt conveyor
Fabrication of loop take up unit of 6 mtr long and Fixed drum unit base frame ( ISMB- 200 & 250 joist,ISMC-150 & 125 Channel, IAS-90*90*8 & 65*65*6 angle, Ms plate-20 mm thick)
Fabrication of Movable trolley for loop take up unit. (ISMB- 200 joist &MS plate-20 mm thick)
Fabrication of tension arrangement frame. (ISMB- 200 joist ,IAS- 65*65*6 angle, Ms plate-20 mm thick)
Supply of Oxygen cylinder (7.1 cu.m./cylinder)
Supply of DA cylinder (6.2 cu.m / cylinder)
Part C: Extension of one 1200mm wide PVC belt conveyor for a length of 504 mtr. from 2L /40D to 14L/40D i.e total 12 pillar
Transportation and Installation of 504mtr. of belt structure, after loading it on MUV from surface(weight of 1200mm structures is 0.085MT/mtr.)
Transporting, laying, lapping & jointing of 1008 mtr. of belting
Shifting and installation of tail end for every shifting( 12 times extension )(wt = 1*12 Te=12Te)
Extension of pull cord ,signalling and lock out devices.
Supply of G.I wire 8 SWG
Supply of Bobin insulator
Supply of M.S Nut & Bolt
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_364440.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid