Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹67.9 L+₹9.1 L (15.5%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹64.7 L
EMD Value
₹1.3 L
Closing Date
13 Jul 2026, 6:00 pmClosed
Executive Engineer PWD Diviosion Gandoh
Executive Engineer PWD Diviosion Gandoh
Permanent restoration of wss dhadkaie phat sinno chowanry kandaloo kot top draie
2026_PWDJK_314729_7
E-NIT 16 of 2026-27
Open Tender
Civil Works
Percentage
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Engineer PWD Diviosion Gandoh
₹1.3 L
17 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
6 Jul 2026 - 11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of Material from jammu Mechanical Transport (G.I) 290 km by mechanical transport and from road side to site of work avg 5 km by Head Load | 4.47 | Cum | 5,288.05 | ₹23,637.58 |
| 2 | Carriage of Material from jammu Mechanical Transport (HDPE) 250 km by mechanical transport and from road side to site of work avg 5 km by Head Load | 4.9 | Cum | 17,695.88 | ₹86,709.81 |
| 3 | Providing and Fixing G.I /HDPE Pipes complete with G.I Fittings excluding trenches and refilling etc (External Work) HDPE Pipe 63mm dia | 200 | Mtr | 203 | ₹40,600 |
| 4 | HDPE Pipe 50mm dia | 3,050 | Mtr | 159 | ₹4,84,950 |
| 5 | HDPE Pipe 40mm dia | 4,050 | Mtr | 100.5 | ₹4,07,025 |
| 6 | HDPE Pipe 32mm dia | 30,200 | Mtr | 64.1 | ₹19,35,820 |
| 7 | HDPE Pipe 25mm dia | 20,500 | Mtr | 47.14 | ₹9,66,370 |
| 8 | G.I Pipe 20 mm dia | 300 | Mtr | 255.2 | ₹76,560 |
| 9 | G.I Pipe 15 mm dia | 1,620 | Mtr | 206.5 | ₹3,34,530 |
| 10 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:(70% all kind of soil 30% Ordinary Rock) | 1,119.25 | Cum | 612.95 | ₹6,86,044.29 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.66 MB
BOQ_1019360.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .