Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.4 LAdmitted-Finance | -45.70% | ₹28.4 L | L1 | Admitted-Finance |
| 2 | L2₹36.9 L+₹8.5 L (29.8%)Admitted-Finance | -29.51% | ₹36.9 L+₹8.5 L (29.8%) | L2 | Admitted-Finance |
| 3 | L3₹38.2 L+₹9.7 L (34.3%)Admitted-Finance | -27.10% | ₹38.2 L+₹9.7 L (34.3%) | L3 | Admitted-Finance |
| 4 | L4₹40.9 L+₹12.4 L (43.6%)Admitted-Finance | -22.00% | ₹40.9 L+₹12.4 L (43.6%) | L4 | Admitted-Finance |
Tender Value
₹52.4 L
EMD Value
₹1.0 L
Closing Date
4 Jun 2026, 3:00 pmClosed
DD(Hort.)-II
Hort.Div. No-II, DDA
Sub Head- S/S of Good earth, Jamuna Sand, JCB, Agro Shed net, Hire Hydraulic Excavator, Digging of holes and plants at site.
2026_DDA_910741_1
NIT No.09/DD/HD-2/DDA/2026-27.
Open Tender
Agricultural or Forestry
Percentage
60 days
As per Tender Document
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.0 L
18 Jun 2026
29 May 2026
5 Jun 2026
29 May 2026
4 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and Stacking of good earth at site including royalty and carriage with all lead and lift. (Good earth measured in stacks will be reduced by 20 % for payment) | - | Cum | 803.75 | - |
| 2 | Supplying and Stacking of Jamuna sand i/c royalty carriage and loading, unloading for all lead and lift at site. | - | Cum | 2,134.43 | - |
| 3 | Supply of best quality agro shed net green color (50m × 3m) 75:25 | - | Each | 3,465 | - |
| 4 | Providing of Tuflex Garden fencing Hexagonal net/or equivalent of green colour having contents ( Weight grams/sqm. 510 (+/- 8%)) in width of 60 cm at site as per direction of Engineer in charge. | - | Sqm | 276.55 | - |
| 5 | Hire of Hydraulic Excavator (3D) with driver and fuel. | - | days | 7,850 | - |
| 6Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lift ( cost of manure , sludge or extra good earth if needed to be paid for separately); | |||||
| 6.1 | Holes. 0.45 m. dia and 0.45 m. deep | - | Each | 20.65 | - |
| 7 | Providing and Stacking of Adusha of ht. 30 cm with multi branches in Poly bag of size 20 cm. as per direction of the officer-in- charge. | - | Each | 32.5 | - |
| 8 | Providing and stacking of Hibiscus rosasinensis of height 60-75 cm. with 5-6 branches in p.bag of size 25 cm as per direction of the officer-in-charge | - | Each | 49.35 | - |
| 9 | Providing and Stacking of Kalmegh of ht. 30 cm with multi branches in Poly bag of size 20 cm. as per direction of the officer-in-charge | - | Each | 32.5 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
NIT9.pdf
Tender Documents • 1.78 MB
BOQ_957174.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .