| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹34.0 LAccepted-Finance | ₹34.0 L | L-1 | Accepted-Finance LOW RATE |
| 2 | L-3₹38.2 LRejected-Finance E MUTHILINGAPURAM VILLAGE SATTUR TALUK VIRUDHUNAGAR DISTRICT UNDER MADURAI DIVISIONAL OFFICE OF TAMIL NADU STATE OFFICE | VIRUDHUNAGAR | TAMIL NADU | 626001 | ₹38.2 L | L-3 | Rejected-Finance HIGH RATE |
| 3 | L-3₹48.5 LRejected-Finance F22 117 SECTOR 3 ROHINI 110085 DELHI | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹48.5 L | L-3 | Rejected-Finance HIGH RATE |
| 4 | Rejected-Technical | - | - | Rejected-Technical reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical reject |
| Sl No | Description | Qty | Unit | M/S M L BROTHER L3 | Navkaar Enterprises L1 | RAHUL PETRO PROJECTS PVT LTD L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 81,100 | Sqm | 8 ₹6,48,800 | 8 ₹6,48,800 | 5 ₹4,05,500 Lowest |
| 2.00 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil | 350 | Each | 200 ₹70,000 | 100 ₹35,000 Lowest | 120 ₹42,000 |
| 3.00 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. Ordinary rock | 150 | Each | 300 ₹45,000 | 200 ₹30,000 Lowest | 260 ₹39,000 |
| 4.00 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 48,660 | Metre | 20 ₹9,73,200 | 14 ₹6,81,240 | 13 ₹6,32,580 Lowest |
| 5.00 | Supplying at site prestressed precast cement concrete post of size 100x100 mm & 7ft height, prestressed 3 mm dia. of mild steel wire of 4 nos along post length complete. as per direction & satisfaction of EIC. | 500 | Each | 1,400 ₹7,00,000 | 497 ₹2,48,500 | 350 ₹1,75,000 Lowest |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 70 | Cum | 6,000 ₹4,20,000 | 5,500 ₹3,85,000 Lowest | 6,200 ₹4,34,000 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 540 | Cum | 250 ₹1,35,000 | 200 ₹1,08,000 Lowest | 450 ₹2,43,000 |
| 8.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 3,400 | Cum | 150 ₹5,10,000 | 100 ₹3,40,000 Lowest | 100 ₹3,40,000 Lowest |
| 9.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.Ordinary rock | 1,700 | Cum | 350 ₹5,95,000 | 200 ₹3,40,000 Lowest | 450 ₹7,65,000 |
| 10.00 | Providing and operating JCB with all Petrol, Oil, Lubricant, including driver and any other expenses on this account etc complete for levelling , demolishing of structures complete. as directed by Engineer-In-Charge. | 240 | Per hour | 1,200 ₹2,88,000 | 999 ₹2,39,760 Lowest | 1,150 ₹2,76,000 |
Tender Value
₹53.0 L
EMD Value
₹1.6 L
Closing Date
6 May 2026, 6:00 pmClosed
ASSTT.GEN. MANAGER (E-C)
M.P. AIRPORTS UDAIPUR
Provision of barbed wire fencing for physical possession of newly allotted land by state Govt. at M.P. Airport, Udaipur
2026_AAI_274613_1
AAI/UDR/AGM(E-C)/W-161/26-27
Open Tender
Civil Works
Item Rate
300 days
M.P. AIRPORT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹1.6 L
22 Jun 2026
15 Apr 2026
8 May 2026
15 Apr 2026
6 May 2026
15 Apr 2026
15 Apr 2026 - 22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | Sqm | - | - |
| - | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil | - | Each | - | - |
| - | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. Ordinary rock | - | Each | - | - |
| - | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | - | Metre | - | - |
| - | Supplying at site prestressed precast cement concrete post of size 100x100 mm & 7ft height, prestressed 3 mm dia. of mild steel wire of 4 nos along post length complete. as per direction & satisfaction of EIC. | - | Each | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | Cum | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | - | Cum | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.Ordinary rock | - | Cum | - | - |
| - | Providing and operating JCB with all Petrol, Oil, Lubricant, including driver and any other expenses on this account etc complete for levelling , demolishing of structures complete. as directed by Engineer-In-Charge. | - | Per hour | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.27 MB
BOQ_320897.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].