Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Fee/PreQual/Technical/Finance | -31.80% | ₹6.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.8 L+₹51,778.57 (8.21%)Admitted-Fee/PreQual/Technical/Finance | -26.20% | ₹6.8 L+₹51,778.57 (8.21%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.9 L+₹62,873.98 (9.97%)Admitted-Fee/PreQual/Technical/Finance 04 NCC TIRAHA INFORENT OF AJIT SINGH SHOP NO 4 BALLIA BALLIA BALLIA UTTAR PRADESH 277001 | BALLIA | UTTAR PRADESH | 277001 | -25.00% | ₹6.9 L+₹62,873.98 (9.97%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.7 L+₹2.4 L (37.8%)Admitted-Fee/PreQual/Technical/Finance | -6.00% | ₹8.7 L+₹2.4 L (37.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹9.2 L+₹2.9 L (46.3%)Admitted-Fee/PreQual/Technical/Finance | -0.23% | ₹9.2 L+₹2.9 L (46.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.2 L
EMD Value
₹18,500
Closing Date
8 Aug 2026, 5:00 pmClosed
EE RDSD LATEHAR
EE RDSD LATEHAR
Renovation of the Anganwadi Center Building Salve-03 and Construction work of Septic Tank, Deep Boring and Water Harvesting in Salve village under panchayat Salve block Bariyatu District Latehar
2026_RDSPL_116738_4
EE/RDSD/LATEHAR/20/2026-27
Open Tender
Civil Works
Percentage
60 days
LATEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,250
₹18,500
Yes
10 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
8 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | M2 | 21.46 | - |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - A0 and disposal of excavated earth as obtained to a distance upto 50M including all lifts levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I. | 1 | M3 | 167.33 | ₹167.16 |
| 3 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | - | M3 | 55.28 | - |
| 4 | Providing coarse clean Sand in Filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 1 | M3 | 589.51 | ₹588.92 |
| 5 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 1 | M2 | 356.52 | ₹356.16 |
| 6 | Providing designation 75B one brick flat soling joints fitted with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | - | M2 | 330.34 | - |
| 7 | Providing designation 75A brick work in C.M. (1:6) in foundation and plinth approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes an | 1 | M3 | 5,110.26 | ₹5,105.15 |
| 8 | Providing designation 125mm thick reinforced designation 75A brick work in C.M. (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening, carriage of materials, scaffolding, raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 1 | M2 | 713.49 | ₹712.78 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 1 | M3 | 4,598.23 | ₹4,593.63 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone
aggregate 40 mm nominal size) | - | M3 | 3,751.64 | - |
stage.html
html • 0.03 MB
finance_157836.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Sbd_4.pdf
Tender Documents • 0.91 MB
BOQ_157836.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .