| 1 | 1₹43.4 LAccepted-AOC | 1 | Accepted-AOC Awarded | |
| 2 | 2₹44.4 L+₹98,141 (2.26%)Rejected-AOC 201 2ND FLOOR IRIS TECH PARK SECTOR 48 SOHNA ROAD GURGAON 122018 HARYANA | GURUGRAM | HARYANA | 122018 | 2 | Rejected-AOC Not awarded | |
| 3 | 3₹48.7 L+₹5.3 L (12.1%)Rejected-AOC | 3 | Rejected-AOC Not awarded | |
| 4 | Rejected-Technical | - | Rejected-Technical Not compiled with technical documents | |
| 5 | Rejected-Technical | - | Rejected-Technical Not compiled with technical documents |
Tender Value
₹48.7 L
EMD Value
₹98,000
Closing Date
29 Nov 2021, 5:00 pmClosed
XEN PWD Jhajjar
XEN PWD Jhajjar
Road cut from Shiv Chowk to Civil Hospital for laying of Sewer line at Beri in Jhajjar District
2021_HRY_189816_2
PWD/JJR/Shiv chowk to Civil Hospital Beri
Open Tender
Civil Works
Works
90 days
Jhajjar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
₹98,000
Yes
28 Jan 2022
9 Nov 2021
30 Nov 2021
9 Nov 2021
29 Nov 2021
9 Nov 2021
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material with all lead and lift as per direction of Engineer - in - charge. Nominal concrete 1 :2:4 or leaner mix (i/c equivalent cum design mix) (Based on HSR 5.23.2)
Dismantling of road including, soiling and wearing coat, screening and stacking of old serviceable material, complete in all respect. (Based on HSR 17.3) (Dismantling upto 200mm GSB)
Excavation for roadwork in soil by mechanical means including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and any lead as per technical clause 301 of MORT&H specifications. (Based on HSR 17.10.1)
Construction of Embankment (Sub grade upto 500 mm) with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications (Based on HSR 17.6) Note:- In case the quantity of earth work calculated with NSL and finished level found to be less than 805.00 Cum. Then actual quantity (less than 805.00 Cum) will be paid. In case quantity worked out is more than 805.00 cum, then only 805.00 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached at section 5 of DNIT. Note:- No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Providing and laying 200 mm thick granular sub base with coarse Graded Material - Grade-I (Table:- 400.2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grade-I material (HSR 17.15.1) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Construction of 150 mm dry lean cement concrete Subbase over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15: 1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications (HSR 17.44) Note:- Minimum cement content for this item will be 150 kg. per cum of concrete as per approved job mix formula. If the cement content is more than 150 kg / cum, then the extra cement will be incidental to work and nothing shall be payable on this account.
Construction of 300 mm un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, complete as per clause 602 of MORT&H specifications. (Minimum content of cement 440 kg/cum) (Based on HSR 17.45.6) Note:- Minimum cement content for this item will be 440 kg. per cum of concrete as per approved job mix formula. If the cement content is more than 440 kg / cum, then the extra cement will be incidental to work and nothing shall be payable on this account.
Recovery items : The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under:-Stone Metal WBM @ 831/- P. Cum. All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate/ reserve rate whichever is higher side and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. The reserve price.
KALUWALA CONSTRUCTION PRIVATE LIMITED
rahul goverment contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .