| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.4 LAccepted-Finance | L1 | Accepted-Finance Lowest rate Quoted Bidder | |
| 2 | L2₹55.4 L+₹94,508.56 (1.74%)Accepted-Finance | L2 | Accepted-Finance Rate quoted Higher than L1 Bidder |
| Sl No | Description | Qty | Unit | L RAMESH L2 | HARSHINI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing, Commissioning and Handing over of 25Kw on-grid Solar PV Plant comprising of :
i) Solar panels of type monocrysteline, PERC, etc.,
ii)Power Conditioning Unit(PCU) with MPPT, inverter, Controls, Protection Devices, Interconnecting D.C., Cables, Connectors, Junction Boxes and accessories.
iii) D.C.D.B
iv) A.C.D.B
v) A.C.Cables and accessories
vi) Lighting arestor, earthing etc.,
vii) Module Metallic Mounting Structures
viii) Installation, Testing and Commissioning corresponds to BIS and IEC requirements as detailed below | 3 | Set | 15,20,269 ₹45,60,807 | 14,94,281 ₹44,82,843 Lowest |
| 1.01Scope of the proposal: 1)Mono/poly Crystalline PERC Solar PV Modules 2) Module Mounting Structure 3) Array junction boxes 4) DC Distribution box | |||||
| 1.025) Inverter / PCU 6) AC Distribution box 7) Energy Meter 8) Protection - Earthing, Lightning, Surge 9) Cables 10) Drawing & Manuals 11) Miscellaneous | |||||
| 1.03TECHNICAL SPECIFICATIONS 1. SOLAR PV MODULES: consisting of required number of MonoCrystalline PERC PV modules 1.1. The PV modules and Solar Cell used should be made in India. 1.2. The PV modules used must qualify to the latest edition of IEC standards or equivalent BIS standards, | |||||
| 1.04i.e. IEC 61215/IS14286, IEC 61853-Part I/IS 16170-Part I, IEC 61730 Part-1 & Part 2 and IEC 62804 (PID). For the PV modules to be used in a highly corrosive atmosphere throughout their lifetime, they must qualify to IEC 61701/IS 61701. | |||||
| 1.051.3. The rated power of solar PV module shall have maximum tolerance up to +3% 1.4. The peak-power point current of any supplied module string (series connected modules) shall not vary by +1% from the respective arithmetic means for all modules and/or for all module strings (connected to the same MPPT), as the case may be. | |||||
| 1.061.5. The peak-power point voltage of any supplied module string (series connected. | |||||
| 1.07modules) shall not vary by + 2% from the respective arithmetic means for all modules and/or for all module strings (connected to the same MPPT), as the case may be. 1.6. The temperature co-efficient power of the PV module shall be equal to or better than -0.45%/°C. | |||||
| 1.081.7. Solar PV modules of minimum capacity 300Wp to be used. 1.8. The PV Module efficiency should be minimum 16%. 1.9. Solar PV modules of minimum fill factor 75%, to be used1.10. All electrical parameters at STC shall have to be provided. | |||||
| 1.091.11. The PV modules shall be equipped with IP 65 or better protection level junction box with required numbers of bypass diodes of appropriate rating and appropriately sized output power cable of symmetric length with MC4 or equivalent solar connectors. The IP level for protection may be chosen based on following conditions: | |||||
Tender Value
₹52.6 L
EMD Value
₹36,300
Closing Date
18 Mar 2026, 3:00 pmClosed
Superintending Engineer
Office of Superintending Engineer PWD Buildings construction and maintenance circle Madurai
Second Call-Providing On Grid Solar PV Plant arrangements to the Construction of Additional Court Building to accommodate 18 Court Halls in the District Court campus at Madurai in Madurai District.
2026_PWD_673406_1
60SE/Bldgs C and M Circle Madurai 2025-26 dated 10.03.2026
Open Tender
Electrical Works
Lump-sum
90 days
District Court
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹36,300
12 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Installation, Testing, Commissioning and Handing over of 25Kw on-grid Solar PV Plant comprising of :
i) Solar panels of type monocrysteline, PERC, etc.,
ii)Power Conditioning Unit(PCU) with MPPT, inverter, Controls, Protection Devices, Interconnecting D.C., Cables, Connectors, Junction Boxes and accessories.
iii) D.C.D.B
iv) A.C.D.B
v) A.C.Cables and accessories
vi) Lighting arestor, earthing etc.,
vii) Module Metallic Mounting Structures
viii) Installation, Testing and Commissioning corresponds to BIS and IEC requirements as detailed below | 3 | Set | - | - |
| 1.01 | Scope of the proposal:
1)Mono/poly Crystalline PERC Solar PV Modules
2) Module Mounting Structure
3) Array junction boxes
4) DC Distribution box | - | - | - | - |
| 1.02 | 5) Inverter / PCU
6) AC Distribution box
7) Energy Meter
8) Protection - Earthing, Lightning, Surge
9) Cables
10) Drawing & Manuals
11) Miscellaneous | - | - | - | - |
| 1.03 | TECHNICAL SPECIFICATIONS
1. SOLAR PV MODULES: consisting of required number of MonoCrystalline PERC PV modules
1.1. The PV modules and Solar Cell used should be made in India.
1.2. The PV modules used must qualify to the latest edition of IEC standards or equivalent BIS standards, | - | - | - | - |
| 1.04 | i.e. IEC 61215/IS14286, IEC 61853-Part I/IS 16170-Part I, IEC 61730 Part-1 & Part 2 and IEC 62804 (PID). For the PV modules to be used in a highly corrosive atmosphere throughout their lifetime, they must qualify to IEC 61701/IS 61701. | - | - | - | - |
| 1.05 | 1.3. The rated power of solar PV module shall have maximum tolerance up to +3%
1.4. The peak-power point current of any supplied module string (series connected modules) shall not vary by +1% from the respective arithmetic means for all modules and/or for all module strings (connected to the same MPPT), as the case may be. | - | - | - | - |
| 1.06 | 1.5. The peak-power point voltage of any supplied module string (series connected. | - | - | - | - |
| 1.07 | modules) shall not vary by + 2% from the respective arithmetic means for all modules and/or for all module strings (connected to the same MPPT), as the case may be.
1.6. The temperature co-efficient power of the PV module shall be equal to or better than -0.45%/°C. | - | - | - | - |
| 1.08 | 1.7. Solar PV modules of minimum capacity 300Wp to be used.
1.8. The PV Module efficiency should be minimum 16%.
1.9. Solar PV modules of minimum fill factor 75%, to be used1.10. All electrical parameters at STC shall have to be provided. | - | - | - | - |
| 1.09 | 1.11. The PV modules shall be equipped with IP 65 or better protection level junction box with required numbers of bypass diodes of appropriate rating and appropriately sized output power cable of symmetric length with MC4 or equivalent solar connectors. The IP level for protection may be chosen based on following conditions: | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
form18courthallsolarelec.pdf
Tender Documents • 1.29 MB
BOQ_809384.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .