Tender Value
₹8.3 Cr
EMD Value
₹16.7 L
Closing Date
10 Oct 2023, 5:00 pmClosed
DGM(P)
Deputy General Manager (P) National Highways and Infrastructure Development Corporation Limited. Regional Office, 2nd Floor, Agnishanti Business Park, Opp. AGP Office GNB Road, Ambari, Guwahati- 781001
Repair and Restoration of Km 175.900 to 180.000 of NH 06 including Toll Plaza and km 197.910 to km 200.460 (at selected locations) in FY 23-24
2023_NHIDC_774172_1
RO/Sil/NH6/MNR/Tender/23-24
Open Tender
Civil Works
Item Rate
60 days
Assam
Please refer Tender Documents
5 documents required · 5 mandatory
₹11,800
NHIDCL
₹16.7 L
NHIDCL, RO Guwahati
16 Nov 2023
29 Sept 2023
11 Oct 2023
29 Sept 2023
10 Oct 2023
29 Sept 2023
29 Sept 2023 - 4 Oct 2023
5 Oct 2023
Amount
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) from private land
Scarifying Existing bituminious Surface to a Depth of 50mm by Mechanical Means (Scarifying the existing bituminious surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres)
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.) for grading- II Material
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )
Prime coat A. Prime coat (Providing and applying primmer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60kg/sqm using mechanical means.) (Including cost of testing of materials at site and laboratory as directed by the deptt.) (ii) With Bitumen Emulsion-CSS-1 (IS- 8887-2004)
Tack Coat (for DBM) Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by deptt.) (II) With Bitumen Emulsion CSS-1 (IS:8887-2004) (c) Granular Surfaces treated with primer
Tack Coat (for BC) Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by deptt.) (II) With Bitumen Emulsion CSS-1 (IS:8887-2004) (a) Normal Bituminous Surface
Dense Graded Bituminous Macadam (80mm) (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H cl. no. 507. complete in all respect. (Including cost of testing of materials at site and laboratory as directed by the deptt.) (b) With rock dust as filler (refer table 500-9 of MoRT&H specification) (i) with 60/70 or VG-30 grade bitumen (ii) for Grading II (19 mm nominal size)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoR&TH cl. no.509. complete in all respect. (b). With rock dust as filler (refer table 500-9 of MoRT&H Specification) (I) with 60/70 or VG 30 - (ii) for Grading II (13 mm nominal Size)
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes and conforming to the MoRT&H specifications
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600:1 , cement concrete not to be less than 150kg/cum, optimum moisture content to be determined during the trial length construction, concrete strength not to be less than 10Mpa at 7 days, mixed in a batching plant, transported to the site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) (Including carriage up to initial lead of 5Km. from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant.)
Cement Concrete Pavement '(A) Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mixed design, transported to the site, laid with a fixed form or slip form paver, spread , compacted and finished in a continuous operation includuing provision of contraction, expansion, construction and longitudinal joints, joint filler, seperation membrane, sealent primer, sealent joint , debonding strips dowel bar, tie rod, admixured as approved, curing compopund, finishing to lines and grades as per drawing. (Including carriage up to initial lead of 5Km. from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant.)
Dismantling of cement Concrete pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking into pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 m, stacking serviceable materials and unserviceable materials separately.
b. Providing and erecting Ministar Road Studs b) Two Way reflective (with butyl adhesive) with dimensions 68x 34x 9.8mm plastic body with 2x8 glass elements
Hill Side Drain Clearance (Removal of earth from choked hill drain and disposing it to valley side manually)
Dipayan Paul and Chanchal Paul JV
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .