Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | -47.10% | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.1 L+₹16,195.33 (2.04%)Admitted-Finance | -46.02% | ₹8.1 L+₹16,195.33 (2.04%) | L2 | Admitted-Finance |
| 3 | L3₹8.4 L+₹51,435.18 (6.48%)Admitted-Finance | -43.67% | ₹8.4 L+₹51,435.18 (6.48%) | L3 | Admitted-Finance |
| 4 | L4₹8.6 L+₹71,529.39 (9.02%)Admitted-Finance | -42.33% | ₹8.6 L+₹71,529.39 (9.02%) | L4 | Admitted-Finance |
| 5 | L5₹8.8 L+₹83,975.81 (10.6%)Admitted-Finance | -41.50% | ₹8.8 L+₹83,975.81 (10.6%) | L5 | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
19 Aug 2026, 6:00 pmClosed
Executive Engineer RNB Division Chadoora
Chadoora
Restoration Humpora Eidgah link Road.
2026_PWDJK_320624_4
NIT NO 36
Open Tender
Civil Works
Percentage
21 days
CHADOORA
AS PER NIT
4 documents required · 4 mandatory
₹600
Yes
Executive Engineer RNB Division Chadoora
₹30,000
Yes
24 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. All kinds of soil | 192 | Cum | 187.3 | ₹35,961.6 |
| 2 | Providing & Laying of Stone Soling tightly hand packed including watering, ramming and all other carriages, complett job | 72 | Cum | 1,000 | ₹72,000 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size | 36 | cum | 5,202.9 | ₹1,87,304.4 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 86.88 | cum | 7,788.4 | ₹6,76,656.19 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases of columns etc. for mass concrete. | 57.6 | sqm | 286.35 | ₹16,493.76 |
| 6 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all compete upto plinth level. | 3,456 | kg | 123.2 | ₹4,25,779.2 |
| 7carriage of materials from source to site of work including loading unloading complete by mechanical transport. | |||||
| 7.01 | Stone agg.for an average lead of27 kms. | 110.16 | cum | 487.22 | ₹53,672.16 |
| 7.02 | sand for an avg. lead of 35 Km | 55.08 | Cum | 575.54 | ₹31,700.74 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1066478.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .