Tender Value
₹10.2 L
EMD Value
₹20,500
Closing Date
5 Apr 2026, 4:00 pmClosed
Executive Officer Banka
EO
NAGAR PRISHAD OFFICE
Executive officer Banka
EO
Construction Of Detailes R.C.C Nala & Road & Cover form in ward No-17
128341
G-38 (NIT-19/2025-26)
Open Tender
CIVIL
Banka
• Name of Bidder
• Address of bidder
• email id/ mobile number
• GST details
• Pan card details
CIVIL
PERCENTAGE
L1
1
9 documents required · 9 mandatory
₹2,500
Processing Fee: 590
₹20,500
Yes
Metting Hall Nagar Parishad banka
10 May 2026
30 Mar 2026
6 Apr 2026
30 Mar 2026
5 Apr 2026
30 Mar 2026
1 Apr 2026
Quantities & Cost Estimate for R.C.C. Slab Culvert - 1 No. x 3 M Span x 2 M Vent Height
Top Long & Cross Bars
0.6 0.22 0.15 0.02 mm Expansion Joint
1:3 B/F Soling Distribution Bars-
L/S Filling 10 mm @ 0.175
Abt. Cap, Dirt wall & Coping Surface Steel
0.2 0.075 PCC M-15 200mm Thick
0.075 Brick Flat Soling 75mm Thich
0.15 Local Sand Filling 150mm Thick
Sectional Elevation
Section of Return Wall
Quantities & Cost Estimate for R.C.C. Slab Culvert - No. x M Span x M Vent Height
Sl No SOR No. Item of work involved No. Length Width Height / Thickness Total Qty Unit Rate (in Rs) Amount (in Rs)
1 Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Abutment 2 x x x =
Return Wall x x x =
Floor Under Deck Slab 1 x x x =
10% Qty Extra for Slope =
11.2 Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108 - rate as per item No. 11.2 (I) of Chapter 11
Abutment x x x =
Return Wall x x x =
Floor Under Deck Slab x x x =
TEC Brick Flat Soling in Foundation & Flooring :-- Brick Flat Soling in foundation Trenches as per drawing and technical specification Clause 1108
Return Wall x x =
Floor Under Deck Slab x x =
11.4 I(i) 800 & 1200 Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M15 (PCC 1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Abutment x x x =
Return Wall x x x =
Floor Under Deck Slab x x x =
11.5 (ii) 600 & 1200 Brick Masonary in C.M.(1:4) in Foundation :-- Brick masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203
Abutment x x x =
Return Wall x x x =
12.1(II) 600 & 1200 Brick Masonary in C.M.(1:4) in Sub Structure :-- Brick masonry work in cement mortar (CM 1:4) in substructure and Kerb complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203
Abutment x x x =
Return Wall x x x =
12.5 II Plain/reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
Abutment Cap x x x =
Dirt Wall x x x =
Return Wall Coping x x x =
TEC Providing Bitumen painting over top surface of Abutment cap & inner vertical surface of Dirt Wall including Heating the bitumen & cost of painting brush etc. all complete.
Abutment Cap x x =
Dirt Wall x x =
13.1 Providing RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5
11.4 (iii) 800 & 1200 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Main Bars 2 x 2 x = RM
Stirrups x x = RM
Vertical Bars x x x = RM
Horizontal Bars x x x = RM
Return Wall Coping
Long Bars x x = RM
Cross Bars x x = RM
16 mm Tor Steel
Main Bars Bottom ( Crank at one End) 1 x x = RM
10 mm Tor Steel
Distribution Bars 1 x x = RM
Top Long Bars 1 x x = RM
Top Cross Bars 1 x x = RM
Top Extra Bar 1 x x = RM
Total 8 mm Tor Steel RM @ 0.4 Kg/M =
Total 10 mm Tor Steel RM @ 0.62 Kg/M =
Total 16 mm Tor Steel RM @ 1.58 Kg/M =
Add 2% for Laps & Wastage =
Total in Kg = Kg
Total in MT / 1000 = MT
RCD SOR 14.18 (iv) Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight
13.9 Brick masonry work in cement mortar 1:3 in parrapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4
12.3 (i)A 600 Plastering with cement mortar (1:4) :-- Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications
Abutment Sides x 2 x x =
Abutment Inner Sides x x =
Return Wall (Front Faces) x x =
Return Wall (Side Faces) Below Abt.Cap x x =
Return Wall (Side Faces) Above Abt.Cap x x =
Parrapet Wall (Sides) x x =
Parrapet Wall (Top) x x =
Parrapet Wall (Ends) x x =
Total Plastering = sqm
Building 13.26 Providing 1.5 mm thick neat cement punning .
Parrapet Wall (Sides) x =
Parrapet Wall (Top) x x =
Parrapet Wall (Ends) x x =
Total Punning Area = sqm
11 Providing 75 mm RCC wearing Coat :-- Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Total Qty of Wearing Coat
12.9 Providing weep holes in abutement :-- Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing
Total cost for 1 no. SLAB CULVERT Size ( 3 m x 2 m) = Rs.
Cost of 0\ "No" SLAB CULVERT Size ( 3 m x 2 m) Rs. =
Junior Engineer Asstt. Engineer Executive Engineer
NAGAR PARISAD BANKA
District :-- Banka
Estimated Cost :-
okMZ la0&12 esa fiadh nsoh ds ?kj ls lqfer jatu ds ?kj rd vkj0lh0lh0 ukyk dk fuekZ.k dk;ZA
junior Engineer
N.P.BANKA N.P.BANKA
NIT NO- GROUP NO-
BILL OF QUANTITIES (BOQ)
BOQ of वार्ड संख्या-17 में सूरज झा के घर से रत्नेश्वर सिंह के घर तक रोड एवं नाला तथा डी.फ.ओ. से बिट्टू किराना दुकान तक पथ का निर्माण कार्य|
Length of drain :- Mtr
BOQ Amount :- Rs
Time of Completion :- Rs
Earnest Money :- Rs
Cost of BOQ :- Rs
Date of Tender :-
Sl. No. SOR Item No. S.O.R Item of Work Qty. Unit Rate (Rs) Amount (Rs)
1 2.8.1 Excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sq.m on plan including dressing of sides and ramming of bottoms lift upto 1,5m, including getting cut the excavated soil and disposal of surplus excavated soiis as directed, within a lead of 50 m m3
2 2.2.1-(2.4+2.5) Earth work in rough excavation,banking excavated earth in layer not exceeding 20 cm in depth, breaking clods watering,rolling each layer with 1/2tonne roller or wooden or steel rammers and rolling every 3rd and top most layer with power roller …do m3
3 2.28 Sand Filling in Foundation :-- Supplying and Filling in plinth with local sand and under floor including watering ,ramming,consolidation and dressing complete.as per specification.........E/I m3
4 11.72 Providing designation 100 A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete asper specification and direction of E/I m2
5 5.1.2 R.C.C:_Providing and laying in position specified grade Reinforced cement concrete work excluding the cost of centring, shuttering, finishing and reinforcement -All work up to Plinth Level. 1:1.5:3 (1 cement:1.5coarse sand :3 graded Stone aggre m3
6 5.22.7 T.M.T Bar:-Reinforcement for R.C.C work includingg straightning, cutting, bending, placing in position and binding all complete. Mild steel Wire Rod KG
7 5.9.2 C/S:-Centering and shutering including struting, propping etc. and removal of form for Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc. m2
8 16.42 Providingand layinginpositioncement concreteof specifiedgrade exluding the cost of centring and shuttering-all work upto plinth level.1:2:4(1Cement: 2coarse sand :4gradedstoneaggregate20mm nominal size) m3
9 Carriage of materials
(a) Bricks (1K+7P)KM Nos
(b) Local Sand (1K+2P)KM cum
© Coarse Sand cum
(d) Stone Chipps cum
10 Different cost of materials
fly ash Bricks th
(b) Local Sand cum
© Coarse Sand cum
(d) Stone Chipps cum
12 Add Increase in GST rate of work contractor (12% _ 18%). as per lt.no:-158/SE(TAS)/GST/2022/331.fg date-10/08/2022
13 P / V sign board for yozna details and photography….do..E/I 1
योजना का नाम- वार्ड संख्या-17 में सूरज झा के घर से रत्नेश्वर सिंह के घर तक रोड एवं नाला तथा डी.फ.ओ. से बिट्टू किराना दुकान तक पथ का निर्माण कार्य|
Distrrict:- BANKA
Length of Earthen Surface Ch:- 0.00 m to Ch:- 121.00 m 140
Total Length of Flexible Pavement Road:-- Ch:- 0.00 m to Ch:- 1375.00 m & Ch:- 1550.00 m to Ch:- 2425.00 m 0
Sl No SOR Item No. Description No Length Width Height / Thickness Quantity Unit Total Quantity Rate (Rs) Amount ( Rs)
1 2.8.1 Excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sq.m on plan including dressing of sides and ramming of bottoms lift upto 1,5m, including getting cut the excavated soil and disposal of surplus excavated soiis as directed, within a lead of 50 m.
2 2.2.1-(2.4+2.5) Earth work in rough excavation , banking excavated earth in layer not exceeding 20 cm in depth , breaking clods watering , rolling each layer with 1/2 tonne roller or wooden or steel rammers and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks , marginal banks and guide banks or filling up ground depressions. lead upto 50 m and lift upto 1.5 m.
3 2.28 Sand Filling in Foundation :-- Supplying and Filling in plinth with local sand and under floor including watering ,ramming,consolidation and dressing complete.as per specification.........E/I
4 Providing designation 100 A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete asper specification and direction of E/I
5 5.1.2 R.C.C:_Providing and laying in position specified grade Reinforced cement concrete work excluding the cost of centring, shuttering, finishing and reinforcement -All work up to Plinth Level. 1:1.5:3 (1 cement:1.5coarse sand :3 graded Stone aggre
6 5.22.7 T.M.T Bar:-Reinforcement for R.C.C work includingg straightning, cutting, bending, placing in position and binding all complete. Mild steel Wire Rod
7 5.9.2 C/S:-Centering and shutering including struting, propping etc. and removal of form for Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc.
8 16.42 Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.
9 Carriage of materials
(a) Bricks (1K+7P)KM 0 936.04
(c) Local Sand (1K+2P)KM cum 0.999
(d) Coarse Sand cum 414.75
(e) Stone Chipps cum 2623.46
(f) Soil cum 313.82
10 Different cost of materials
(i) Bricks Nos 421.25
(ii) cement Mt 670.29
11 Add Seigniorage fee
(b) Local Sand cum 14.185
(c) Coarse Sand cum
(d) Stone Chipps cum
12 Add Increase in GST rate of work contractor (12% _ 18%)@5.36% Rs.
13 P / V sign board for yozna details and photography….do..E/I Nos 1
Junior Engineer
NAGAR PARISAD BANKA
carriage of materials
Block :- N.P.BANKA
District:- BANKA
Sl.No. Materials Source Surfaced Road Lead Kutcha Road Lead Cost of Loading & Unloading Unit Per Trip Truck Capacity By Weight Per Trip Truck Capacity Multiplying Factor Per TripTruck Capacity (Net Payable Volume)
1 Stone Boulder Karjara 48 103.85 Cu m 8 MT 6 cum 0.8 cum
2 Stone Metal Gr.- I Karjara 0 Cu m 8 MT 5 cum 0.85 cum
1 Stone Metal Gr.-II Karjara 65 103.85 Cu m 8 MT 5.4 cum 0.85 cum
2 GSB Materials/ Stone Chips/ Aggregate /Gr-III Karjara 0 Cu m 8 MT 5.4 cum 0.000 cum
1 Stone Chips / Aggregate Mirjachauki 150 192.9 Cu m 8 MT 5.4 cum 0.000 cum
Coarse Sand Chanan 10 Cu m 8 MT 5.4 cum 0.000 cum
Moorrum Majhway 45 Cu m 8 MT 6 cum 1 cum
Local Sand Local 2 Cu m 8 MT 5.4 cum 0.000 cum
Bricks Local 7 %0 Nos 8 MT 2000 Nos 1 Nos
Cement Local 6 278 M T 8 MT 8 M T 1 M T
Steel Local 6 M T 8 MT 8 M T 1 M T
Bitumen Emulsion Ulberia 563 195.09 M T 8 MT 8 M T 1 M T
Bitumen Barauni 181 M T 8 MT 8 M T 1 M T
Hume Pipe (1000 mm Dia) Rajauli 30 126.56 R M 8 MT 10 R M 1 R M
Hume Pipe (600 mm Dia) Rajauli 0 54.24 R M 8 MT 25 R M 1 R M
Hume Pipe (300 mm Dia) Rajauli 0 R M 8 MT 60 R M 1 R M
ANALYSIS OF RATE FOR CARRIAGE OF MATERIALS FROM SOURCE TO WORK SITE BY RAIL & BY ROAD
Haulage Rate Excluding Cost of Loading, Unloading & Stacking Unit : - Tonne.KM
I Surfaced Road 9.4
II Kutcha Road 22.8
Sl.No. Materials Haulage Cost Cost of Loading & Unloading Carriage Cost By Rail Total cost Total Carriage Cost With cess 1% and GST 2%
Surfaced Kutcha
Stone Boulder / x x = / x x = 0 R 855.85
Stone Metal Gr.- I / x x = / x x = 0 R
Stone Metal Gr.-II / x x = / x x = 121 R 1,185.92
GSB Materials/ Stone Chips/ Aggregate /Gr-III / x x = / x x = 0 R 1,100.64
Stone Chips / Aggregate / x x = / x x = 0 RS 2,453.60
Coarse Sand / x x = / x x = 0 RS 380.17
Moorrum / x x = / x x = 0 RS 756.90
Local Sand / x x = / x x = 0 RS 259.60
Cement / x x = / x x = 0 RS 334.40
Steel / x x = / x x = 0 RS 334.40
8 Bitumen Emulsion / x x = / x x = 0 R 5,487.29
9 Bitumen / x x = / x x = 0 R 1,896.49
Hume Pipe (1000 mm Dia) / x x = / x x = 0 R 352.16
Hume Pipe (600 mm Dia) / x x = / x x = 0 R 144.48
Hume Pipe (300 mm Dia) / x x = / x x = 0 R 91.84
Junior Engineer Asstt. Engineer Executive Engineer
Materials Statement
NAGAR PARISAD BANKA
Sl No Item No Name of the Item Qty. Cement Coarse Sand Stone chips Bricks Local Sand Steel soil paver
1 Sand filling m3
Brick edge soling 0 m2
4 Brick flat soling m2
5 paver block 0 m2
11 40 mm th. I.P.S m2 0
m3 m3 m3 Nos. m3 Mt m3 nos
Junior Engineer Asstt. Engineer Executive Engineer
NAGAR PARISHAD BANKA
Name of Project BOQ of वार्ड संख्या-17 में सूरज झा के घर से रत्नेश्वर सिंह के घर तक रोड एवं नाला तथा डी.फ.ओ. से बिट्टू किराना दुकान तक पथ का निर्माण कार्य| CONSTRUCTION OF PCC ROAD IN MOCHANAVARAN ADIVASI TOLA.
Length of the drain M
NAGAR PARISAD BANKA Length of Earthen Surface Ch:- 0.00 m to Ch:- 118.00 m
This estimate amounting to Rs.4889743.00 has been made to meet the cost of construction of drain in ward no -25, provision for construction of drain only in252 MTR (Size 1.2mtr X )1.2 mtr. There is provision of earth work,sand filling, brick on Flat soling,and R.C.C work . The rate of items have been adopted from SOR of BCD. analysis of rates have been made for applicable item of SOR on prevailing labour and materials rate for bhagalpur division. The expenditure of this estimate will be charded under.......................................................... MTR
Junior Engineer
6 Design of Road Crust:
Provisions in DPR have been made for road crust as per pavement design and actual CBR value being 4% and L/S & C/S prepared on the basis of Levelling Survey .
Urban Devlopment And Housing Department
Nagar Parishad Banka
Estimated Cost :- Rs.
BOQ of वार्ड संख्या-17 में सूरज झा के घर से रत्नेश्वर सिंह के घर तक रोड एवं नाला तथा डी.फ.ओ. से बिट्टू किराना दुकान तक पथ का निर्माण कार्य|
Executive Engineer
Bhagalpur (ULB)
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT No-19.pdf
NIT • 4.64 MB
NIT No-19.pdf
NIT • 4.64 MB
38.xls
NIT • 0.29 MB
C1 38.xls
Corrigendum • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .