| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.5 LAccepted-AOC 150 1ST STREET THOTTILPATHY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹24.5 L Quoted ₹22.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹23.3 LRejected-AOC M 36 HOUSING UNIT MATHAIYANKUTTAI PO METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹23.3 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SATHISH ENGINEERING L1 | MARSSAL ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for buffing of metal surface for thickness survey of the Bunker plate. | 200 | mtrs | 430 ₹86,000 | 440 ₹88,000 |
| 2.00 | Charges for providing assistance in thickness survey | 2,000 | points | 20 ₹40,000 | 25 ₹50,000 |
| 3.00 | Charges for conducting thickness survey and hire charges for ultrasonic thickness gauge. | 3,000 | points | 6 ₹18,000 | 10 ₹30,000 |
| 4.00 | Charges for providing required scaffolding arrangements and temporary platform on both sides, inside the bunkers at the elevation of 19 EL to 30 EL and dismantling the same after completion of work including charges for T & Ps, hire charges for scaffolding, temporary platform and cost of consumables etc., | 2 | Nos | 38,000 ₹76,000 | 40,000 ₹80,000 |
| 5.00 | Charges for cutting and removing the existing worn out portion of bunker / bunker wall support beams ,M.S plates and devolution to stores as scrap including cost of cutting gas, T & Ps, hire charges and transporting charges etc | 2 | Tons | 37,000 ₹74,000 | 40,000 ₹80,000 |
| 6.00 | Charges for material & transportation of required sizes of beams and M.S plate, fabrication and erection of the partition of bunker walls, inside the bunker including charges for transporting cost of consumables like cutting gas, welding electrodes and hire charges for T & Ps etc | 10 | Tons | 97,500 ₹9.8 L | 99,000 ₹9.9 L |
| 7.00 | Labour charges for welding eroded initial welding joints in the Bunker walls above 2 metre | 540 | mtrs | 200 ₹1.1 L | 250 ₹1.4 L |
| 8.00 | Cost of materials (Contractors Scope) 12/ 16/20 mm Thick MS Plate | 9 | Tons | 72,000 ₹6.5 L | 75,000 ₹6.8 L |
| 9.00 | Cost of materials (Contractors Scope) I Beam/ channels / Angles of various sizes | 2,000 | Kg | 60 ₹1.2 L | 70 ₹1.4 L |
| 10.00 | Cost of welding electrodes for running metre | 107 | Kg | 500 ₹53,500 | 590 ₹63,130 |
Tender Value
Refer Docs
EMD Value
₹22,800
Closing Date
14 Apr 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit III Removal of worn out thinned out wall plates of bunkers 3E 3F and erection of new wall plates of 12 16 mm thick MS plates and supporting beams and other related works
2025_EB_536584_1
CE / MTPS-I / SE / M-I / MP /OT.321/ 2024-25
Open Tender
Power/Energy Projects/Products
30 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹22,800
Yes
22 May 2026
31 Mar 2025
15 Apr 2025
31 Mar 2025
14 Apr 2025
31 Mar 2025
Amount
Charges for buffing of metal surface for thickness survey of the Bunker plate.
Charges for providing assistance in thickness survey
Charges for conducting thickness survey and hire charges for ultrasonic thickness gauge.
Charges for providing required scaffolding arrangements and temporary platform on both sides, inside the bunkers at the elevation of 19 EL to 30 EL and dismantling the same after completion of work including charges for T & Ps, hire charges for scaffolding, temporary platform and cost of consumables etc.,
Charges for cutting and removing the existing worn out portion of bunker / bunker wall support beams ,M.S plates and devolution to stores as scrap including cost of cutting gas, T & Ps, hire charges and transporting charges etc
Charges for material & transportation of required sizes of beams and M.S plate, fabrication and erection of the partition of bunker walls, inside the bunker including charges for transporting cost of consumables like cutting gas, welding electrodes and hire charges for T & Ps etc
Labour charges for welding eroded initial welding joints in the Bunker walls above 2 metre
Cost of materials (Contractors Scope) 12/ 16/20 mm Thick MS Plate
Cost of materials (Contractors Scope) I Beam/ channels / Angles of various sizes
Cost of welding electrodes for running metre
MARSSAL ENTERPRISES (BID ID -1286516)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_638593.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid