| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC | ₹4.1 Cr Quoted ₹3.5 Cr | L1 | Accepted-AOC As L1 |
| 2 | L2₹3.6 CrRejected-Finance AT LANGALKATA PO SUREIDIHJ DIST MAYURBHANJ PIN 757029 | MAYURBHANJ | ODISHA | 757029 | ₹3.6 Cr | L2 | Rejected-Finance As L2 |
| 3 | L3₹3.6 CrRejected-Finance AT ANDOLA P O SRIDHARPUR PS JAJPUR TOWN DIST JAJPUR ODISHA 755062 | JAJAPUR | ODISHA | 755062 | ₹3.6 Cr | L3 | Rejected-Finance As L3 |
Tender Value
₹3.5 Cr
EMD Value
₹3.5 L
Closing Date
6 Feb 2026, 5:00 pmClosed
Executive Officer,Baripada Municipality
Executive Officer,Baripada Municipality
Water Logging Vulnerable pockets and drainage network.of Udla road and Bagichasahi
2026_ORULB_124756_2
BPDM 3/2026-2027
Open Tender
Civil Works - Others
180 days
Baripada Municipality
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹3.5 L
Yes
Conference Hall of the Baripada Municipality
6 May 2026
19 Jan 2026
7 Feb 2026
19 Jan 2026
6 Feb 2026
19 Jan 2026
21 Jan 2026
Outfall Udala Road and Bagichasahi Secondary Network
Dismantling brick or stone masonry in lime or cement mortar above 3m. Height including stacking the usefull materials for reuse and removing the debris within 50m. lead per 1cum
Dismantling and removing R.C.C columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead
Earth work in excavation of foundation in slushy soil (in water upto 0.6m. Depth requiring the aid of pans and vessels) up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in in excavation of foundation in slushy soil (in water upto 0.6m. Depth requiring the aid of pans and vessels) up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) (i) With initial lead of 50m and Lift of 1.5m
Earth work in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in excavation of foundation in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in excavation of foundation in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Excavaion of foundation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Excavaion of founation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Supplying and filling in foundation and plinth with sand including watering, ramming, including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-In-Charge.
Plain Cement concrete (1:3:6) in foundation and plinth, road pavement and flooring using 4 cm. size hard granite crusher broken metal of approved quarry and approved quality including hoisting lowering laying compacting concrete in layers not exceeding 0.15 M. in depth watering and curing etc, complete including cost, conveyance, royalties & taxes of all materials and labour etc with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
RCC work with M-25 mix in foundation Raft using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Wall up to 1.5 m depth using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Slab using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
Cutting straightening coiled or bent up HYSD Bars/High tensile tor bars and tor steels, bending binding welding and jointing if necessary and tying the grills and placing in position as required for RCC work and for providing fan hooks hoisting lowering and laying including cost, conveyance and taxes of HYSD bars/High tensile tor bars & tor steels and binding wires of 18 to 20 gauge and labour required for the work for bending binding and tying the grills in all floors etc.complete as per direction of the E.I.C(Measurement will be taken excluding cost of binding wire).
K.B. Brick masonry using K.B .Bricks having crushing strength not less than 75 kgs./cm2 in cement mortar (1:4) after immersing the bricks for six hours in water before use in Foundation & Plinth including splays cutting, circular moulding corbelling, champhering and similar such type of works watering and curing etc .including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
12mm.thick cement plaster (1:6) finished smooth over brick / stone masonry walls after racking out the joints including watering and curing with cost, conveyance, royalties and taxes of all materials and cost of labour with T&P required for the work etc. complete as per direction of the E.I.C.
Dewatering the excavated trenches and pools of water in the building trenches/ pipeline trenches, well works by using pumps and otherdevices including disposing off water to safe distance as directed by Engineer-in Charge (including cost of machinery, labour, fuel) etc. complete
Filling in foundation and plinth with excavated earth including laying in layers not exceeding 23cm. (9”) thick well-watered & rammed including all labour T&P etc. complete as per specification and direction of the Engineer-in-charge.
Disposal of surplus excavated earth by mechanical means &unloading in low land areas for filling and alignment of new roads etc. complete with cost of all labour, T&P & hire and running charges of Truck etc. complete in all respect as directed by the Engineer-in-charge.
Providing and laying weep holes with 100mm diameter PVC pipes as per drawing for abutment , return walls using PVC Plastic pipes of schedule 40,80 & 120 as per ASTM-D-1785/2004 etc. complete with cost of all labour, T&P & hire and running charges of Truck as directed by the Engineer-in-charge.
Construction of Inspection chamber for secondary and tertiary network including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
Restoration of the road using plain cement concrete of required proportion including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
Outfall Udala Road and Bagichasahi Secondary Improvement Network
Dismantling brick or stone masonry in lime or cement mortar including stacking the usefull materials for reuse and removing the debris from the site etc complete in all respect as per direction of the EIC
Dismantling and removing R.C.C columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris from the site etc complete in all respect as per direction of the EIC
Earth work in excavation of foundation in slushy soil (in water upto 0.6m. Depth requiring the aid of pans and vessels) up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in in excavation of foundation in slushy soil (in water upto 0.6m. Depth requiring the aid of pans and vessels) up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) (i) With initial lead of 50m and Lift of 1.5m
Earth work in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in excavation of foundation in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in excavation of foundation in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Excavaion of foundation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T & P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Excavaion of founation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Supplying and filling in foundation and plinth with sand including watering, ramming, including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-In-Charge.
Plain Cement concrete (1:3:6) in foundation and plinth, road pavement and flooring using 4 cm. size hard granite crusher broken metal of approved quarry and approved quality including hoisting lowering laying compacting concrete in layers not exceeding 0.15 M. in depth watering and curing etc, complete including cost, conveyance, royalties & taxes of all materials and labour etc with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
RCC work with M-25 mix in foundation Raft using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Wall up to 1.5 m depth using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Wall below 1.5 m depth using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Slab using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
Cutting straightening coiled or bent up HYSD Bars/High tensile tor bars and tor steels, bending binding welding and jointing if necessary and tying the grills and placing in position as required for RCC work and for providing fan hooks hoisting lowering and laying including cost, conveyance and taxes of HYSD bars/High tensile tor bars & tor steels and binding wires of 18 to 20 gauge and labour required for the work for bending binding and tying the grills in all floors etc.complete as per direction of the E.I.C(Measurement will be taken excluding cost of binding wire).
K.B. Brick masonry using K.B .Bricks having crushing strength not less than 75 kgs./cm2 in cement mortar (1:4) after immersing the bricks for six hours in water before use in Foundation & Plinth including splays cutting, circular moulding corbelling, champhering and similar such type of works watering and curing etc .including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
12mm.thick cement plaster (1:4) finished smooth over brick / stone masonry walls after racking out the joints including watering and curing with cost, conveyance, royalties and taxes of all materials and cost of labour with T&P required for the work etc. complete as per direction of the E.I.C.
Dewatering the excavated trenches and pools of water in the building trenches/ pipeline trenches, well works by using pumps and otherdevices including disposing off water to safe distance as directed by Engineer-in Charge (including cost of machinery, labour, fuel) etc. complete
Filling in foundation and plinth with excavated earth including laying in layers not exceeding 23cm. (9”) thick well-watered & rammed including all labour T&P etc. complete as per specification and direction of the Engineer-in-charge.
Disposal of surplus excavated earth by mechanical means &unloading in low land areas for filling and alignment of new roads etc. complete with cost of all labour, T&P & hire and running charges of Truck etc. complete in all respect as directed by the Engineer-in-charge.
Providing and laying weep holes with 100mm diameter PVC pipes as per drawing for abutment , return walls using PVC Plastic pipes of schedule 40,80 & 120 as per ASTM-D-1785/2004 etc. complete with cost of all labour, T&P & hire and running charges of Truck as directed by the Engineer-in-charge.
Construction of Inspection chamber for secondary and tertiary network including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
Restoration of the road using plain cement concrete of required proportion including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
Outfall Udala Road and Bagichasahi Tertiary Network
Dismantling brick or stone masonry in lime or cement mortar including stacking the usefull materials for reuse and removing the debris from the site etc complete in all respect as per direction of the EIC
Dismantling and removing R.C.C columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris from the site etc complete in all respect as per direction of the EIC
Earth work in excavation of foundation in slushy soil (in water upto 0.6m. Depth requiring the aid of pans and vessels) up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) (i) With initial lead of 50m and Lift of 1.5m
Earth work in excavation of foundation in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Excavaion of foundation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Supplying and filling in foundation and plinth with sand including watering, ramming, including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-In-Charge.
Plain Cement concrete (1:3:6) in foundation and plinth, road pavement and flooring using 4 cm. size hard granite crusher broken metal of approved quarry and approved quality including hoisting lowering laying compacting concrete in layers not exceeding 0.15 M. in depth watering and curing etc, complete including cost, conveyance, royalties & taxes of all materials and labour etc with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
RCC work with M-25 mix in foundation Raft using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Wall up to 1.5 m depth using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Slab using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
Cutting straightening coiled or bent up HYSD Bars/High tensile tor bars and tor steels, bending binding welding and jointing if necessary and tying the grills and placing in position as required for RCC work and for providing fan hooks hoisting lowering and laying including cost, conveyance and taxes of HYSD bars/High tensile tor bars & tor steels and binding wires of 18 to 20 gauge and labour required for the work for bending binding and tying the grills in all floors etc.complete as per direction of the E.I.C(Measurement will be taken excluding cost of binding wire).
K.B. Brick masonry using K.B .Bricks having crushing strength not less than 75 kgs./cm2 in cement mortar (1:4) after immersing the bricks for six hours in water before use in Foundation & Plinth including splays cutting, circular moulding corbelling, champhering and similar such type of works watering and curing etc .including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
12mm.thick cement plaster (1:4) finished smooth over brick / stone masonry walls after racking out the joints including watering and curing with cost, conveyance, royalties and taxes of all materials and cost of labour with T&P required for the work etc. complete as per direction of the E.I.C.
Dewatering the excavated trenches and pools of water in the building trenches/ pipeline trenches, well works by using pumps and otherdevices including disposing off water to safe distance as directed by Engineer-in Charge (including cost of machinery, labour, fuel) etc. complete
Filling in foundation and plinth with excavated earth including laying in layers not exceeding 23cm. (9”) thick well-watered & rammed including all labour T&P etc. complete as per specification and direction of the Engineer-in-charge.
Disposal of surplus excavated earth by mechanical means &unloading in low land areas for filling and alignment of new roads etc. complete with cost of all labour, T&P & hire and running charges of Truck etc. complete in all respect as directed by the Engineer-in-charge.
Providing and laying weep holes with 100mm diameter PVC pipes as per drawing for abutment , return walls using PVC Plastic pipes of schedule 40,80 & 120 as per ASTM-D-1785/2004 etc. complete with cost of all labour, T&P & hire and running charges of Truck as directed by the Engineer-in-charge.
Construction of Inspection chamber for secondary and tertiary network including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
Restoration of the road using plain cement concrete of required proportion including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
Outfall Udala Road and Bagichasahi Tertiary Improvement Network
Dismantling brick or stone masonry in lime or cement mortar including stacking the usefull materials for reuse and removing the debris from the site etc complete in all respect as per direction of the EIC
Dismantling and removing R.C.C columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris from the site etc complete in all respect as per direction of the EIC
Earth work in excavation of foundation in slushy soil (in water upto 0.6m. Depth requiring the aid of pans and vessels) up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in excavation of foundation in slushy soil (in water upto 0.6m. Depth requiring the aid of pans and vessels) up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) (i) With initial lead of 50m and Lift of 1.5m
Earth work in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge alongwith proper compaction with H.R.R. (section measurement to be taken on the finished compacted section of the fill) (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in excavation of foundation in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in excavation of foundation in hard soil or gravelly soil in embankment, roads etc. up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Excavaion of foundation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (i) With initial lead of 50m and Lift of 1.5m
Excavaion of foundation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site , T&P labour required for the work etc. complete as directed by the Engineer-In Charge. (ii) With initial lead of 50m and extra lift of 1.5m (up to 3.0 m)
Supplying and filling in foundation and plinth with sand including watering, ramming, including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per direction of Engineer-In-Charge.
Plain Cement concrete (1:3:6) in foundation and plinth, road pavement and flooring using 4 cm. size hard granite crusher broken metal of approved quarry and approved quality including hoisting lowering laying compacting concrete in layers not exceeding 0.15 M. in depth watering and curing etc, complete including cost, conveyance, royalties & taxes of all materials and labour etc with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
RCC work with M-25 mix in foundation Raft using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Wall up to 1.5 m depth using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
RCC work with M-25 mix in Slab using 12mm.to 20mm. size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compact concrete by using vibrator, watering and curing for 28 days, centering shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance ,royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete in all respect as per specification & direction of E.I.C.
Cutting straightening coiled or bent up HYSD Bars/High tensile tor bars and tor steels, bending binding welding and jointing if necessary and tying the grills and placing in position as required for RCC work and for providing fan hooks hoisting lowering and laying including cost, conveyance and taxes of HYSD bars/High tensile tor bars & tor steels and binding wires of 18 to 20 gauge and labour required for the work for bending binding and tying the grills in all floors etc.complete as per direction of the E.I.C(Measurement will be taken excluding cost of binding wire).
K.B. Brick masonry using K.B .Bricks having crushing strength not less than 75 kgs./cm2 in cement mortar (1:4) after immersing the bricks for six hours in water before use in Foundation & Plinth including splays cutting, circular moulding corbelling, champhering and similar such type of works watering and curing etc .including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
12mm.thick cement plaster (1:4) finished smooth over brick / stone masonry walls after racking out the joints including watering and curing with cost, conveyance, royalties and taxes of all materials and cost of labour with T&P required for the work etc. complete as per direction of the E.I.C.
Dewatering the excavated trenches and pools of water in the building trenches/ pipeline trenches, well works by using pumps and otherdevices including disposing off water to safe distance as directed by Engineer-in Charge (including cost of machinery, labour, fuel) etc. complete
Filling in foundation and plinth with excavated earth including laying in layers not exceeding 23cm. (9”) thick well-watered & rammed including all labour T&P etc. complete as per specification and direction of the Engineer-in-charge.
Disposal of surplus excavated earth by mechanical means &unloading in low land areas for filling and alignment of new roads etc. complete with cost of all labour, T&P & hire and running charges of Truck etc. complete in all respect as directed by the Engineer-in-charge.
Providing and laying weep holes with 100mm diameter PVC pipes as per drawing for abutment , return walls using PVC Plastic pipes of schedule 40,80 & 120 as per ASTM-D-1785/2004 etc. complete with cost of all labour, T&P & hire and running charges of Truck as directed by the Engineer-in-charge.
Construction of Inspection chamber for secondary and tertiary network including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
Restoration of the road using plain cement concrete of required proportion including cost, conveyance, royalties and taxes & testing of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-In-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.75 MB
BOQ_576403.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid