Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-Finance BHARSALA PARA NABAPALLY P O P S RAMPURHAT DIST BIRBHUM WB PIN 731224 | RAMPURHAT | BIRBHUM | WEST BENGAL | 731224 | L1 | Accepted-Finance L1 | |
| 2 | L2₹3.1 Cr+₹42.6 L (15.8%)Rejected-Finance | L2 | Rejected-Finance Bid is not L1 | |
| 3 | L3₹3.1 Cr+₹46.3 L (17.2%)Rejected-Finance | L3 | Rejected-Finance Bid is not L1 | |
| 4 | L4₹3.3 Cr+₹57.0 L (21.2%)Rejected-Finance N A | NA | NA | 121004 | L4 | Rejected-Finance Bid is not L1 |
Tender Value
₹2.8 Cr
EMD Value
₹5.7 L
Closing Date
6 Mar 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr. SE_NHC
Sr. Superintending Engineer, Northern Highway Circle, P.W.(Roads)Directorate, Singatala, Malda, Pin- 732101.
Recovery and restoration work of Sadullapur Meharapur Road from 0.00 Km to 10.08 Km under Malda Highway Division in the district of Malda for mending up damages occurred due to heavy rainfall / flood like situation (2nd Call).
2026_SH_997905_1
WBPW(ROADS)/Sr. SE/ NHC /NIT-05 /2025-2026
Open Tender
CIVIL WORKS
Percentage
180 days
Malda
Please refer Tender documents.
5 documents required · 5 mandatory
₹5.7 L
Yes
Office of the Sr. Superintending Engineer, NHC
1 Apr 2026
7 Feb 2026
9 Mar 2026
7 Feb 2026
6 Mar 2026
11 Feb 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1FLEXIBLE PAVEMENT | |||||
| 1.01 | Patching of potholes by draining water, cutting the pothole area to rectangular shape with vertical edges, removing all loose materials, screening and stacking the same for reuse with new materials as per requirement, filling the pothole area with additional volume of crushed stone materials / laterite / Jhama / broken shingles / coated stones of Pakur variety etc. and screenings as applicable, and compacting the same with static roller as per Water Bound Macadam Specification, including cost of all materials and machineries.
Using Grading-2 Pakur Variety Stone Aggregates (53mm to 22.4mm) & Type-B Stone Screening (11.20mm). | 59.72 | Cum. | 1,892.3 | ₹1,13,008.16 |
| 1.02 | Repairing pot-holes and making up small depressions with ramming or power rolling including screening, cleaning chips or metals and washing, drying as necessary and eating the chips or metal where necessary, cutting pot holes to regular shapes with vertical edges, cleaning the disintegrated materials, heating matrix and applying tack coat ( including sides), finishing the top of repaired surface levelled with adjoining area, including cost and carriage of stone aggregates and matrix, excluding cost of applying tack coat.
With premixed Pakur variety stone aggregates with 54 kg of bitumen (VG-30) per m3 of loose net volume of stone chips using Mobile HMP (Light Duty)
( The payment is to be made on the basis of loose net volume of stone materials consumed in the work) | 53.08 | Cum. | 3,759.48 | ₹1,99,553.2 |
| 1.03 | Providing and laying Bituminous Profile Corrective Course using Mobile Hot Mix Plant (Light Duty) and using Pakur variety aggregates of Grading-2 of Table-33 premixed with 75kg of bitumen (VG-30) per cum, transported to site laid over a previously prepared surface at specified laying temperature to the required grade, level and alignment, as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per direction of Engineer-in charge.
Using Pakur variety stone aggregates.
(Payment is to be made on finished Compacted Volume). | 271.7 | Cum. | 5,542.66 | ₹15,05,940.72 |
| 1.04 | Providing and applying primer coat with SS-1 grade Cationic Bitumen Emulsion (PACKED) of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
over WBM / WMM Surface @ 0.85kg/sqm) | 796.25 | sqm | 33.7 | ₹26,833.63 |
| 1.05 | Providing and applying tack coat with RS-1 grade Cationic Bitumen Emulsion (PACKED) of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
On Bituminous Surface to be treated with primer @ 0.250 kg per sqm.] | 60,495.89 | sqm | 9.62 | ₹5,81,970.46 |
| 1.06 | Providing and applying tack coat with RS-1 grade Cationic Bitumen Emulsion (PACKED) of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
On Granular surfaces to be treated with primer @ 0.275 kg per sqm.) | 796.25 | sqm | 10.45 | ₹8,320.81 |
| 1.07 | Providing & laying Semi-dense Bituminous Concrete (SDBC) as wearing coarse by Hot Mix Plant, using Pakur Variety coarse aggregates, fine aggregates, filler materials and binder (VG-30) of required specification and grading as per approved job mix formula, over thoroughly cleaned surface coated with tack coat, including screening, cleaning of aggregates, mixing the components as per approved Job Mix Formula with hot binder, carrying the mixture by tipper truck or any other approved suitable arrangements, laying the mixture uniformly, maintaining the specified laying temperature, thorough rolling with power roller with necessary hand packing and pinning to give an uniform surface to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, including the cost and carriage of aggregates, filler and binder, heating the binder, preheating the aggregates, and filler to the specified temperature, including the hire charges of Hot Mix Plant and other machineries, pay of operators, cost of fuel and lubricants and all other incidental charges complete.
For Grading 1 (13mm nominal size, 40mm compacted thick )
Using Drum mix Type HMP of minimum capacity 60-90 TPH.
Using Pakur variety stone aggregates. | 2,535.59 | Cum. | 6,255.41 | ₹1,58,61,173.81 |
| 2ROAD FURNITURE WORKS | |||||
| 2.01 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per Clause 803 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 2,682.13 | sqm | 584 | ₹15,66,365.67 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_2443408.xls
BOQ • 0.32 MB
twonineoneone.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .