| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.7 LAccepted-Finance NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | L1 | Accepted-Finance Accepted | |
| 2 | L2₹47.8 L+₹2.1 L (4.57%)Accepted-Finance | L2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | A.R.C.ENGINEERING L1 | S.MATHURAM CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for reconnection of power and control cables, setting of open/close limit/torque switches, testing of modules, motors and checking of operation as instructed by the the maintenance engineer incharge. (valve actuators) | 120 | Opns | 2,316 ₹3,27,945.6 Lowest | 2,421 ₹3,42,813.6 |
| 2.00 | Charges for replacement of limit switch assembly and actuator terminal blocks as instructed by the the maintenance engineer incharge. | 10 | Opns | 3,768 ₹44,462.4 Lowest | 3,939 ₹46,480.2 |
| 3.00 | Charges for power/control cable jointing works for Motorised actuators of Boiler and Turbine area using standard technique. | 10 | Nos. | 4,904 ₹57,867.2 Lowest | 5,127 ₹60,498.6 |
| 4.00 | Charges for transporting the testing equipment, Cleaning & assisting for conducting the tests on HT Relay panel. | 180 | Opns | 1,059 ₹2,24,931.6 Lowest | 1,107 ₹2,35,126.8 |
| 5.00 | Charges for transporting the testing equipment, Cleaning & assisting for conducting the tests on LT motor location. | 450 | Nos. | 530 ₹2,81,430 Lowest | 554 ₹2,94,174 |
| 6.00 | Charges for transporting the testing equipment, Cleaning & assisting for conducting the tests on LT Relay panel. | 180 | Opns | 1,059 ₹2,24,931.6 Lowest | 1,107 ₹2,35,126.8 |
| 7.00 | Charges for transporting the testing equipment, Cleaning & assisting for conducting the test on Generator Relay Panel testing & GCDP Meter calibration. | 12 | Nos. | 9,536 ₹1,35,029.76 Lowest | 9,969 ₹1,41,161.04 |
| 8.00 | Charges for cleaning, disconnection of control cables, terminal tightness checking of actuator terminal blocks, local push button and lubricating the limit switch mechanism as instructed by the maintenance engineer incharge.(valve actuators) | 120 | Opns | 915 ₹1,29,564 Lowest | 957 ₹1,35,511.2 |
| 9.00 | Checking the control circuit of WWSB’s/LRSB’s/APH’s soot blowers modules for the healthiness & identifying the defective components with trouble shooting of control panel and local junction boxes in all 4 levels of the boiler from 16 Mtr to 34 Mtr levels in wall blowers of all three Units as instructed by our maintenance Engineer. | 700 | Opns | 1,045 ₹8,63,170 Lowest | 1,093 ₹9,02,818 |
| 10.00 | Charges for switching on the module of wall blower switch off the same after completion of operation of wall blowers in switch gear as instructed by our maintenance engineer, with trouble shooting by replacing the control and power fuses in control panels and reeplacing push buttons of local junction boxes in all 4 levels of the boiler from 16 Mtr to 34 Mtr levels in wall blowers all three Units. | 3,000 | Opns | 37 ₹1,30,980 Lowest | 39 ₹1,38,060 |
Tender Value
Refer Docs
EMD Value
₹42,400
Closing Date
15 Sept 2026, 2:00 pmClosed
SE/ES/NCTPS-I
SE/ES/NCTPS-I,Chennai-120
NCTPS I ES Circle MRT Dn SD I II III Works contract for the Routine maintenance of MRT equipments for a period of 360 days for the year 2026 27
2026_EB_699667_1
CE/NCTPS-I/SE/ES/WC-50/2026-27
Open Tender
Power/Energy Projects/Products
Works
360 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹42,400
Yes
3 Oct 2026
31 Aug 2026
16 Sept 2026
31 Aug 2026
15 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for reconnection of power and control cables, setting of open/close limit/torque switches, testing of modules, motors and checking of operation as instructed by the the maintenance engineer incharge. (valve actuators) | 120 | Opns | 2,260.5 | ₹2,71,260 |
| 2 | Charges for replacement of limit switch assembly and actuator terminal blocks as instructed by the the maintenance engineer incharge. | 10 | Opns | 3,678.4 | ₹36,784 |
| 3 | Charges for power/control cable jointing works for Motorised actuators of Boiler and Turbine area using standard technique. | 10 | Nos. | 4,788.3 | ₹47,883 |
| 4 | Charges for transporting the testing equipment, Cleaning & assisting for conducting the tests on HT Relay panel. | 180 | Opns | 1,034.37 | ₹1,86,186.6 |
| 5 | Charges for transporting the testing equipment, Cleaning & assisting for conducting the tests on LT motor location. | 450 | Nos. | 517.18 | ₹2,32,731 |
| 6 | Charges for transporting the testing equipment, Cleaning & assisting for conducting the tests on LT Relay panel. | 180 | Opns | 1,034.37 | ₹1,86,186.6 |
| 7 | Charges for transporting the testing equipment, Cleaning & assisting for conducting the test on Generator Relay Panel testing & GCDP Meter calibration. | 12 | Nos. | 9,309.3 | ₹1,11,711.6 |
| 8 | Charges for cleaning, disconnection of control cables, terminal tightness checking of actuator terminal blocks, local push button and lubricating the limit switch mechanism as instructed by the maintenance engineer incharge.(valve actuators) | 120 | Opns | 893.93 | ₹1,07,271.6 |
| 9 | Checking the control circuit of WWSB’s/LRSB’s/APH’s soot blowers modules for the healthiness & identifying the defective components with trouble shooting of control panel and local junction boxes in all 4 levels of the boiler from 16 Mtr to 34 Mtr levels in wall blowers of all three Units as instructed by our maintenance Engineer. | 700 | Opns | 1,020.25 | ₹7,14,175 |
| 10 | Charges for switching on the module of wall blower switch off the same after completion of operation of wall blowers in switch gear as instructed by our maintenance engineer, with trouble shooting by replacing the control and power fuses in control panels and reeplacing push buttons of local junction boxes in all 4 levels of the boiler from 16 Mtr to 34 Mtr levels in wall blowers all three Units. | 3,000 | Opns | 36.44 | ₹1,09,320 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_841085.xls
BOQ • 0.36 MB
corrigendum.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .