Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance J 38 ASHIANA SHRI RAJ BHAWAN KANPUR ROAD ASHIANA LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
4 Oct 2021, 3:00 pmClosed
Assistant General Manager (CE)
Food Corporation of India, Regional Office, 3rd floor. HACA Bhavan, Nampally, Hyderabad.
Systematic Mainte-nance of Railway Siding at BSC Miryalaguda for the year 2021-22
2021_FCI_649771_1
ENGG/02/2021-22 dtd.23.09.2021
Open Tender
Civil Works
Works
365 days
BSC Miryalaguda
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
29 Oct 2021
24 Sept 2021
5 Oct 2021
24 Sept 2021
4 Oct 2021
24 Sept 2021
Amount
Systematic maintenance of track in railway siding for all items as included in the specification para 3.0 to 3.9
Rectification of damaged track on account of derailment including changing of any no. of rails, points and crossing, sleepers with fittings and fixtures, ballast including aling, correction of cross levels and packing. (The required material will be supplied by FCI at site of work free of cost. After satisfying the terms and conditions of clause 5 of conditions of contract, if any payment is admissible then only the contractor will be entaitled for the same.) Straight/Curved rack
Supply of BG pre-stressed concrete sleepers for 52/60 kg rail as per IR specification and drawing including cost of 4 Nos MTC inserts to site of work. (The rate will be inclusive of inspection charges, trasnpotation, loading, unloading and stacking complete as per the direction of Engineering-in-charge).
Supply of Permanent Way materials (Ist class) for 52 kg rail section of standard size at site as per latest IR specification and drawing.
Pendrol clips (Drg No.T-3701)
Rubber pad (Drg No.T-3703)
M.S./PVC Liner (Drg No.T-3741/3742)
Supplying and stacking of approved quality of stone ballast of 50 mm gauge confirming to technical specification and as per direction of Engg-in-charge.
Spreading out of stone ballast from stacked at different locations, including carriage of ballast with in the depot premises to work spot including loading and unloading the ballast, dressing levelling etc as directed by the Engineering in-charge.
Removing of old/damaged wooden, CI/Steel trough sleepers with fittings and laying of MBC sleepers with fittings & fixture jointing and fastening to specified gauge, alignment, levelling etc complete as per IR specification and as per the direction of Engineering-in-charge.(Required fittings shall be supplied free of cost by Department)
Deduct towards cost of salvage materials received from specific items which shall be issued to contractor and shall be cleared by the contractor from the site of work with all leads and lifts complete as directed by the Engineer in charge as is where is basis : CST/CST-9/ST sleepers
B. RAMANA CONTRACTOR
Kallam Subba Reddy
MAHALAXMI TRADERS
R SANTOSH KUMAR
DeviMaaShakti Constructions and Consultancy Services Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .