Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Fee/PreQual/Technical/Finance | -17.70% | ₹6.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.0 LAdmitted-Fee/PreQual/Technical/Finance | -1.11% | ₹8.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.0 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹8.0 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.1 L
EMD Value
₹16,500
Closing Date
10 Jul 2026, 2:00 pmClosed
AMC CMC CHAS
OFFICE OF AMC CMC CHAS NEAR ITI MORE
CONSTRUCTION OF PCC ROAD FROM HOUSE OF NITYANAND JI TO HOUSE OF JEEVAN JHA AND GARAGE GALI AND NEAR S.S. COLLEGE AT WARD NO - 34 UNDER
2026_UDD_115770_1
UDD/CMC/08/CIVIL/2026-27/34
Open Tender
Civil Works
Percentage
90 days
CHAS
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹16,500
11 Jul 2026
3 Jul 2026
11 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1 | M2 | 0.8 | ₹0.8 |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.Rate per cum for grading - ll material | 1 | M3 | 1 | ₹1 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 0.2 | M3 | 1 | ₹0.2 |
| 4 | Providing centering and shuttering ...do-do-all complete job | 1 | M2 | - | - |
| 5 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to
meet requirement of Table 300-2. | - | M3 | - | - |
| 6 | CARRAIGE | - | - | - | - |
| 7 | SAND(19+1Km radius) | 43.83 | M3 | - | - |
| 8 | Stone chips (19+1Km radius) | 126.52 | M3 | - | - |
| 9 | metal stone (19+ 1 km) | 20.91 | M3 | 1 | ₹20.91 |
| 15 | ADD GST @18% | - | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.38 MB
BOQ_156569.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].