Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58,696.20Accepted-AOC DAKRA RANCHI PIN 829201 | CHATRA | JHARKHAND | 829201 | ₹58,696.20 Quoted ₹4.9 L | L1 | Accepted-AOC LOA |
| 2 | Rejected-Technical KOTA BASTI SHAKTINAGAR P O SHAKTINAGAR DISTT SONBHADRA U P 231222 | SONBHADRA | UTTAR PRADESH | 231222 | - | - | Rejected-Technical As per TC |
| 3 | Rejected-Technical NEAR RADHA KRISHNA MANDIR VIKASH BHAWAN JAYANT SINGRAULI MP PIN 486890 | SINGRAULI | MADHYA PRADESH | 486890 | - | - | Rejected-Technical As per TC |
| Sl No | Description | Qty | Unit | VISHAL ENGINEERING WORKS L2 | MOTI ENGINEERING WORKS L3 | New Diamond Engineering Services L1 |
|---|---|---|---|---|---|---|
| 1.00 | Labour Charges for Cleaning of Swing gear box, Swing Shaft & gear box housing, whole working area, draining of gear oil, cleaning of grease etc. (Labour consists of 01 no. supervisor and 01 nos. Semiskilled helper for a period of 4 shiftdays i.e. 2 shift X 2 days) including contractor profit; for each job ( LHS & RHS). | 2 | Job | 3,993 ₹7,986 | 3,772.56 ₹7,545.12 | 3,999 ₹7,998 |
| 2.00 | Labour Charges for Dismentaling of machine roof, Swing Motor, Swing Gear box assembly, Swing Housing, Swing shaft assembly, Bearings and Swing Pinion (Labour consists of 01 no. supervisor , 03 nos. Skilled fitter, 04nos. Semiskilled helper and 01 no. Skilled welder for a period of 6 shiftdays i.e. 2 shift X 3 days) including contractor profit; for each job ( LHS & RHS). | 2 | Job | 27,216 ₹54,432 | 25,716.24 ₹51,432.48 | 29,999 ₹59,998 |
| 3.00 | Labour charges for Plugging of all old holes, grinding of surface area and drilling of new holes for fitting of top cover swing gear box housing and housing fitted in the base, 22 nos. of holes for each job, ( Labour consists of 01 no. supervisor , 02 nos. Skilled fitter, 03nos. Semiskilled helper and 01 no. Skilled welder cum grinder man for a period of 8 shiftdays i.e. 2 shift X 4 days) including contractor profit; for each job ( LHS & RHS). | 2 | Job | 28,303 ₹56,606 | 26,723.2 ₹53,446.40 | 24,999 ₹49,998 |
| 4.00 | Charges for Drilling of 22 nos. new holes as per bolt size by heavy duty auto feed drill machine, 176 hours for each side job | 352 | Hours | 162 ₹57,024 | 225 ₹79,200 | 130 ₹45,760 |
| 5.00 | Labour charge for Repairing of Swing gear box housing cracks & straighting of bend in lower body base of Housing & Repairing/Rebuilding of worn out swing shaft housing and its Co-axial boring. ( Labour consists of 01 no. supervisor , 03 nos. Skilled fitter, 04nos. Semiskilled helper and 01 no. Skilled welder for a period of 12 shiftdays i.e. 2 shift X 6 days) including contractor profit; for each job ( LHS & RHS). | 2 | Job | 42,455 ₹84,910 | 40,149.8 ₹80,299.60 | 41,999 ₹83,998 |
| 6.00 | Co-axial cost of swing shaft Housing LHS OD-350mm, ID-330mm, Length-120mm, Qty. = 02 nos., Volume =2562.24 cubic meter for each side job (LHS & RHS), Rate = INR 58.42 per Cubic meter, Total charge for 01 no. Job = 2562.24 X 58.42= INR 1,49,686.06 | 2 | Job | 95,050 ₹1.9 L | 1,49,686.06 ₹3.0 L | 95,999 ₹1.9 L |
| 7.00 | Labour Charge for Refitting of Swing shaft, Gear Box Housing & Other assembly after repairing work (Labour consists of 01 no. supervisor , 03 nos. Skilled fitter, 04nos. Semiskilled helper and 01 no. Skilled welder for a period of 6 shiftdays i.e. 2 shift X 3 days) including contractor profit; for each job ( LHS & RHS). | 2 | Job | 27,216 ₹54,432 | 25,716.24 ₹51,432.48 | 23,000 ₹46,000 |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹9.4 L
EMD Value
₹11,800
Closing Date
9 Oct 2025, 9:00 amClosed
M K Pandey
O/o AGM Bina Area, NCL, District Sonebhadra, U.P. Pincode 231220
Cleaning, dismantling of Swing gear box assembly and housing, plugging of all old hole, drilling of new holes to be fitted top cover and swing gear box housing, repairing of housing cracks , boring of bearing housing of swing shaft assembly and refit
2025_NCL_344532_1
Bina/SO(Excv)/Tender/25-26/44 dt. 23.09.2025
Open Tender
Excavation Department Work
30 days
Onsite, Bina Project, NCL
As per NIT
5 documents required · 5 mandatory
₹11,800
22 Mar 2026
23 Sept 2025
10 Oct 2025
24 Sept 2025
9 Oct 2025
24 Sept 2025
24 Sept 2025 - 1 Oct 2025
Amount
Labour Charges for Cleaning of Swing gear box, Swing Shaft & gear box housing, whole working area, draining of gear oil, cleaning of grease etc. (Labour consists of 01 no. supervisor and 01 nos. Semiskilled helper for a period of 4 shiftdays i.e. 2 shift X 2 days) including contractor profit; for each job ( LHS & RHS).
Labour Charges for Dismentaling of machine roof, Swing Motor, Swing Gear box assembly, Swing Housing, Swing shaft assembly, Bearings and Swing Pinion (Labour consists of 01 no. supervisor , 03 nos. Skilled fitter, 04nos. Semiskilled helper and 01 no. Skilled welder for a period of 6 shiftdays i.e. 2 shift X 3 days) including contractor profit; for each job ( LHS & RHS).
Labour charges for Plugging of all old holes, grinding of surface area and drilling of new holes for fitting of top cover swing gear box housing and housing fitted in the base, 22 nos. of holes for each job, ( Labour consists of 01 no. supervisor , 02 nos. Skilled fitter, 03nos. Semiskilled helper and 01 no. Skilled welder cum grinder man for a period of 8 shiftdays i.e. 2 shift X 4 days) including contractor profit; for each job ( LHS & RHS).
Charges for Drilling of 22 nos. new holes as per bolt size by heavy duty auto feed drill machine, 176 hours for each side job
Labour charge for Repairing of Swing gear box housing cracks & straighting of bend in lower body base of Housing & Repairing/Rebuilding of worn out swing shaft housing and its Co-axial boring. ( Labour consists of 01 no. supervisor , 03 nos. Skilled fitter, 04nos. Semiskilled helper and 01 no. Skilled welder for a period of 12 shiftdays i.e. 2 shift X 6 days) including contractor profit; for each job ( LHS & RHS).
Co-axial cost of swing shaft Housing LHS OD-350mm, ID-330mm, Length-120mm, Qty. = 02 nos., Volume =2562.24 cubic meter for each side job (LHS & RHS), Rate = INR 58.42 per Cubic meter, Total charge for 01 no. Job = 2562.24 X 58.42= INR 1,49,686.06
Labour Charge for Refitting of Swing shaft, Gear Box Housing & Other assembly after repairing work (Labour consists of 01 no. supervisor , 03 nos. Skilled fitter, 04nos. Semiskilled helper and 01 no. Skilled welder for a period of 6 shiftdays i.e. 2 shift X 3 days) including contractor profit; for each job ( LHS & RHS).
Total impact of GST for the purpose of CTC
VISHAL ENGINEERING WORKS (BID ID -1189572)
MOTI ENGINEERING WORKS (BID ID -1189759)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_357152.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid