Tender Value
₹26.7 L
EMD Value
₹26,700
Closing Date
30 Jun 2026, 2:00 pm
Similar tender results from the same govt authority in the past 3 years.
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_681219_1
OT-001/26-27 of SE/GCC-I/CNI
Open Tender
Civil Works
120 days
Arani
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹26,700
Yes
16 Jun 2026
16 Jun 2026
1 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Labour charges for dismantling of Reinforced Cement Concrete and disposing the debris away from the SS permises including all materials, labour, lead and lift etc., complete as directed by the department engineer at site. | 6.3 | M3 | - | - | - |
| 2 | Labour charges for dismantling the Plain Cement Concrete met with below ground level during execution including labour, tools etc. complete. as directed by the department Engineer at site. | 11 | M3 | - | - | - |
| 3 | Labour charges for dismantling, clearing away and carefully stacking materials usefull for re-use of existing damaged Brick work / stone Masonry including the cost of all labour, transport, T&P, lead and lift etc., complete as directed by the department engineer at site. | 3 | M3 | - | - | - |
| 4 | Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 61.6 | M3 | - | - | - |
| 5 | Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Medium rock dense medium rock not requiring blasting 20% including cost of all materials lead lift etc complete as directed by the department engineer at site. | 15.4 | M3 | - | - | - |
| 6 | Supply and Filling with the foundation and basement with sand in layers not more than 10 cm thick well rammed including watering and consolidation as per standard specification, including cost of all labour, material, lead and lift etc., complete. as directed by the department at site. | 7 | M3 | - | - | - |
| 7 | Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 38.2 | M3 | - | - | - |
| 8 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal Without form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Raft | 23 | M3 | - | - | - |
| 9 | R.C.C. 1:1.5:3 using 12- 20mm metal with form work for Plinths, cable duct, cover slabs & Fire Protection wall using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 49 | M3 | - | - | - |
| 10 | R.C.C. 1:1.5:3 using 12- 20mm metal with form work for wall using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 10.5 | M3 | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_818639.xls
BOQ • 0.27 MB
OT001.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid