| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-AOC VILLAGE AND POST BELDA DISTRICT MUZAFFARNAGAR UTTAR PRADESH PIN CODE 251308 | BELDA | MUZAFFARNAGAR | UTTAR PRADESH | 251308 | ₹21.8 L | L1 | Accepted-AOC AGG WITH L1 |
| 2 | L2₹22.9 LRejected-AOC DHEERAHEDI POST BHOPA DISTRICT MUZAFFARNAGAR | BHOPA | MUZAFFARNAGAR | UTTAR PRADESH | ₹22.9 L | L2 | Rejected-AOC AGG WITH L1 |
| 3 | L3₹26.0 LRejected-AOC GRAM SAIDPUR KHURD TIKOLI DISTRICT BAGHPAT UTTAR PRADESH PIN CODE 250001 | BAGHPAT | BAGHPAT | UTTAR PRADESH | 250001 | ₹26.0 L | L3 | Rejected-AOC AGG WITH L1 |
| 4 | L4₹29.0 LRejected-AOC | ₹29.0 L | L4 | Rejected-AOC AGG WITH L1 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SUDHIR KUMAR CONTRACTOR L3 | VIKUL KUMAR L2 | M/S PARBHAT ENTERPRISES L1 | bhadana contractor L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismentling of B/W work & stacking of material within 60 mtrs including T & P, labour etc. complete | 15 | Cum | 400 ₹6,000 | 388 ₹5,820 | 250 ₹3,750 | 518 ₹7,770 |
| 2.00 | Dismentling of R.B./R.C.C. work & stacking of material within 60 mtrs including T & P, labour etc. complete | 6.32 | Cum | 550 ₹3,476 | 344 ₹2,174.08 | 260 ₹1,643.20 | 633 ₹4,000.56 |
| 3.00 | Laying dismentaled material in U/S and D/S of V.R.B. in bed of Dy. per cum. | 18.7 | cum | 80 ₹1,496 | 130 ₹2,431 | 100 ₹1,870 | 132 ₹2,468.40 |
| 4.00 | Earth work in excavation of foundation including all lead, lift and manual compaction. | 615.15 | Cum | 60 ₹36,909.06 | 78 ₹47,981.78 | 80 ₹49,212.08 | 100 ₹61,515.10 |
| 5.00 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 9.8 | Cum | 5,000 ₹49,000 | 4,500 ₹44,100 | 4,500 ₹44,100 | 5,024 ₹49,235.20 |
| 6.00 | Centering and shuttering for R.C.C. work including placing in position. | 277.52 | Sqm | 750 ₹2.1 L | 480 ₹1.3 L | 500 ₹1.4 L | 805 ₹2.2 L |
| 7.00 | Supply/Fixing Reinforcement for R.C.C. including bending, binding, cutting and placing in position of reinforcement Sted. SAIL, TATA and Tehri TMT including cost of bindng wire with cost of material including T&P, labour, etc. as per directed by Engineer in charge. | 6.14 | M.T | 70,000 ₹4.3 L | 60,000 ₹3.7 L | 48,000 ₹2.9 L | 72,400 ₹4.4 L |
| 8.00 | Providing and laying RCC 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. | 90.46 | Cum | 6,200 ₹5.6 L | 5,100 ₹4.6 L | 4,700 ₹4.3 L | 6,800 ₹6.2 L |
| 9.00 | C.C. 1:2:4 (M15) in wearing coat and bed flooring with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 65 | Cum | 5,900 ₹3.8 L | 5,000 ₹3.3 L | 4,500 ₹2.9 L | 6,054 ₹3.9 L |
| 10.00 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. | 23.62 | Sqm | 140 ₹3,306.80 | 150 ₹3,543 | 140 ₹3,306.80 | 175 ₹4,133.50 |
Tender Value
₹29.1 L
EMD Value
₹2.9 L
Closing Date
7 Jan 2026, 12:00 pmClosed
EE MDGC Muzaffarnagar
EE MDGC Muzaffarnagar
Rajwaha Sidholi Ke Km 10.466 Par Chatigrasth VRB CumFall Ke Punh Nirman and VRB ke Upstream and Downstream me CC Lining Ka Karya
2025_UPIDC_1102985_6
TN-08/EE/2025-26
Open Tender
Civil Works
15 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹2.9 L
16 May 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
Dismentling of B/W work & stacking of material within 60 mtrs including T & P, labour etc. complete
Dismentling of R.B./R.C.C. work & stacking of material within 60 mtrs including T & P, labour etc. complete
Laying dismentaled material in U/S and D/S of V.R.B. in bed of Dy. per cum.
Earth work in excavation of foundation including all lead, lift and manual compaction.
P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete.
Centering and shuttering for R.C.C. work including placing in position.
Supply/Fixing Reinforcement for R.C.C. including bending, binding, cutting and placing in position of reinforcement Sted. SAIL, TATA and Tehri TMT including cost of bindng wire with cost of material including T&P, labour, etc. as per directed by Engineer in charge.
Providing and laying RCC 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge.
C.C. 1:2:4 (M15) in wearing coat and bed flooring with crushed aggregate & coarse sand with all cost of material, T&P and labour complete.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade.
Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. long with all cost of material, T&P and labour complete.
S/Fixing M.S. Steel wheel guard size of 100x150x80 mm with cost of material including T&P labour etc complete.
Painting letters up to 8cm with approved brand Enamel paint of super quality i/c cost of material T&P Labour etc. As per directed by Engineer in charge.
Supply & Fixing Sine Board of size (0.91x1.22cm) of M.S. Steel including painting & writing letters with approved synthetic enemel paint i/c cost of material T&P labour etc as per directed by engineer-in-charge.
Earth work in Back filling including lead upto 200m and lift 1.50m also I/c lavelling ,ramming ,dressing , labour T &P etc complete .
Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete.
Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete.
Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition.
Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect
Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work.
Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work.
Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work.
Note : The Quantities written above may increase or decrease as per requirement & site condition
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.75 MB
Tendernotice_2.pdf
PDF • 1.94 MB
BOQ_2033926.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid