Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.1 L+₹6,238.96 (2.99%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.2 L+₹7,407.46 (3.55%)Admitted-Finance 103 SADAR ROAD JORASHIB MANDIR NORTH BARRACKPORE KOL 700120 | NORTH BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 700120 | L3 | Admitted-Finance |
Tender Value
₹2.1 L
EMD Value
₹4,200
Closing Date
14 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
516 D H ROAD KOL-34
MAINTENANCE OF SEWER ADJUNCTS AT DINESH TEA STALL, SUKANTA NAGAR , MADAN MOHAN TALA, NEAR PR NO -64/1,64/1/K ETC AND BYE LANE OF R. R. ROY ROAD IN WARD NO.-122, BR.-XIII
2026_KMC_1047474_1
KMC/ XIII/122/10/26-27
Open Tender
CIVIL WORKS
Percentage
35 days
WARD-122
PLEASE REFER TENDER DOCS
5 documents required · 5 mandatory
₹0
₹4,200
18 Nov 2026
30 Oct 2026
17 Nov 2026
30 Oct 2026
14 Nov 2026
30 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR ETC.(C)-(I) MISCELLANEOUS
28.Cleaning rubbish, sludge, weeds scum, liquid earth, mud
etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc.
by mathor labour after removing concrete.Slab/manhole cover
etc.without damaging the same and refixing the same properly after
cleaning as necessary and removing thesludge etc.etc.by using iron
pans,buckets including all labour, tools & plants including removing
the spoils in dry condition and disposing thesame by truck beyond the
road side in conformity with municipal/corporation rules for such
disposal including loading into truck and cleaning the road side in all
respects as per direction of the Engineerin- Charge. (Payment will be
made on the basis of actual stack measurment of spoils in dry
condition at roadside) | 463.89 | CUBIC METER | 289 | ₹1,34,063.17 |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK
WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a)
In foundation and plinth | 4.06 | CUBIC METER | 5,575 | ₹22,634.5 |
| 3 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,
ceiling etc.) with sand and cement mortar including rounding off or
chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where
necessary (Ground floor).[Excluding cost of chipping over concrete
surface] i) With 1:6 cement mortar (b) 20 mm thick plaster | 42.58 | SQUARE METER | 167 | ₹7,110.86 |
| 4 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning
about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement
0.152 cu.m per100 sq.m. | 42.58 | SQUARE METER | 34 | ₹1,447.72 |
| 5 | Supplying empty Cement bags in good condition. ( Ref :PWD (Rds &
Brdgs)- 2018, Page No. 336 It. No. 18.28) | 0.3 | NUMBER 100 | 330 | ₹99 |
| 6 | Filling empty Cement bag with dry earth or sand, stitching the bag
(cost of thread included) and carrying and placing them in position
and all incidental charges complete but excluding cost of sand and
gunny bags. ( Ref :PWD (Rds & Brdgs)- 2018, Page No. 336 It. No.
18.29) | 0.3 | NUMBER 100 | 350 | ₹105 |
| 7 | Supplying, spreading and compacting Sand to required thickness, in
layers not exceeding 150 mm to proper gradient and camber,
inundating each layer by water and packing and ramming layer by
layer to achieve desired compaction, including lighting, guarding,
barricading and making adequate earthen bundh where necessary,
curing with water as per direction, mending cracks and depressions
by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate.
The compaction factor for dry, clean sand may be taken as 0.835.
(The payment is to be made on the basis of finished compacted
volume).
(c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page
No.245 & page-222 sl. No-4) | 1.04 | CUBIC METER | 1,172.6 | ₹1,220.68 |
| 8 | SUPPLYING, INSTALLING AND OPERATING OF 3" DIA
PORTABLE PUMP..........................COMPLETE IN ALL RESPECT | 120 | HOUR | 70 | ₹8,400 |
| 9 | Sub Total | - | - | - | - |
| 10 | GST 18% | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
TForm122102627.pdf
Tender Documents • 0.25 MB
BOQ_2565767.xls
BOQ • 0.28 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .